Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC | L1 | Accepted-AOC COUNCIL ACCEPTED | |
| 2 | L2₹1.7 L+₹813.86 (0.48%)Rejected-Finance | L2 | Rejected-Finance COUNCIL REJECTED |
| Sl No | Description | Qty | Unit | AHAMMAD KABEER P H L2 | MAVATHODY MOHAMED IBRAHIM L1 |
|---|---|---|---|---|---|
| 1.00PUBLIC WELL RENOVATION | |||||
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 0.96 | cum | 1,800 ₹1,728 | 1,730.2 ₹1,660.99 Lowest |
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 15 | hour | 290 ₹4,350 | 284.62 ₹4,269.3 Lowest |
| 1.00 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining | 90.43 | sqm | 290 ₹26,225.28 Lowest | 290.01 ₹26,226.18 |
| 1.00 | 5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) : 3 graded stone aggregate 20 mm nominal size) | 4.02 | cum | 8,600 ₹34,563.4 | 8,557 ₹34,390.58 Lowest |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 192.92 | kilogram | 99 ₹19,099.28 | 98.3 ₹18,964.23 Lowest |
| 1.01 | OD389511/2024-2025:Filling with 20 mm metal
Supplying and filling with 20mm metal outside of the ring for getting clean purified water
including all costs of material, conveyance charges, filling charges and consolidation charges, etc
complete (51.2.4 modified) | 9.04 | cum | 2,500 ₹22,607.5 | 2,495.78 ₹22,569.34 Lowest |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 0.48 | cum | 8,000 ₹3,840 | 7,990.85 ₹3,835.61 Lowest |
| 1.01 | 50.6.1.4:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand ) etc complete | 4.56 | cum | 6,000 ₹27,360 | 5,950 ₹27,132 Lowest |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 38 | sqm | 315 ₹11,970 | 314.11 ₹11,936.18 Lowest |
Tender Value
₹1.7 L
EMD Value
₹4,222
Closing Date
11 Mar 2025, 4:00 pmClosed
Assistant Engineer
AE office, Vallatholnagar GP
GENERAL VALLATHOL NAGAR GP Project No 17 25 OSSANKUNNU PUBLIC WELL RENNOVATION WARD 4 General Civil Work
2025_LSGD_743572_2
Etdr 04/24-25
Open Tender
Civil Works - Others
Item Rate
120 days
VALLATHOL NAGAR GRAMA PANCHAYATH
Please refer Tender documents.
10 documents required · 10 mandatory
₹555
₹4,222
14 Nov 2025
28 Feb 2025
13 Mar 2025
28 Feb 2025
11 Mar 2025
28 Feb 2025
Amount
PUBLIC WELL RENOVATION
15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining
5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) : 3 graded stone aggregate 20 mm nominal size)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD389511/2024-2025:Filling with 20 mm metal Supplying and filling with 20mm metal outside of the ring for getting clean purified water including all costs of material, conveyance charges, filling charges and consolidation charges, etc complete (51.2.4 modified)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
50.6.1.4:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand ) etc complete
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
11.20.3:Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand).Dark shade pigment using ordinary cement
AHAMMAD KABEER P H (BID ID -2148999)
Bidder Name
MAVATHODY MOHAMED IBRAHIM
AHAMMAD KABEER P H
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1198378.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .