Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹2.0 L
Closing Date
21 Dec 2020, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASHWANI MISHRA
POWER GRID CORPORATION OF INDIA LIMITED, NR-1 RHQ, SECTOR 16A, FARIDABAD
Upgradation of HMI PC and NTAMC integration of SIEMENS make FSC at Ballabhgarh & Meerut Sub-Stations
N1/CandM/20-21/AM/OT/117 (Rfx number: 5002001511)
Open
Electrical - All
Works
Rajasthan
As provided in the tender documents
₹5,000
₹2.0 L
20 Nov 2020
20 Nov 2020
23 Dec 2020
20 Nov 2020
21 Dec 2020
20 Nov 2020
14 Dec 2020
FSC SIGNAL LIST OF BALLABHGARH SUBSTATION (FOR ONE FSC)
S.no WinCC Signal Number Signal Description Signal Source Signal Information/Remarks
1 33192 Control system 1 hardware alarm =R11+SR11.B01 \nCPU 1 (Plant Control) in system 1
33194 Protection system 1 hardware alarm =R11+SR11.B10 \nCPU 2 (Protection) in system 1
30849 Control & Protection system 1 communication fault =R11+SR11.B \nTDC system 1 (OLC + PR)
30852 Protection system 1 measuring system warning =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1
33198 Control system 2 hardware alarm =R12+SR12.B01 \nCPU 1 (Plant Control) in system 2
33200 Protection system 2 hardware alarm =R12+SR12.B10 \nCPU 2 (Protection) in system 2
30861 Control & Protection system 2 communication fault =R12+SR12.B \nTDC system 2 (OLC+PR)
30864 Protection system 2 measuring system warning =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2
33204 Control & Protection system power supply alarm =Rx+SRx.B \nControl & Protection System AC- or DC-MCB tripped
30873 Control & Protection system redundancy disturbed =Rx+SRx.B \nControl & Protection System Changeover blocked
33208 Bank ground switch 1 alarm ES1-CD \nBank ground switch 1
33210 Bank ground switch 2 alarm ES2-CD \nBank ground switch 2
33212 Disconnect switch 1 alarm DS1-CD \nBank disconnect switch 1
33214 Disconnect switch 2 alarm DS2-CD \nBank disconnect switch 2
33216 Main bypass switch alarm MBS-CD \nMain bypass switch
35582 Bypass breaker 1: Feedback closed phase R BBR1-CD \nBypass breaker 1 BBR: Pole -L1 closed. (=X2+SP2-A1 /6MD01BI1)
35585 Bypass breaker 1: Feedback open phase R BBR1-CD \nBypass breaker 1 BBR: Pole -L1 open. (=X2+SP2-A1 /6MD01BI2)
35583 Bypass breaker 1: Feedback closed phase Y BBR1-CD \nBypass breaker 1 BBR: Pole -L2 closed. (=X2+SP2-A1 /6MD01BI3)
35586 Bypass breaker 1: Feedback open phase Y BBR1-CD \nBypass breaker 1 BBR: Pole -L2 open. (=X2+SP2-A1 /6MD01BI4)
35581 Bypass breaker 1: Feedback closed phase B BBR1-CD \nBypass breaker 1 BBR: Pole -L3 closed. (=X2+SP2-A1 /6MD01BI5)
35584 Bypass breaker 1: Feedback open phase B BBR1-CD \nBypass breaker 1 BBR: Pole -L3 open. (=X2+SP2-A1 /6MD01BI6)
35507 Disconnect switch 1: Feedback closed DS1-CD \nBank disconnect switch 1 DS1: Pole -L1 closed. (=X2+SP2-A1 /6MD01BI7)
35508 Disconnect switch 1: Feedback open DS1-CD \nBank disconnect switch 1 DS1: Pole -L1 open. (=X2+SP2-A1 /6MD01BI8)
35509 Disconnect switch 2: Feedback closed DS2-CD \nBank disconnect switch 2 DS2: Pole -L1 closed. (=X2+SP2-A1 /6MD01BI9)
35510 Disconnect switch 2: Feedback open DS2-CD \nBank disconnect switch 2 DS2: Pole -L1 open. (=X2+SP2-A1 /6MD01BI10)
35511 Main bypass switch: Feedback closed MBS-CD \nMain bypass switch MBS: Pole -L1 closed. (=X2+SP2-A1 /6MD01BI11)
35512 Main bypass switch: Feedback open MBS-CD \nMain bypass switch MBS: Pole -L1 open. (=X2+SP2-A1 /6MD01BI12)
35486 Bank ground switch 1: Feedback closed ES1-CD \nBank ground switch 1 ES1: Pole -L1 close. (=X2+SP2-A1 /6MD01BI13)
35487 Bank ground switch 1: Feedback open ES1-CD \nBank ground switch 1 ES1: Pole -L1 open. (=X2+SP2-A1 /6MD01BI14)
35488 Bank ground switch 2: Feedback closed ES2-CD \nBank ground switch 2 ES2: Pole -L1 closed. (=X2+SP2-A1 /6MD01BI15)
35489 Bank ground switch 2: Feedback open ES2-CD \nBank ground switch 2 ES2: Pole -L1 open. (=X2+SP2-A1 /6MD01BI16)
30924 Bypass breaker 1: Status remote operation BBR1-CD \nBypass breaker 1 BBR: Operation via operator station enabled. (=X2+SP2-A1 /6MD01BI21)
30928 Bypass breaker 1: Alarm low oil pressure - opening lockout BBR1-CD \nBypass breaker 1 BBR: Low oil pressure. Opening is locked. (=X2+SP2-A1 /6MD01BI22)
30926 Bypass breaker 1: Hydraulic circuit general alarm BBR1-CD \nBypass breaker 1 BBR: Hydraulic system alarm (=X2+SP2-A1 /6MD01BI23)
30928 Bypass breaker 1: Alarm low oil pressure - opening lockout BBR1-CD \nBypass breaker 1 BBR: Low oil Pressure. Opening is locked (=X2+SP2-A1 /6MD01BI24)
30930 Bypass breaker 1: Lockout low oil pressure - general lockout BBR1-CD \nBypass breaker 1 BBR: Low oil pressure. Operation is locked. (=X2+SP2-A1 /6MD01BI25)
30932 Bypass breaker 1: Alarm low N2 pressure BBR1-CD \nBypass breaker 1 BBR: Low N2 pressure(=X2+SP2-A1 /6MD01BI26)
30934 Bypass breaker 1: Lockout low N2 pressure BBR1-CD \nBypass breaker 1 BBR: Low N2 pressure for more than 3 h. Operation is locked (=X2+SP2-A1 /6MD01BI27)
30936 Bypass breaker 1: Alarm low SF6 pressure BBR1-CD \nBypass breaker 1 BBR: Low SF6 pressure Alarm (=X2+SP2-A1 /6MD01BI28)
30938 Bypass breaker 1: Lockout low SF6 pressure BBR1-CD \nBypass breaker 1 BBR: Lockout on Low SF6 pressure. (=X2+SP2-A1 /6MD01BI29)
30940 Bypass breaker 1: General lockout BBR1-CD \nBypass breaker 1 BBR: Group alarm. Loss of N2 / oil / SF6. Check messages for further information.(=X2+SP2-A1 /6MD01BI30)
30946 Bypass breaker 1: Motor MCB tripped BBR1-CD \nBypass breaker 1 BBR: MCB trip. Check wiring and pumps. (=X2+SP2-A1 /6MD01BI32)
30966 Disconnect switch 1: Status remote operation DS1-CD \nBank disconnect switch 1 DS1: Operation via operator station enabled. (=X2+SP2-A1 /6MD01BI35)
30968 Disconnect switch 1: Fault DS1-CD \nBank disconnect switch 1 DS1: Motor MCB overload trip. Check wiring and motors. (=X2+SP2-A1 /6MD01BI36)
30982 Disconnect switch 2: Status remote operation DS2-CD \nBank disconnect switch 2 DS2: Operation via operator station enabled. (=X2+SP2-A1 /6MD01BI39)
30984 Disconnect switch 2: Fault DS2-CD \nBank disconnect switch 2 DS2: Motor MCB overload trip. Check wiring and motors. (=X2+SP2-A1 /6MD01BI40)
30998 Main bypass switch: Status remote operation MBS-CD \nMain bypass switch MBS: Operation via operator station enabled. (=X2+SP2-A2 /6MD01BI43)
31000 Main bypass switch: Fault MBS-CD \nMain bypass switch MBS: Motor MCB overload trip. Check wiring and motors. (=X2+SP2-A2 /6MD01BI44)
31014 Bank ground switch 1: Status remote operation ES1-CD \nBank ground switch 1 ES1: Operation via operator station enabled. (=X2+SP2-A2 /6MD01BI47)
31016 Bank ground switch 1: Fault ES1-CD \nBank ground switch 1 ES1: Motor MCB overload trip. Check wiring and motors. (=X2+SP2-A2 /6MD01BI48)
31030 Bank ground switch 2: Status remote operation ES2-CD \nBank ground switch 2 ES2: Operation via operator station enabled. (=X2+SP2-A2 /6MD01BI51)
31032 Bank ground switch 2: Fault ES2-CD \nBank ground switch 2 ES2: Motor MCB overload trip. Check wiring and motors. (=X2+SP2-A2 /6MD01BI52)
35578 Bank ground switch 2: Fault 2 ES2-CD \nBank ground switch 2 ES2: Motor MCB overload trip. Check wiring and motors. (=X2+SP2-A2 /6MD01BI53)
35579 Bank ground switch 2: Fault 3 ES2-CD \nBank ground switch 2 ES2: Motor MCB overload trip. Check wiring and motors. (=X2+SP2-A2 /6MD01BI54)
31034 Line side 1: Deenergized Customer \nLine Protection Interface Transmission line on side 1 (side of DS1): De-energized. (=X2+SP2-A2 /6MD01BI55)
31036 Line side 2: Deenergized Customer \nLine Protection Interface Transmission line on side 2 (side of DS2): De-energized. (=X2+SP2-A2 /6MD01BI56)
31042 Plant control: Gate closed =Rx+SRx.B \nPlant Control - active System Ladder: Down / Gate: Closed / Kirk Key: Locked. (=X2+SP2-A2 /6MD01BI61)
31049 Plant interface: Field wetting power supply fault =X3+SE3-F311 \nField wetting DC feeder 220V =X3+SE3: MCB -F311 trip. Check wiring into the yard. (=X2+SP2-A2 /6MD01BI62)
35568 6MD01: DQ 2 not used DS1-CD \nBank disconnect switch 1 (=X2+SP2-A1 / 6MD01DQ2)
35569 6MD01: DQ 3 not used DS1-CD \nBank disconnect switch 1 (=X2+SP2-A1 / 6MD01DQ3)
35570 6MD01: DQ 4 not used DS1-CD \nBank disconnect switch 1 (=X2+SP2-A1 / 6MD01DQ4)
35571 6MD01: DQ 5 not used DS1-CD \nBank disconnect switch 1 (=X2+SP2-A1 / 6MD01DQ5)
35572 6MD01: DQ 6 not used DS1-CD \nBank disconnect switch 1 (=X2+SP2-A1 / 6MD01DQ6)
35573 6MD01: DQ 7 not used DS1-CD \nBank disconnect switch 1 (=X2+SP2-A1 / 6MD01DQ7)
35574 6MD01: DQ 8 not used DS1-CD \nBank disconnect switch 1 (=X2+SP2-A1 / 6MD01DQ8)
35575 6MD01: DQ 9 not used DS1-CD \nBank disconnect switch 1 (=X2+SP2-A1 / 6MD01DQ9)
35559 6MD01: DQ 10 not used DS2-CD \nBank disconnect switch 2 (=X2+SP2-A1 / 6MD01DQ10)
35560 6MD01: DQ 11 not used DS2-CD \nBank disconnect switch 2 (=X2+SP2-A1 / 6MD01DQ11)
35561 6MD01: DQ 12 not used DS2-CD \nBank disconnect switch 2 (=X2+SP2-A1 / 6MD01DQ12)
35562 6MD01: DQ 13 not used DS2-CD \nBank disconnect switch 2 (=X2+SP2-A1 / 6MD01DQ13)
35563 6MD01: DQ 14 not used DS2-CD \nBank disconnect switch 2 (=X2+SP2-A1 / 6MD01DQ14)
35564 6MD01: DQ 15 not used DS2-CD \nBank disconnect switch 2 (=X2+SP2-A1 / 6MD01DQ15)
35565 6MD01: DQ 16 not used DS2-CD \nBank disconnect switch 2 (=X2+SP2-A1 / 6MD01DQ16)
35566 6MD01: DQ 17 not used DS2-CD \nBank disconnect switch 2 (=X2+SP2-A1 / 6MD01DQ17)
35567 6MD01: DQ 18 not used DS2-CD \nBank disconnect switch 2 (=X2+SP2-A1 / 6MD01DQ18)
35530 Plant control: Open command to disconnect switch 1 DS1-CD \nBank disconnect switch 1 (=X2+SP2-A1 / 6MD01BO23)
35520 Plant control: Close command to disconnect switch 1 DS1-CD \nBank disconnect switch 1 (=X2+SP2-A1 / 6MD01BO24)
35525 Plant control: Enable to disconnect switch 1 DS1-CD \nBank disconnect switch 1 (=X2+SP2-A1 / 6MD01BO25)
35531 Plant control: Open command to disconnect switch 2 DS2-CD \nBank disconnect switch 2 (=X2+SP2-A1 / 6MD01BO26)
35521 Plant control: Close command to disconnect switch 2 DS2-CD \nBank disconnect switch 2 (=X2+SP2-A1 / 6MD01BO27)
35526 Plant control: Enable to disconnect switch 2 DS2-CD \nBank disconnect switch 2 (=X2+SP2-A1 / 6MD01BO28)
35532 Plant control: Open command to main bypass switch MBS-CD \nMain bypass switch (=X2+SP2-A1 / 6MD01BO29)
35522 Plant control: Close command to main bypass switch MBS-CD \nMain bypass switch (=X2+SP2-A1 / 6MD01BO30)
35527 Plant control: Enable to main bypass switch MBS-CD \nMain bypass switch (=X2+SP2-A1 / 6MD01BO31)
35523 Plant control: Enable to bank ground switch 1 ES1-CD \nBank ground switch 1 (=X2+SP2-A1 / 6MD01BO34)
35524 Plant control: Enable to bank ground switch 2 ES2-CD \nBank ground switch 2 (=X2+SP2-A1 / 6MD01BO37)
31289 Plant control: Opening of gate enabled =Rx+SRx.B \nPlant Control - active System Kirk key: Released. (=X2+SP2-A1 / 6MD01BO41)
31289 Plant control: Opening of gate enabled =Rx+SRx.B \nPlant Control - active System Kirk key: Released. (=X2+SP2-A3 / SU3BO22)
1184 Operator command: Select HMI local control OS \nAny operator station (used for commands)
1075 Operator command: Start general scan OS \nAny operator station (used for commands)
3173 Operator command: Close bank ground switch 1 OS \nAny operator station (used for commands)
3171 Operator command: Open bank ground switch 1 OS \nAny operator station (used for commands)
3177 Operator command: Close bank ground switch 2 OS \nAny operator station (used for commands)
3175 Operator command: Open bank ground switch 2 OS \nAny operator station (used for commands)
3181 Operator command: Close disconnect switch 1 OS \nAny operator station (used for commands)
3179 Operator command: Open disconnect switch 1 OS \nAny operator station (used for commands)
3185 Operator command: Close disconnect switch 2 OS \nAny operator station (used for commands)
3183 Operator command: Open disconnect switch 2 OS \nAny operator station (used for commands)
3189 Operator command: Close main bypass switch OS \nAny operator station (used for commands)
3187 Operator command: Open main bypass switch OS \nAny operator station (used for commands)
3193 Operator command: Close line ground switch 1 OS \nAny operator station (used for commands)
3197 Operator command: Close line ground switch 2 OS \nAny operator station (used for commands)
3201 Operator command: Close bypass breaker 1 OS \nAny operator station (used for commands)
3199 Operator command: Open bypass breaker 1 OS \nAny operator station (used for commands)
1036 Operator command: Select emergency mode OS \nAny operator station (used for commands)
1038 Operator command: Select normal mode OS \nAny operator station (used for commands)
1040 Operator command: Select System 1 as active System OS \nAny operator station (used for commands)
1042 Operator command: Select System 2 as active System OS \nAny operator station (used for commands)
31323 Operator command: Start sequence to "Disconnected" OS \nAny operator station (used for commands) =B0: Requested status of platform: Disconnected
31326 Operator command: Start sequence to "Bypassed" OS \nAny operator station (used for commands) =B0: Requested status of platform: Bypassed
31329 Operator command: Start sequence to "Inserted" (Seg1) OS \nAny operator station (used for commands) =B0: Requested status of platform: Segment 1 inserted
1064 Operator command: Sequence stop OS \nAny operator station (used for commands)
1046 Operator command: Reset protection lockout OS \nAny operator station (used for commands)
3217 Operator command: Measured values source system 1 OS \nAny operator station (used for commands)
3219 Operator command: Measured values source system 2 OS \nAny operator station (used for commands)
3221 Operator command: Block protection 1 OS \nAny operator station (used for commands)
3223 Operator command: Unblock protection 1 OS \nAny operator station (used for commands)
3225 Operator command: Block protection 2 OS \nAny operator station (used for commands)
18217 Operator command: Unblock protection 2 OS \nAny operator station (used for commands)
31354 Operator command: Auto-reinsertion on OS \nAny operator station (used for commands)
31357 Operator command: Auto-reinsertion off OS \nAny operator station (used for commands)
31360 Operator command: Single-phase operation OS \nAny operator station (used for commands)
31363 Operator command: Three-phase operation OS \nAny operator station (used for commands)
1294 Operator command: Protection parameter change request OS \nAny operator station (used for commands)
31378 Command: Originated from HMI local =X3+SE3 \nLocal HMI
31399 Plant control: No operator station selected =Rx+SRx.B \nPlant Control - active System Operation by any remote operator station: Blocked. Check local / remote switch
31401 Plant control: Operator station HMI local selected =Rx+SRx.B \nPlant Control - active System
31411 Plant control: Operator station change prohibited OS \nAny operator station (used for commands) Changing to another HMI or other operator station: Blocked. Check HMI for further fault indications. Check login and access rights.
31413 Plant control: Automatic sequence aborted =Rx+SRx.B \nPlant Control - active System Automatic sequence: Stopped due to fault condition. Check HMI for further fault indications. Restart sequence after clearing.
31415 Plant control: Automatic sequence stopped =Rx+SRx.B \nPlant Control - active System
31419 Plant control: Status platform disconnected =Rx+SRx.B \nPlant Control - active System =B0: Platform disconnected.
31438 Plant control: Automatic insert sequence active =Rx+SRx.B \nPlant Control - active System
31440 Plant control: Automatic disconnect sequence active =Rx+SRx.B \nPlant Control - active System
31442 Plant control: Normal mode selected =Rx+SRx.B \nPlant Control - active System
31444 Plant control: Emergency mode selected =Rx+SRx.B \nPlant Control - active System Emergency mode: Selected. Reduced interlocking to disconnect the bank. Capacitors are discharged (timer controlled) and line de-energized.
31446 Plant control: Operation mode change prohibited =Rx+SRx.B \nPlant Control - active System Changing of mode of operation (normal
31448 System 1: 220/24VDC MCB tripped =X3+SE3-F112/-F113/-F114 \nSystem 1 DC feeder 220V/24V =X3+SE3: MCB trip. Check wiring and power supply.
31451 System 2: 220/24VDC MCB tripped =X3+SE3-F212/-F213/-F214 \nSystem 2 DC feeder 220V/24V =X3+SE3: MCB trip. Check wiring and power supply.
31454 System 1/2: 220/24VDC MCB tripped =X3+SE3-F100/-F111/-F200/-F211/-F310/-F314/-F315 \nSystem 1/2 DC feeder 220V/24V =X3+SE3: MCB trip. Check wiring and power supply.
31457 Field wetting: MCB tripped =X3+SE3-F311 \nField wetting DC feeder 220V =X3+SE3: MCB trip. Check wiring into the yard and power supply.
31460 AC power supply: MCB tripped =X3+SE3-F3 \nAC feeder in C&P =X3+SE3: MCB trip. Check AC socket outlet. Check connected devices.
31469 DC distribution 1: Alarm =NK01 \nDC distribution 1 =NK01: Check DC Distribution 1 supply. Check wiring for short circuits.
31472 DC distribution 2: Alarm =NK01 \nDC distribution 2 =NK01: Check DC Distribution 2 supply. Check wiring for short circuits.
35676 AC distribution 1: Alarm =NK01 \nAC distribution =NF01: Check AC Distribution supply. Check wiring for short circuits.
35677 AC Distribution 2 : Alarm =NK01 \nAC distribution =NF01: Check AC Distribution supply. Check wiring for short circuits.
31481 Air condition: Alarm A/C \nAir condition Local control room: Check aircondition system.
31487 Fault recorder: Triggered =X2+SP2-EH11 \nFault recorder =X2+SP2: TFR has triggered.
31490 Emergency bypass: Activated =X2+SP2-S6 \nEmergency close button =X2+SP2: Emergency bypass push-button operated. Permanent bypass of BBR1 and BBR2.
31493 Redundancy changeover: Blocked =R11+SR11-S101 \nCOL blocking switch
31496 Bank ground switch 1: Equivalence failure ES1-CD \nBank ground switch 1 ES1: Open & close position at the same time or no check back signals. Check ES1. Check electrical cicruits.
31498 Bank ground switch 1: Runtime failure ES1-CD \nBank ground switch 1 ES1: Switch has not reached the selected position within preset running time. Check ES1. Check operation of the switch.
31500 Bank ground switch 1: Switched without command ES1-CD \nBank ground switch 1 ES1: Switch has operated without command of any operator station.
31507 Bank ground switch 1: Interlocking ES1-CD \nBank ground switch 1
31509 Bank ground switch 2: Equivalence failure ES2-CD \nBank ground switch 2 ES2: Open & close position at the same time or no check back signals. Check ES2. Check electrical cicruits.
31511 Bank ground switch 2: Runtime failure ES2-CD \nBank ground switch 2 ES2: Switch has not reached the selected position within preset running time. Check ES2. Check operation of the switch.
31513 Bank ground switch 2: Switched without command ES2-CD \nBank ground switch 2 ES2: Switch has operated without command of any operator station.
31520 Bank ground switch 2: Interlocking ES2-CD \nBank ground switch 2
31522 Disconnect switch 1: Equivalence failure DS1-CD \nBank disconnect switch 1 DS1: Open & close position at the same time or no check back signals. Check DS1. Check electrical cicruits.
31524 Disconnect switch 1: Runtime failure DS1-CD \nBank disconnect switch 1 DS1: Switch has not reached the selected position within preset running time. Check DS1. Check operation of the switch.
31526 Disconnect switch 1: Switched without command DS1-CD \nBank disconnect switch 1 DS1: Switch has operated without command of any operator station.
31533 Disconnect switch 1: Interlocking DS1-CD \nBank disconnect switch 1
31535 Disconnect switch 2: Equivalence failure DS2-CD \nBank disconnect switch 2 DS2: Open & close position at the same time or no check back signals. Check DS2. Check electrical cicruits.
31537 Disconnect switch 2: Runtime failure DS2-CD \nBank disconnect switch 2 DS2: Switch has not reached the selected position within preset running time. Check DS2. Check operation of the switch.
31539 Disconnect switch 2: Switched without command DS2-CD \nBank disconnect switch 2 DS2: Switch has operated without command of any operator station.
31546 Disconnect switch 2: Interlocking DS2-CD \nBank disconnect switch 2
31548 Main bypass switch: Equivalence failure MBS-CD \nMain bypass switch MBS: Open & close position at the same time or no check back signals. Check MBS. Check electrical cicruits.
31550 Main bypass switch: Runtime failure MBS-CD \nMain bypass switch MBS: Switch has not reached the selected position within preset running time. Check MBS. Check operation of the switch.
31552 Main bypass switch: Switched without command MBS-CD \nMain bypass switch MBS: Switch has operated without command of any operator station.
31554 Main bypass switch: Interlocking MBS-CD \nMain bypass switch
31568 Bypass breaker 1: Equivalence failure BBR1-CD \nBypass breaker 1 BBR1: Open & close position at the same time or no check back signals. Check BBR1. Check electrical cicruits.
31570 Bypass breaker 1: Runtime failure BBR1-CD \nBypass breaker 1 BBR1: Switch has not reached the selected position within preset running time. Check BBR1. Check operation of the switch.
31572 Bypass breaker 1: Switched without command BBR1-CD \nBypass breaker 1 BBR1: Switch has operated without command of any operator station.
31579 Bypass breaker 1: Interlocking BBR1-CD \nBypass breaker 1
32192 System 1: Controller system fault =R11+SR11.B \nTDC system 1 (OLC + PR) =R11+SR11: Check Simatic TDC.
32195 System 1: Controller power supply fault =R11+SR11.B \nTDC system 1 (OLC + PR) =R11+SR11: Check Simatic TDC.
32198 System 1: Controller fan fault =R11+SR11.B \nTDC system 1 (OLC + PR) =R11+SR11: Check Simatic TDC.
32201 System 1: Cubicle overtemperature =R11+SR11-S131 \nCubicle temperature system1 =R11+SR11: Check venting (fans
31600 System 1: Line voltage transducer MCB tripped +X2-F141 \nLine voltage measuring transducer supervision 1 =R11+SR11: MCB trip. Check wiring of line voltage measurement. Check voltage transformer.
35626 System 1: Monitor Lockout =R11+SR11.B03 \nLO6A #2 in system 1
31603 System 1: Lockout relais closed =R11+SR11-K110 / -K120 \nLockout relais 1 =R11+SR11: Status information of lockout relays (-K11
31606 System 2: Lockout relais closed =R12+SR12-K21 / -K22 \nLockout relais 2 =R12+SR12: Status information of lockout relays (-K11
31609 Operator command: Reset lockout =X2+SR1-S7 / +SR2-S7 \nReset lockout button
31612 System 1: Fast bypass =R11+SR11.B10 \nCPU 2 (Protection) in system 1
31617 System 1: External command: Open bypass breaker Customer \nLine Protection Interface
35616 System 1: External bypass phase R Customer \nLine Protection Interface =R11+SR11: Temporary bypass command from external device (Line protection).
35617 System 1: External bypass phase Y Customer \nLine Protection Interface =R11+SR11: Temporary bypass command from external device (Line protection).
35615 System 1: External bypass phase B Customer \nLine Protection Interface =R11+SR11: Temporary bypass command from external device (Line protection).
31653 System 1: MOV overtemperature =B0-F1 \nMOV protection functions =R11+SR11: MOV temperature >125°C due to line faults. Reinsertion released as soon as MOV temperature <65°C. No automatic reinsertion.
31656 System 1: MOV high current =B0-F1 \nMOV protection functions =R11+SR11: Excessive MOV current due to line faults. Fast automatic reinsertion follows if enabled.
31659 System 1: MOV temperature gradient high =B0-F1 \nMOV protection functions =R11+SR11: MOV temperature has increased rapidly due to line faults. Fast automatic reinsertion follows if enabled.
31662 System 1: MOV temperature gradient low =B0-F1 \nMOV protection functions =R11+SR11: MOV temperature has exceeded rating due to line faults. Automatic reinsertion follows after 60s if enabled.
35629 System 1: MOV fault branch -F1 phase R =B0-F1 \nMOV protection functions =R11+SR11: Defective MOV branch. Check TFR recordings. Check MOV installation.
35630 System 1: MOV fault branch -F1 phase Y =B0-F1 \nMOV protection functions =R11+SR11: Defective MOV branch. Check TFR recordings. Check MOV installation.
35628 System 1: MOV fault branch -F1 phase B =B0-F1 \nMOV protection functions =R11+SR11: Defective MOV branch. Check TFR recordings. Check MOV installation.
35632 System 1: MOV fault branch -F2 phase R =B0-F1 \nMOV protection functions =R11+SR11: Defective MOV branch. Check TFR recordings. Check MOV installation.
35633 System 1: MOV fault branch -F2 phase Y =B0-F1 \nMOV protection functions =R11+SR11: Defective MOV branch. Check TFR recordings. Check MOV installation.
35631 System 1: MOV fault branch -F2 phase B =B0-F1 \nMOV protection functions =R11+SR11: Defective MOV branch. Check TFR recordings. Check MOV installation.
31683 System 1: Gap refused trigger =B0-F51 \nGap protection functions =R11+SR11: No spark gap operation after trigger signal. Check TFR recording. Check spark gap assembly and trigger devices.
31686 System 1: Gap delayed trigger =B0-F51 \nGap protection functions =R11+SR11: Delayed spark gap operation after trigger signal. Check TFR recording. Check spark gap assembly and trigger devices.
31689 System 1: Gap prolonged conduction =B0-F51 \nGap protection functions =R11+SR11: Excessive spark gap operation. Check TFR recording. Check spark gap assembly and trigger devices. Check bypass and line breakers.
31692 System 1: Gap self trigger =B0-F51 \nGap protection functions =R11+SR11: Spark gap operation without trigger command from protection systems. Check TFR recording. Check spark gap assembly
31725 System 1: Bypass breaker failed to close BBR1-CD \nBypass breaker own segment =R11+SR11: BBR has failed to close after command. Check TFR recording. Check HMI for further fault indications of BBR. Check bypass breaker
31728 System 1: Bypass breaker failed to open BBR1-CD \nBypass breaker own segment =R11+SR11: BBR has failed to open after command. Check TFR recording. Check HMI for further fault indications of BBR. Check bypass breaker
35678 System 1: Bypass breaker aux. contact discordance BBR1-CD \nBypass breaker own segment =R11+SR11: Poles of BBR are in different or undefined position. Check TFR recording. Check HMI for further fault indications of BBR. Check bypass breaker and wiring.
35680 System 1: Bypass breaker Pole discordance
35619 System 1: Gap trigger phase R =B0-F51 \nGap protection functions =R11+SR11: Gap trigger command.
35620 System 1: Gap trigger phase Y =B0-F51 \nGap protection functions =R11+SR11: Gap trigger command.
35618 System 1: Gap trigger phase B =B0-F51 \nGap protection functions =R11+SR11: Gap trigger command.
31743 System 1: MOV temperature too high for reinsertion =B0-F1 \nMOV protection functions =R11+SR11: MOV temperature >65°C. Reinsertion blocked.
31746 System 1: MOV overload =B0-F1 \nMOV protection functions =R11+SR11: Group alarm of MOV protection. Check HMI for further fault messages. Check TFR recording.
31749 System 1: MOV unbalance =B0-F1 \nMOV protection functions =R11+SR11: MOV failure. Check TFR recordings. Check MOV installation.
31752 System 1: Platform protection =B0 \nPlatform =R11+SR11: Flash-over on platform assembly. Check TFR recordings. Check platform structure and installation.
31755 System 1: Gap protection =B0-F51 \nGap protection functions =R11+SR11: Group alarm of gap protection. Check HMI for further fault messages. Check TFR recordings.
31761 System 1: Capacitor unbalance alarm =B0-C3x \nCapacitor protection functions =R11+SR11: Single cap. fuses are blown / single cap. elements are shorted. Observe capacitor. Check capacitor at next maintenance. Measure capacity of capacitor units
31764 System 1: Capacitor unbalance bypass =B0-C3x \nCapacitor protection functions =R11+SR11: Critical number of cap. fuses are blown / cap. elements are shorted. Check TFR recording. Check capacitor. Measure capacity of capacitor units
31767 System 1: Capacitor overload =B0-C3x \nCapacitor protection functions =R11+SR11: Capacitor current / voltage above rating. Check transmission system. Check impedance setting (TCSC only). Insert manually after the overload situation has cleared.
31773 System 1: Bypass breaker fail BBR1-CD \nBypass breaker own segment =R11+SR11: Group alarm of BBR supervision. Check HMI for further fault messages. Check TFR recording. Check BBR.
35635 System 1: Phase indication: Phase R =R11+SR11.B \nTDC system 1 (OLC + PR) =R11+SR11: Indication of affected phase. Check for further fault messages.
35636 System 1: Phase indication: Phase Y =R11+SR11.B \nTDC system 1 (OLC + PR) =R11+SR11: Indication of affected phase. Check for further fault messages.
35634 System 1: Phase indication: Phase B =R11+SR11.B \nTDC system 1 (OLC + PR) =R11+SR11: Indication of affected phase. Check for further fault messages.
31788 System 1: Protection blocked =R11+SR11.B \nTDC system 1 (OLC + PR) =R11+SR11: Protection system not active. Check for further fault messages. Check parameter settings.
31791 System 1: Reset lockout =R11+SR11-K110 / -K120 \nLockout relais 1 =R11+SR11: Reset command to lockout relays -K11
31794 System 1: Permanent bypass BBR1-CD \nBypass breaker own segment =R11+SR11: Permanent closing of BBR. Check HMI for further fault messages. Check TFR recording. Reinsertion is blocked and requires reset of relay -K11.
35639 System 1: Temporary bypass phase R BBR1-CD \nBypass breaker own segment =R11+SR11: Temporary closing of BBR. Check HMI for further fault messages. Reinsertion released
35640 System 1: Temporary bypass phase Y BBR1-CD \nBypass breaker own segment =R11+SR11: Temporary closing of BBR. Check HMI for further fault messages. Reinsertion released
35638 System 1: Temporary bypass phase B BBR1-CD \nBypass breaker own segment =R11+SR11: Temporary closing of BBR. Check HMI for further fault messages. Reinsertion released
31806 System 1: Reinsertion BBR1-CD \nBypass breaker own segment =R11+SR11: Opening command to BBR.
31809 System 1: Line trip =R11+SR11.B10 \nCPU 2 (Protection) in system 1 =R11+SR11: Trip command to line protection. Check HMI for further fault messages. Check TFR recording. Check BBR and cooling system. Bypassing of bank via MBS is released after line is de-energized and capacitors are discharged (10min).
35610 System 1: Communication fault 6MD =X2+SP2-A1 \nSU200 #1 (Binary interface) =R11+SR11: Check fieldbus system and SU200 interface units within =X2+SP2.
31829 System 1: Communication fault local HMI =R11+SR11.B01 \nCPU 1 (Plant Control) in system 1 =R11+SR11: Check LAN connection to Local HMI =X3+SE3.
31838 System 1: Communication fault system 2 =R11+SR11.B01 \nCPU 1 (Plant Control) in system 1 =R11+SR11: Check LAN connection to system 1.
35610 System 1: Communication fault 6MD =R11+SR11.B01 \nCPU 1 (Plant Control) in system 1
31857 System 1: Communication fault Profibus =R11+SR11.B01 \nCPU 1 (Plant Control) in system 1 =R11+SR11: Check fieldbus system.
35612 System 1: Communication initialization fault 6MD =R11+SR11.B01 \nCPU 1 (Plant Control) in system 1 =R11+SR11: Check SU200 interface units within =X2+SP2 and cooling system. Check parameter settings of SU200.
31866 System 1: Communication hardware alarm =R11+SR11.B21 / +SR-A10 \nLAN hardware components system 1 =R11+SR11: Check fieldbus controller CP50M0 in SIMATIC TDC rack.
31869 System 1: Master clock hardware fault +SP2-A50 / -A52 \nSiclock system =R11+SR11: Check Master Clock system.
31872 System 1: Time synchronization disturbed =R11+SR11.B \nTDC system 1 (OLC + PR) =R11+SR11: Check GPS system. Check antenna and cable connection to Master Clock.
31875 System 1: Digital fault recorder fault =X2+SP2-EH11 \nFault recorder =R11+SR11: Check TFR PC within =X2+SP2.
31878 System 1: Controller backup battery fault =R11+SR11.B \nTDC system 1 (OLC + PR) =R11+SR11: Replace battery of power supply unit of SIMATIC TDC rack (type MIGNON AA).
31881 System 1: Plant control fault =R11+SR11.B \nTDC system 1 (OLC + PR) =R11+SR11: Plant control system fault.
31884 System 1: Plant control active =R11+SR11-K5 \nChange over logic 1 =R11+SR11: Plant control
31887 System 1: Plant control passive =R11+SR11-K5 \nChange over logic 1 =R11+SR11: Plant control
31890 System 1: Plant control ready =R11+SR11.B \nTDC system 1 (OLC + PR) =R11+SR11: Plant control
31893 System 1: Plant control redundancy update fault =R11+SR11.B01 \nCPU 1 (Plant Control) in system 1 =R11+SR11: Update of parameter settings by Master has failed. Check HMI for further fault messages.
31914 System 1: LO6 / Opto 68 channel 1 fault =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Failure of optical sensor. Check indications on LO6M module +.B05 in SIMATIC TDC rack.
31917 System 1: LO6 / Opto 68 channel 2 fault =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Failure of optical sensor. Check indications on LO6M module +.B05 in SIMATIC TDC rack.
31920 System 1: LO6 / Opto 68 channel 3 fault =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Failure of optical sensor. Check indications on LO6M module +.B05 in SIMATIC TDC rack.
31923 System 1: LO6 / GTE channel 1 fault =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Failure of gap trigger electronic. Check indications on LO6M module +.B05 in SIMATIC TDC rack.
31926 System 1: LO6 / GTE channel 2 fault =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Failure of gap trigger electronic. Check indications on LO6M module +.B05 in SIMATIC TDC rack.
31929 System 1: LO6 / GTE channel 3 fault =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Failure of gap trigger electronic. Check indications on LO6M module +.B05 in SIMATIC TDC rack.
31968 System 1: LO6 / Opto68 channel 1 communication warning =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Single communication failures of telegram transfer between optical sensor and LO6M module +.B05.
31971 System 1: LO6 / Opto68 channel 1 laser current warning =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Laser current of optical power supply >1.4A. Check trendcurve on the HMI.
31974 System 1: LO6 / Opto68 channel 2 communication warning =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Single communication failures of telegram transfer between optical sensor and LO6M module +.B05.
31977 System 1: LO6 / Opto68 channel 2 laser current warning =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Laser current of optical power supply >1.4A. Check trendcurve on the HMI.
31980 System 1: LO6 / Opto68 channel 3 communication warning =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Single communication failures of telegram transfer between optical sensor and LO6M module +.B05.
31983 System 1: LO6 / Opto68 channel 3 laser current warning =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Laser current of optical power supply >1.4A. Check trendcurve on the HMI.
31998 System 1: LO6 / GTE channel 1 communication warning =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Single communication failures of telegram transfer between GTE55 and LO6M module +.B05.
32001 System 1: LO6 / GTE channel 1 laser current warning =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Laser current of optical power supply >1.5A. Check trendcurve on HMI.
32004 System 1: LO6 / GTE channel 1 self trigger =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Hardware fault. Module has triggered without command.
32007 System 1: LO6 / GTE channel 1 refused trigger =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Hardware fault. Module has triggered without command.
32010 System 1: LO6 / GTE channel 1 low trigger voltage =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Hardware fault. Module is not able to trigger the spark gap due to low trigger voltage.
32013 System 1: LO6 / GTE channel 2 communication warning =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Single communication failures of telegram transfer between GTE5 and LO6M module +.B05.
32016 System 1: LO6 / GTE channel 2 laser current warning =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Laser current of optical power supply >1.5A. Check trendcurve on HMI.
32019 System 1: LO6 / GTE channel 2 self trigger =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Hardware fault. Module has triggered without command.
32022 System 1: LO6 / GTE channel 2 refused trigger =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Hardware fault. Module has not triggered after command.
32025 System 1: LO6 / GTE channel 2 low trigger voltage =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Hardware fault. Module is not able to trigger the spark gap due to low trigger voltage.
32028 System 1: LO6 / GTE channel 3 communication warning =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Single communication failures of telegram transfer between GTE5 and LO6M module +.B05.
32031 System 1: LO6 / GTE channel 3 laser current warning =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Laser current of optical power supply >1.5A. Check trendcurve on HMI.
32034 System 1: LO6 / GTE channel 3 self trigger =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Hardware fault. Module has triggered without command.
32037 System 1: LO6 / GTE channel 3 refused trigger =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Hardware fault. Module has not triggered after command.
32040 System 1: LO6 / GTE channel 3 low trigger voltage =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Hardware fault. Module is not able to trigger the spark gap due to low trigger voltage.
32142 System 1: LO6A slot -B02 fault =R11+SR11.B02 \nLO6A #1 in system 1 =R11+SR11: Hardware fault.
32145 System 1: LO6A slot -B03 fault =R11+SR11.B03 \nLO6A #2 in system 1 =R11+SR11: Hardware fault.
32148 System 1: LO6A slot -B04 fault =R11+SR11.B04 \nLO6A #3 in system 1 =R11+SR11: Hardware fault.
32151 System 1: LO6A slot -B09 fault =R11+SR11.B09 \nLO6A #4 in system 1 =R11+SR11: Hardware fault.
32160 System 1: Protection parameter changed =R11+SR11.B \nTDC system 1 (OLC + PR) =R11+SR11: Parameter settings of protection have been changed.
32163 System 1: Protection parameter update from system 2 =R11+SR11.B01 \nCPU 1 (Plant Control) in system 1 =R11+SR11: Update of parameter settings of protection by Master (If system 2 is master only). Redundancy update.
32166 System 1: Protection parameter redundancy update fault =R11+SR11.B01 \nCPU 1 (Plant Control) in system 1 =R11+SR11: Update of parameter settings by Master has failed. Check HMI for further fault messages.
32169 System 1: Open command for bypass breaker 1 to protection =R11+SR11.B \nTDC system 1 (OLC + PR)
32174 System 1: Close command for bypass breaker 1 to protection =R11+SR11.B \nTDC system 1 (OLC + PR)
32179 System 1: Block command to protection =R11+SR11.B \nTDC system 1 (OLC + PR)
32184 System 1: Release command to protection =R11+SR11.B \nTDC system 1 (OLC + PR)
32189 System 1: Platform disconnected status to protection =R11+SR11.B \nTDC system 1 (OLC + PR)
31588 System 2: Controller system fault =R12+SR12.B \nTDC system 2 (OLC+PR) =R12+SR12: Check Simatic TDC.
31591 System 2: Controller power supply fault =R12+SR12.B \nTDC system 2 (OLC+PR) =R12+SR12: Check Simatic TDC.
31594 System 2: Controller fan fault =R12+SR12.B \nTDC system 2 (OLC+PR) =R12+SR12: Check Simatic TDC.
31597 System 2: Cubicle overtemperature =R12+SR12-S231 \nCubicle temperature system 2 =R12+SR12: Check venting (fans
35660 System 2: Monitor Lockout =R12+SR12.B03 \nLO6A #2 in system 2
31606 System 2: Lockout relais closed =R12+SR12-K21 / -K22 \nLockout relais 2 =R12+SR12: Status information of lockout relays (-K11
31603 System 1: Lockout relais closed =R11+SR11-K110 / -K120 \nLockout relais 1 =R12+SR12: Status information of lockout relays (-K11
31609 Operator command: Reset lockout =X2+SR1-S7 / +SR2-S7 \nReset lockout button
32213 System 2: Fast bypass =R12+SR12.B10 \nCPU 2 (Protection) in system 2
32218 System 2: External command: Open bypass breaker Customer \nLine Protection Interface
35647 System 2: External bypass phase R Customer \nLine Protection Interface =R12+SR12: Temporary bypass command from external device (Line protection).
35648 System 2: External bypass phase Y Customer \nLine Protection Interface =R12+SR12: Temporary bypass command from external device (Line protection).
35646 System 2: External bypass phase B Customer \nLine Protection Interface =R12+SR12: Temporary bypass command from external device (Line protection).
32254 System 2: MOV overtemperature =B0-F1 \nMOV protection functions =R12+SR12: MOV temperature >125°C due to line faults. Reinsertion released as soon as MOV temperature <65°C. No automatic reinsertion.
32257 System 2: MOV high current =B0-F1 \nMOV protection functions =R12+SR12: Excessive MOV current due to line faults. Fast automatic reinsertion follows.
32260 System 2: MOV temperature gradient high =B0-F1 \nMOV protection functions =R12+SR12: MOV temperature has increased rapidly due to line faults. Fast automatic reinsertion follows.
32263 System 2: MOV temperature gradient low =B0-F1 \nMOV protection functions =R12+SR12: MOV temperature has exceeded rating due to line faults. Automatic reinsertion follows after 60s.
35663 System 2: MOV fault branch -F1 phase R =B0-F1 \nMOV protection functions =R12+SR12: Defective MOV branch. Check TFR recordings. Check MOV installation.
35664 System 2: MOV fault branch -F1 phase Y =B0-F1 \nMOV protection functions =R12+SR12: Defective MOV branch. Check TFR recordings. Check MOV installation.
35662 System 2: MOV fault branch -F1 phase B =B0-F1 \nMOV protection functions =R12+SR12: Defective MOV branch. Check TFR recordings. Check MOV installation.
35666 System 2: MOV fault branch -F2 phase R =B0-F1 \nMOV protection functions =R12+SR12: Defective MOV branch. Check TFR recordings. Check MOV installation.
35667 System 2: MOV fault branch -F2 phase Y =B0-F1 \nMOV protection functions =R12+SR12: Defective MOV branch. Check TFR recordings. Check MOV installation.
35665 System 2: MOV fault branch -F2 phase B =B0-F1 \nMOV protection functions =R12+SR12: Defective MOV branch. Check TFR recordings. Check MOV installation.
32284 System 2: Gap refused trigger =B0-F51 \nGap protection functions =R12+SR12: No spark gap operation after trigger signal. Check TFR recording. Check spark gap assembly and trigger devices.
32287 System 2: Gap delayed trigger =B0-F51 \nGap protection functions =R12+SR12: Delayed spark gap operation after trigger signal. Check TFR recording. Check spark gap assembly and trigger devices.
32290 System 2: Gap prolonged conduction =B0-F51 \nGap protection functions =R12+SR12: Excessive spark gap operation. Check TFR recording. Check spark gap assembly and trigger devices. Check bypass and line breakers.
32293 System 2: Gap self trigger =B0-F51 \nGap protection functions =R12+SR12: Spark gap operation without trigger command from protection systems. Check TFR recording. Check spark gap assembly
32326 System 2: Bypass breaker failed to close BBR1-CD \nBypass breaker own segment =R12+SR12: BBR has failed to close after command. Check TFR recording. Check HMI for further fault indications of BBR. Check bypass breaker
32329 System 2: Bypass breaker failed to open BBR1-CD \nBypass breaker own segment =R12+SR12: BBR has failed to open after command. Check TFR recording. Check HMI for further fault indications of BBR. Check bypass breaker
35679 System 2: Bypass breaker aux. contact discordance BBR1-CD \nBypass breaker own segment =R12+SR12: Poles of BBR are in different or undefined position. Check TFR recording. Check HMI for further fault indications of BBR. Check bypass breaker and wiring.
35682 System 2: Bypass breaker Pole discordance BBR1-CD \nBypass breaker own segment
35650 System 2: Gap trigger phase R =B0-F51 \nGap protection functions =R12+SR12: Gap trigger command.
35651 System 2: Gap trigger phase Y =B0-F51 \nGap protection functions =R12+SR12: Gap trigger command.
35649 System 2: Gap trigger phase B =B0-F51 \nGap protection functions =R12+SR12: Gap trigger command.
32344 System 2: MOV temperature too high for reinsertion =B0-F1 \nMOV protection functions =R12+SR12: MOV temperature <65°C. Reinsertion blocked.
32347 System 2: MOV overload =B0-F1 \nMOV protection functions =R12+SR12: Group alarm of MOV protection. Check HMI for further fault messages. Check TFR recording.
32350 System 2: MOV unbalance =B0-F1 \nMOV protection functions =R12+SR12: MOV failure. Check TFR recordings. Check MOV installation.
32353 System 2: Platform protection =B0 \nPlatform =R12+SR12: Flash-over on platform assembly. Check TFR recordings. Check platform structure and installation.
32356 System 2: Gap protection =B0-F51 \nGap protection functions =R12+SR12: Group alarm of gap protection. Check HMI for further fault messages. Check TFR recordings.
32362 System 2: Capacitor unbalance alarm =B0-C3x \nCapacitor protection functions =R12+SR12: Single cap. fuses are blown / single cap. elements are shorted. Observe capacitor. Check capacitor at next maintenance. Measure capacity of capacitor units
32365 System 2: Capacitor unbalance bypass =B0-C3x \nCapacitor protection functions =R12+SR12: Critical number of cap. fuses are blown / cap. elements are shorted. Check TFR recording. Check capacitor. Measure capacity of capacitor units
32368 System 2: Capacitor overload =B0-C3x \nCapacitor protection functions =R12+SR12: Capacitor current / voltage above rating. Check transmission system. Check impedance setting (TCSC only). Insert manually after the overload situation has cleared.
32374 System 2: Bypass breaker fail BBR1-CD \nBypass breaker own segment =R12+SR12: Group alarm of BBR supervision. Check HMI for further fault messages. Check TFR recording. Check BBR.
35669 System 2: Phase indication: Phase R =R12+SR12.B \nTDC system 2 (OLC+PR) =R12+SR12: Indication of affected phase. Check for further fault messages.
35670 System 2: Phase indication: Phase Y =R12+SR12.B \nTDC system 2 (OLC+PR) =R12+SR12: Indication of affected phase. Check for further fault messages.
35668 System 2: Phase indication: Phase B =R12+SR12.B \nTDC system 2 (OLC+PR) =R12+SR12: Indication of affected phase. Check for further fault messages.
32389 System 2: Protection blocked =R12+SR12.B \nTDC system 2 (OLC+PR) =R12+SR12: Protection system not active. Check for further fault messages. Check parameter settings.
32392 System 2: Reset lockout =R12+SR12-K21 / -K22 \nLockout relais 2 =R12+SR12: Reset command to lockout relays -K11
32395 System 2: Permanent bypass BBR1-CD \nBypass breaker own segment =R12+SR12: Permanent closing of BBR. Check HMI for further fault messages. Check TFR recording. Reinsertion is blocked and requires reset of relay -K11.
35673 System 2: Temporary bypass phase R BBR1-CD \nBypass breaker own segment =R12+SR12: Temporary closing of BBR. Check HMI for further fault messages. Reinsertion released
35674 System 2: Temporary bypass phase Y BBR1-CD \nBypass breaker own segment =R12+SR12: Temporary closing of BBR. Check HMI for further fault messages. Reinsertion released
35672 System 2: Temporary bypass phase B BBR1-CD \nBypass breaker own segment =R12+SR12: Temporary closing of BBR. Check HMI for further fault messages. Reinsertion released
32407 System 2: Reinsertion BBR1-CD \nBypass breaker own segment =R12+SR12: Opening command to BBR.
32410 System 2: Line trip =R12+SR12.B10 \nCPU 2 (Protection) in system 2 =R12+SR12: Trip command to line protection. Check HMI for further fault messages. Check TFR recording. Check BBR and cooling system. Bypassing of bank via MBS is released after line is de-energized and capacitors are discharged (10min).
35641 System 2: Communication fault 6MD =X2+SP2-A1 \nSU200 #1 (Binary interface) =R12+SR12: Check fieldbus system and SU200 interface units within =X2+SP2.
32430 System 2: Communication fault local HMI =R12+SR12.B01 \nCPU 1 (Plant Control) in system 2 =R12+SR12: Check LAN connection to Local HMI =X3+SE3.
32439 System 2: Communication fault system 1 =R12+SR12.B01 \nCPU 1 (Plant Control) in system 2 =R12+SR12: Check LAN connection to system 2.
32458 System 2: Communication fault Profibus =R12+SR12.B01 \nCPU 1 (Plant Control) in system 2 =R12+SR12: Check fieldbus system.
35643 System 2: Communication initialization fault 6MD =R12+SR12.B01 \nCPU 1 (Plant Control) in system 2 =R12+SR12: Check SU200 interface units within =X2+SP2 and cooling system. Check parameter settings of SU200.
32467 System 2: Communication hardware alarm =R12+SR12.B21 / +SR-A20 \nLAN hardware components system 2 =R12+SR12: Check fieldbus controller CP50M0 in SIMATIC TDC rack.
32470 System 2: Master clock hardware fault +SP2-A50 / -A52 \nSiclock system =R12+SR12: Check Master Clock system.
32473 System 2: Time synchronization disturbed =R12+SR12.B \nTDC system 2 (OLC+PR) =R12+SR12: Check GPS system. Check antenna and cable connection to Master Clock.
32476 System 2: Digital fault recorder fault =X2+SP2-EH11 \nFault recorder =R12+SR12: Check TFR PC within =X2+SP2.
32479 System 2: Controller backup battery fault =R12+SR12.B \nTDC system 2 (OLC+PR) =R12+SR12: Replace battery of power supply unit of SIMATIC TDC rack (type MIGNON AA).
32482 System 2: Plant control fault =R12+SR12.B \nTDC system 2 (OLC+PR) =R12+SR12: Plant control system fault.
32485 System 2: Plant control active =R12+SR12-K5 \nChange over logic 2 =R12+SR12: Plant control
32488 System 2: Plant control passive =R12+SR12-K5 \nChange over logic 2 =R12+SR12: Plant control
32491 System 2: Plant control ready =R12+SR12.B \nTDC system 2 (OLC+PR) =R12+SR12: Plant control
32494 System 2: Plant control redundancy update fault =R12+SR12-K21 / -K22 \nLockout relais 2 =R12+SR12: Update of parameter settings by Master has failed. Check HMI for further fault messages.
32515 System 2: LO6 / Opto 68 channel 1 fault =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Failure of optical sensor. Check indications on LO6M module +.B05 in SIMATIC TDC rack.
32518 System 2: LO6 / Opto 68 channel 2 fault =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Failure of optical sensor. Check indications on LO6M module +.B05 in SIMATIC TDC rack.
32521 System 2: LO6 / Opto 68 channel 3 fault =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Failure of optical sensor. Check indications on LO6M module +.B05 in SIMATIC TDC rack.
32524 System 2: LO6 / GTE channel 1 fault =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Failure of gap trigger electronic. Check indications on LO6M module +.B05 in SIMATIC TDC rack.
32527 System 2: LO6 / GTE channel 2 fault =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Failure of gap trigger electronic. Check indications on LO6M module +.B05 in SIMATIC TDC rack.
32530 System 2: LO6 / GTE channel 3 fault =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Failure of gap trigger electronic. Check indications on LO6M module +.B05 in SIMATIC TDC rack.
32569 System 2: LO6 / Opto68 channel 1 communication warning =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Single communication failures of telegram transfer between optical sensor and LO6M module +.B05.
32572 System 2: LO6 / Opto68 channel 1 laser current warning =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Laser current of optical power supply >1.4A. Check trendcurve on the HMI.
32575 System 2: LO6 / Opto68 channel 2 communication warning =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Single communication failures of telegram transfer between optical sensor and LO6M module +.B05.
32578 System 2: LO6 / Opto68 channel 2 laser current warning =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Laser current of optical power supply >1.4A. Check trendcurve on the HMI.
32581 System 2: LO6 / Opto68 channel 3 communication warning =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Single communication failures of telegram transfer between optical sensor and LO6M module +.B05.
32584 System 2: LO6 / Opto68 channel 3 laser current warning =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Laser current of optical power supply >1.4A. Check trendcurve on the HMI.
35652 System 2: GTE phase L1 low external power supply =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2
35653 System 2: GTE phase L2 low external power supply =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2
35654 System 2: GTE phase L3 low external power supply =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2
32605 System 2: LO6 / GTE channel 1 laser current warning =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Laser current of optical power supply >1.5A. Check trendcurve on HMI.
32608 System 2: LO6 / GTE channel 1 self trigger =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Hardware fault. Module has triggered without command.
32611 System 2: LO6 / GTE channel 1 refused trigger =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Hardware fault. Module has not triggered after command.
32614 System 2: LO6 / GTE channel 1 low trigger voltage =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Hardware fault. Module is not able to trigger the spark gap due to low trigger voltage.
32617 System 2: LO6 / GTE channel 2 communication warning =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Single communication failures of telegram transfer between GTE5 and LO6M module +.B05.
32620 System 2: LO6 / GTE channel 2 laser current warning =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Laser current of optical power supply >1.5A. Check trendcurve on HMI.
32623 System 2: LO6 / GTE channel 2 self trigger =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Hardware fault. Module has triggered without command.
32626 System 2: LO6 / GTE channel 2 refused trigger =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Hardware fault. Module has not triggered after command.
32629 System 2: LO6 / GTE channel 2 low trigger voltage =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Hardware fault. Module is not able to trigger the spark gap due to low trigger voltage.
32632 System 2: LO6 / GTE channel 3 communication warning =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Single communication failures of telegram transfer between GTE5 and LO6M module +.B05.
32635 System 2: LO6 / GTE channel 3 laser current warning =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Laser current of optical power supply >1.5A. Check trendcurve on HMI.
32638 System 2: LO6 / GTE channel 3 self trigger =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Hardware fault. Module has triggered without command.
32641 System 2: LO6 / GTE channel 3 refused trigger =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Hardware fault. Module has not triggered after command.
32644 System 2: LO6 / GTE channel 3 low trigger voltage =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Hardware fault. Module is not able to trigger the spark gap due to low trigger voltage.
32749 System 2: LO6A slot -B02 fault =R12+SR12.B02 \nLO6A #1 in system 2 =R12+SR12: Hardware fault.
32752 System 2: LO6A slot -B03 fault =R12+SR12.B03 \nLO6A #2 in system 2 =R12+SR12: Hardware fault.
32755 System 2: LO6A slot -B04 fault =R12+SR12.B04 \nLO6A #3 in system 2 =R12+SR12: Hardware fault.
32758 System 2: LO6A slot -B09 fault =R12+SR12.B09 \nLO6A #4 in system 2 =R12+SR12: Hardware fault.
32767 System 2: Protection parameter changed =R12+SR12.B \nTDC system 2 (OLC+PR) =R12+SR12: Parameter settings of protection have been changed.
32770 System 2: Protection parameter update from system 1 =R12+SR12.B01 \nCPU 1 (Plant Control) in system 2 =R12+SR12: Update of parameter settings of protection by Master (If system 2 is master only). Redundancy update.
32773 System 2: Protection parameter redundancy update fault =R12+SR12.B01 \nCPU 1 (Plant Control) in system 2 =R12+SR12: Update of parameter settings by Master has failed. Check HMI for further fault messages.
32776 System 2: Open command for bypass breaker 1 to protection =R12+SR12.B \nTDC system 2 (OLC+PR)
32781 System 2: Close command for bypass breaker 1 to protection =R12+SR12.B10 \nCPU 2 (Protection) in system 2
32786 System 2: Block command to protection =R12+SR12.B01 \nCPU 1 (Plant Control) in system 2
32791 System 2: Release command to protection =R12+SR12.B \nTDC system 2 (OLC+PR)
32796 System 2: Platform disconnected status to protection =R12+SR12.B01 \nCPU 1 (Plant Control) in system 2
35461 Protection 1: Platform fault protection on =B0 \nPlatform
35456 Protection 1: Gap self trigger on =B0-F51 \nGap protection functions
35455 Protection 1: Gap prolonged conduction on =B0-F51 \nGap protection functions
35454 Protection 1: Gap delayed/refused trigger on =B0-F51 \nGap protection functions
35457 Protection 1: MOV high current on =B0-F1 \nMOV protection functions
35460 Protection 1: MOV temperature overload on =B0-F1 \nMOV protection functions
35458 Protection 1: MOV temperature gradient - high set on =B0-F1 \nMOV protection functions
35459 Protection 1: MOV temperature gradient - low set on =B0-F1 \nMOV protection functions
35603 Protection 1: MOV unbalance protection on =R11+SR11.B10 \nCPU 2 (Protection) in system 1
35462 Protection 1: Prevent reinsertion on =R11+SR11.B10 \nCPU 2 (Protection) in system 1
35451 Protection 1: Capacitor unbalance alarm on =B0-C3x \nCapacitor protection functions
35453 Protection 1: Capacitor unbalance bypass - low set on =R11+SR11.B10 \nCPU 2 (Protection) in system 1
35452 Protection 1: Capacitor unbalance bypass - high set on =B0-C3x \nCapacitor protection functions
35602 Protection 1: Capacitor unbalance counter on =R11+SR11.B10 \nCPU 2 (Protection) in system 1
35450 Protection 1: Capacitor overload protection on =B0-C3x \nCapacitor protection functions
35448 Protection 1: Bypass breaker fail protection on BBR1-CD \nBypass breaker 1
35449 Protection 1: Bypass breaker pole discordance on BBR1-CD \nBypass breaker 1
35447 Protection 1: Bypass breaker aux. contact discordance on BBR1-CD \nBypass breaker 1
35463 Protection 1: Single phase operation on =R11+SR11.B10 \nCPU 2 (Protection) in system 1
35446 Protection 1: Auto-reinsertion on =R11+SR11.B10 \nCPU 2 (Protection) in system 1
32870 System 1: DSP lifecounter fault =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Hardware fault of LO6plusA unit on slots +.B05-09 within SIMATIC TDC rack. Check fault indications on modules.
32873 System 1: DSP parameter fault =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Hardware fault of LO6plusA unit on slots +.B05-09 within SIMATIC TDC rack. Check fault indications on modules.
32876 System 1: CPU fault =R11+SR11.B10 \nCPU 2 (Protection) in system 1 =R11+SR11: Hardware fault of protection processing unit. Check fault indications on +.B10 within SIMATIC TDC rack.
32870 System 1: DSP lifecounter fault =R11+SR11.B14 / B15 \nLO6 #1 and LO6A#4 in system 1 =R11+SR11: Hardware fault of LO6plusA unit on slots +.B11-15 within SIMATIC TDC rack. Check fault indications on modules.
32873 System 1: DSP parameter fault =R11+SR11.B14 / B15 \nLO6 #1 and LO6A#4 in system 1 =R11+SR11: Hardware fault of LO6plusA unit on slots +.B11-15 within SIMATIC TDC rack. Check fault indications on modules.
35479 Protection 2: Platform fault protection on =B0 \nPlatform
35474 Protection 2: Gap self trigger on =B0-F51 \nGap protection functions
35473 Protection 2: Gap prolonged conduction on =B0-F51 \nGap protection functions
35472 Protection 2: Gap delayed/refused trigger on =B0-F51 \nGap protection functions
35475 Protection 2: MOV high current on =B0-F1 \nMOV protection functions
35478 Protection 2: MOV temperature overload on =B0-F1 \nMOV protection functions
35476 Protection 2: MOV temperature gradient - high set on =B0-F1 \nMOV protection functions
35477 Protection 2: MOV temperature gradient - low set on =B0-F1 \nMOV protection functions
35606 Protection 2: MOV unbalance protection on =R12+SR12.B10 \nCPU 2 (Protection) in system 2
35480 Protection 2: Prevent reinsertion on =R12+SR12.B10 \nCPU 2 (Protection) in system 2
35469 Protection 2: Capacitor unbalance alarm on =B0-C3x \nCapacitor protection functions
35471 Protection 2: Capacitor unbalance bypass - low set on =R12+SR12.B10 \nCPU 2 (Protection) in system 2
35470 Protection 2: Capacitor unbalance bypass - high set on =B0-C3x \nCapacitor protection functions
35605 Protection 2: Capacitor unbalance counter on =R12+SR12.B10 \nCPU 2 (Protection) in system 2
35468 Protection 2: Capacitor overload protection on =B0-C3x \nCapacitor protection functions
35466 Protection 2: Bypass breaker fail protection on BBR1-CD \nBypass breaker 1
35467 Protection 2: Bypass breaker pole discordance on BBR1-CD \nBypass breaker 1
35465 Protection 2: Bypass breaker aux. contact discordance on BBR1-CD \nBypass breaker 1
35481 Protection 2: Single phase operation on =R12+SR12.B10 \nCPU 2 (Protection) in system 2
35464 Protection 2: Auto-reinsertion on =R12+SR12.B10 \nCPU 2 (Protection) in system 2
32954 System 2: DSP lifecounter fault =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Hardware fault of LO6plusA unit on slots +.B05-09 within SIMATIC TDC rack. Check fault indications on modules.
32957 System 2: DSP parameter fault =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Hardware fault of LO6plusA unit on slots +.B05-09 within SIMATIC TDC rack. Check fault indications on modules.
32960 System 2: CPU fault =R12+SR12.B10 \nCPU 2 (Protection) in system 2 =R12+SR12: Hardware fault of protection processing unit. Check fault indications on +.B10 within SIMATIC TDC rack.
32954 System 2: DSP lifecounter fault =R12+SR12.B14 / B15 \nLO6 #1 and LO6A#4 in system 2 =R12+SR12: Hardware fault of LO6plusA unit on slots +.B11-15 within SIMATIC TDC rack. Check fault indications on modules.
32957 System 2: DSP parameter fault =R12+SR12.B14 / B15 \nLO6 #1 and LO6A#4 in system 2 =R12+SR12: Hardware fault of LO6plusA unit on slots +.B11-15 within SIMATIC TDC rack. Check fault indications on modules.
35558 6MD #01: Status start-up (S-141) =X2+SP2-A1 \nSU200 #1 (Binary interface) =X2+SP2: SU200 interface unit: Starting up.
35552 6MD #01: Disturbed device (S-142) =X2+SP2-A1 \nSU200 #1 (Binary interface) =X2+SP2: SU200 interface unit: No time synchronization or loss of one power supply. Check fault indications on SU200.
35555 6MD #01: Status device disturbance cleared (S-143) =X2+SP2-A1 \nSU200 #1 (Binary interface) =X2+SP2: SU200 interface unit: Status information.
35553 6MD #01: Faulty device (S-144) =X2+SP2-A1 \nSU200 #1 (Binary interface) =X2+SP2: SU200 interface unit: Check fault indications on SU200.
35554 6MD #01: Faulty output (S-145) =X2+SP2-A1 \nSU200 #1 (Binary interface) =X2+SP2: SU200 interface unit: Check fault indications on SU200.
35556 6MD #01: Status local control mode (S-146) =X2+SP2-A1 \nSU200 #1 (Binary interface) =X2+SP2: SU200 interface unit: Unit is operated by service tool.
35557 6MD #01: Status remote control mode (S-147) =X2+SP2-A1 \nSU200 #1 (Binary interface) =X2+SP2: SU200 interface unit: Normal mode of operation.
FSC SIGNAL LIST OF MEERUT SUBSTATION (FOR ONE FSC)
Sr. No. WinCC Signal Number Signal Description Signal Source Signal Information/Remarks
1 2000010 Control system 1 hardware alarm =R11+SR11.B01 \nCPU 1 (Plant Control) in system 1
2 2000011 Protection system 1 hardware alarm =R11+SR11.B10 \nCPU 2 (Protection) in system 1
3 2000012 Control & Protection system 1 communication fault =R11+SR11.B \nTDC system 1 (OLC + PR)
4 2000014 Protection system 1 measuring system warning =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1
5 2000020 Control system 2 hardware alarm =R12+SR12.B01 \nCPU 1 (Plant Control) in system 2
6 2000021 Protection system 2 hardware alarm =R12+SR12.B10 \nCPU 2 (Protection) in system 2
7 2000022 Control & Protection system 2 communication fault =R12+SR12.B \nTDC system 2 (OLC+PR)
8 2000024 Protection system 2 measuring system warning =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2
9 2000030 Control & Protection system power supply alarm AC- or DC-MCB tripped
10 2000040 Control & Protection system redundancy disturbed Changeover blocked
11 2000050 Bank ground switch 1 alarm ES1-CD \nBank ground switch 1
12 2000051 Bank ground switch 2 alarm ES2-CD \nBank ground switch 2
13 2000052 Disconnect switch 1 alarm DS1-CD \nBank disconnect switch 1
14 2000053 Disconnect switch 2 alarm DS2-CD \nBank disconnect switch 2
15 2000054 Main bypass switch alarm MBS-CD \nMain bypass switch
16 2000201 Bypass breaker 1: Feedback closed phase R BBR1-CD \nBypass breaker 1 BBR: Pole -L1 closed. (=X2+SP2-A1 /6MD01BI1)
17 2000202 Bypass breaker 1: Feedback open phase R BBR1-CD \nBypass breaker 1 BBR: Pole -L1 open. (=X2+SP2-A1 /6MD01BI2)
18 2000203 Bypass breaker 1: Feedback closed phase Y BBR1-CD \nBypass breaker 1 BBR: Pole -L2 closed. (=X2+SP2-A1 /6MD01BI3)
19 2000204 Bypass breaker 1: Feedback open phase Y BBR1-CD \nBypass breaker 1 BBR: Pole -L2 open. (=X2+SP2-A1 /6MD01BI4)
20 2000205 Bypass breaker 1: Feedback closed phase B BBR1-CD \nBypass breaker 1 BBR: Pole -L3 closed. (=X2+SP2-A1 /6MD01BI5)
21 2000206 Bypass breaker 1: Feedback open phase B BBR1-CD \nBypass breaker 1 BBR: Pole -L3 open. (=X2+SP2-A1 /6MD01BI6)
22 2000207 Disconnect switch 1: Feedback closed DS1-CD \nBank disconnect switch 1 DS1: Pole -L1 closed. (=X2+SP2-A1 /6MD01BI7)
23 2000208 Disconnect switch 1: Feedback open DS1-CD \nBank disconnect switch 1 DS1: Pole -L1 open. (=X2+SP2-A1 /6MD01BI8)
24 2000209 Disconnect switch 2: Feedback closed DS2-CD \nBank disconnect switch 2 DS2: Pole -L1 closed. (=X2+SP2-A1 /6MD01BI9)
25 2000210 Disconnect switch 2: Feedback open DS2-CD \nBank disconnect switch 2 DS2: Pole -L1 open. (=X2+SP2-A1 /6MD01BI10)
26 2000211 Main bypass switch: Feedback closed MBS-CD \nMain bypass switch MBS: Pole -L1 closed. (=X2+SP2-A1 /6MD01BI11)
27 2000212 Main bypass switch: Feedback open MBS-CD \nMain bypass switch MBS: Pole -L1 open. (=X2+SP2-A1 /6MD01BI12)
28 2000213 Bank ground switch 1: Feedback closed ES1-CD \nBank ground switch 1 ES1: Pole -L1 close. (=X2+SP2-A1 /6MD01BI13)
29 2000214 Bank ground switch 1: Feedback open ES1-CD \nBank ground switch 1 ES1: Pole -L1 open. (=X2+SP2-A1 /6MD01BI14)
30 2000215 Bank ground switch 2: Feedback closed ES2-CD \nBank ground switch 2 ES2: Pole -L1 closed. (=X2+SP2-A1 /6MD01BI15)
31 2000216 Bank ground switch 2: Feedback open ES2-CD \nBank ground switch 2 ES2: Pole -L1 open. (=X2+SP2-A1 /6MD01BI16)
32 2000223 Bypass breaker 1: Status remote operation BBR1-CD \nBypass breaker 1 BBR: Operation via operator station enabled. (=X2+SP2-A1 /6MD01BI21)
33 2000224 Bypass breaker 1: Alarm low oil pressure - opening lockout BBR1-CD \nBypass breaker 1 BBR: Low oil pressure. Opening is locked. (=X2+SP2-A1 /6MD01BI22)
34 2000225 Bypass breaker 1: Bypass Breaker Auto Reopening Interlocking-1 BBR1-CD \nBypass breaker 1 BBR: Hydraulic system alarm (=X2+SP2-A1 /6MD01BI23)
35 2000226 Bypass breaker 1: Bypass Breaker Auto Reopening Interlocking-2 BBR1-CD \nBypass breaker 1 BBR: Low oil Pressure. Opening is locked (=X2+SP2-A1 /6MD01BI24)
36 2000227 Bypass breaker 1: Bypass Breaker Opening Spring Discharge BBR1-CD \nBypass breaker 1 BBR: Low oil pressure. Operation is locked. (=X2+SP2-A1 /6MD01BI25)
37 2000228 Bypass breaker 1: Bypass Breaker External Sequence Closing BBR1-CD \nBypass breaker 1 BBR: Low N2 pressure(=X2+SP2-A1 /6MD01BI26)
38 2000229 Bypass breaker 1: Bypass Breaker Mechanism Tripping Lockout BBR1-CD \nBypass breaker 1 BBR: Low N2 pressure for more than 3 h. Operation is locked (=X2+SP2-A1 /6MD01BI27)
39 2000230 Bypass breaker 1: Alarm low SF6 pressure BBR1-CD \nBypass breaker 1 BBR: Low SF6 pressure Alarm (=X2+SP2-A1 /6MD01BI28)
40 2000231 Bypass breaker 1: Lockout low SF6 pressure BBR1-CD \nBypass breaker 1 BBR: Lockout on Low SF6 pressure. (=X2+SP2-A1 /6MD01BI29)
41 2000232 Bypass breaker 1: General lockout BBR1-CD \nBypass breaker 1 BBR: Group alarm. Loss of N2 / oil / SF6. Check messages for further information.(=X2+SP2-A1 /6MD01BI30)
42 2000233 Bypass breaker 1: Pole discrepancy lockout BBR1-CD \nBypass breaker 1 BBR: Bypass Breaker Lockout on Pole discrepancy. (=X2+SP2-A1 /6MD01BI31)
43 2000234 Bypass breaker 1: Motor MCB tripped BBR1-CD \nBypass breaker 1 BBR: MCB trip. Check wiring and pumps. (=X2+SP2-A1 /6MD01BI32)
44 2000237 Disconnect switch 1: Status remote operation DS1-CD \nBank disconnect switch 1 DS1: Operation via operator station enabled. (=X2+SP2-A1 /6MD01BI35)
45 2000238 Disconnect switch 1: Fault DS1-CD \nBank disconnect switch 1 DS1: Motor MCB overload trip. Check wiring and motors. (=X2+SP2-A1 /6MD01BI36)
46 2000241 Disconnect switch 2: Status remote operation DS2-CD \nBank disconnect switch 2 DS2: Operation via operator station enabled. (=X2+SP2-A1 /6MD01BI39)
47 2000242 Disconnect switch 2: Fault DS2-CD \nBank disconnect switch 2 DS2: Motor MCB overload trip. Check wiring and motors. (=X2+SP2-A1 /6MD01BI40)
48 2000245 Main bypass switch: Status remote operation MBS-CD \nMain bypass switch MBS: Operation via operator station enabled. (=X2+SP2-A2 /6MD01BI43)
49 2000246 Main bypass switch: Fault MBS-CD \nMain bypass switch MBS: Motor MCB overload trip. Check wiring and motors. (=X2+SP2-A2 /6MD01BI44)
50 2000249 Bank ground switch 1: Status remote operation ES1-CD \nBank ground switch 1 ES1: Operation via operator station enabled. (=X2+SP2-A2 /6MD01BI47)
51 2000250 Bank ground switch 1: Fault ES1-CD \nBank ground switch 1 ES1: Motor MCB overload trip. Check wiring and motors. (=X2+SP2-A2 /6MD01BI48)
52 2000253 Bank ground switch 2: Status remote operation ES2-CD \nBank ground switch 2 ES2: Operation via operator station enabled. (=X2+SP2-A2 /6MD01BI51)
53 2000254 Bank ground switch 2: Fault ES2-CD \nBank ground switch 2 ES2: Motor MCB overload trip. Check wiring and motors. (=X2+SP2-A2 /6MD01BI52)
54 2000255 Bank ground switch 2: Fault 2 ES2-CD \nBank ground switch 2 ES2: Motor MCB overload trip. Check wiring and motors. (=X2+SP2-A2 /6MD01BI53)
55 2000256 Bank ground switch 2: Fault 3 ES2-CD \nBank ground switch 2 ES2: Motor MCB overload trip. Check wiring and motors. (=X2+SP2-A2 /6MD01BI54)
56 2000257 Line side 1: Deenergized Customer \nLine Protection Interface Transmission line on side 1 (side of DS1): De-energized. (=X2+SP2-A2 /6MD01BI55)
57 2000258 Line side 2: Deenergized Customer \nLine Protection Interface Transmission line on side 2 (side of DS2): De-energized. (=X2+SP2-A2 /6MD01BI56)
58 2000263 Plant control: Gate closed Ladder: Down / Gate: Closed / Kirk Key: Locked. (=X2+SP2-A2 /6MD01BI61)
59 2000264 Plant interface: Field wetting power supply fault =X3+SE3-F311 \nField wetting DC feeder 220V =X3+SE3: MCB -F311 trip. Check wiring into the yard. (=X2+SP2-A2 /6MD01BI62)
60 2001002 6MD01: DQ 2 not used DS1-CD \nBank disconnect switch 1 (=X2+SP2-A1 / 6MD01DQ2)
61 2001003 6MD01: DQ 3 not used DS1-CD \nBank disconnect switch 1 (=X2+SP2-A1 / 6MD01DQ3)
62 2001004 6MD01: DQ 4 not used DS1-CD \nBank disconnect switch 1 (=X2+SP2-A1 / 6MD01DQ4)
63 2001005 6MD01: DQ 5 not used DS1-CD \nBank disconnect switch 1 (=X2+SP2-A1 / 6MD01DQ5)
64 2001006 6MD01: DQ 6 not used DS1-CD \nBank disconnect switch 1 (=X2+SP2-A1 / 6MD01DQ6)
65 2001007 6MD01: DQ 7 not used DS1-CD \nBank disconnect switch 1 (=X2+SP2-A1 / 6MD01DQ7)
66 2001008 6MD01: DQ 8 not used DS1-CD \nBank disconnect switch 1 (=X2+SP2-A1 / 6MD01DQ8)
67 2001009 6MD01: DQ 9 not used DS1-CD \nBank disconnect switch 1 (=X2+SP2-A1 / 6MD01DQ9)
68 2001010 6MD01: DQ 10 not used DS2-CD \nBank disconnect switch 2 (=X2+SP2-A1 / 6MD01DQ10)
69 2001011 6MD01: DQ 11 not used DS2-CD \nBank disconnect switch 2 (=X2+SP2-A1 / 6MD01DQ11)
70 2001012 6MD01: DQ 12 not used DS2-CD \nBank disconnect switch 2 (=X2+SP2-A1 / 6MD01DQ12)
71 2001013 6MD01: DQ 13 not used DS2-CD \nBank disconnect switch 2 (=X2+SP2-A1 / 6MD01DQ13)
72 2001014 6MD01: DQ 14 not used DS2-CD \nBank disconnect switch 2 (=X2+SP2-A1 / 6MD01DQ14)
73 2001015 6MD01: DQ 15 not used DS2-CD \nBank disconnect switch 2 (=X2+SP2-A1 / 6MD01DQ15)
74 2001016 6MD01: DQ 16 not used DS2-CD \nBank disconnect switch 2 (=X2+SP2-A1 / 6MD01DQ16)
75 2001017 6MD01: DQ 17 not used DS2-CD \nBank disconnect switch 2 (=X2+SP2-A1 / 6MD01DQ17)
76 2001018 6MD01: DQ 18 not used DS2-CD \nBank disconnect switch 2 (=X2+SP2-A1 / 6MD01DQ18)
77 2001023 Plant control: Open command to disconnect switch 1 DS1-CD \nBank disconnect switch 1 (=X2+SP2-A1 / 6MD01BO23)
78 2001024 Plant control: Close command to disconnect switch 1 DS1-CD \nBank disconnect switch 1 (=X2+SP2-A1 / 6MD01BO24)
79 2001025 Plant control: Enable to disconnect switch 1 DS1-CD \nBank disconnect switch 1 (=X2+SP2-A1 / 6MD01BO25)
80 2001026 Plant control: Open command to disconnect switch 2 DS2-CD \nBank disconnect switch 2 (=X2+SP2-A1 / 6MD01BO26)
81 2001027 Plant control: Close command to disconnect switch 2 DS2-CD \nBank disconnect switch 2 (=X2+SP2-A1 / 6MD01BO27)
82 2001028 Plant control: Enable to disconnect switch 2 DS2-CD \nBank disconnect switch 2 (=X2+SP2-A1 / 6MD01BO28)
83 2001029 Plant control: Open command to main bypass switch MBS-CD \nMain bypass switch (=X2+SP2-A1 / 6MD01BO29)
84 2001030 Plant control: Close command to main bypass switch MBS-CD \nMain bypass switch (=X2+SP2-A1 / 6MD01BO30)
85 2001031 Plant control: Enable to main bypass switch MBS-CD \nMain bypass switch (=X2+SP2-A1 / 6MD01BO31)
86 2001034 Plant control: Enable to bank ground switch 1 ES1-CD \nBank ground switch 1 (=X2+SP2-A1 / 6MD01BO34)
87 2001037 Plant control: Enable to bank ground switch 2 ES2-CD \nBank ground switch 2 (=X2+SP2-A1 / 6MD01BO37)
88 2001041 Plant control: Opening of gate enabled Kirk key: Released. (=X2+SP2-A1 / 6MD01BO41)
89 2001086 Plant control: Opening of gate enabled Kirk key: Released. (=X2+SP2-A3 / SU3BO22)
90 2001321 Operator command: Select HMI local control OS \nAny operator station (used for commands)
91 2001335 Operator command: Start general scan OS \nAny operator station (used for commands)
92 2001337 Operator command: Close bank ground switch 1 OS \nAny operator station (used for commands)
93 2001338 Operator command: Open bank ground switch 1 OS \nAny operator station (used for commands)
94 2001339 Operator command: Close bank ground switch 2 OS \nAny operator station (used for commands)
95 2001340 Operator command: Open bank ground switch 2 OS \nAny operator station (used for commands)
96 2001341 Operator command: Close disconnect switch 1 OS \nAny operator station (used for commands)
97 2001342 Operator command: Open disconnect switch 1 OS \nAny operator station (used for commands)
98 2001343 Operator command: Close disconnect switch 2 OS \nAny operator station (used for commands)
99 2001344 Operator command: Open disconnect switch 2 OS \nAny operator station (used for commands)
100 2001345 Operator command: Close main bypass switch OS \nAny operator station (used for commands)
101 2001346 Operator command: Open main bypass switch OS \nAny operator station (used for commands)
102 2001347 Operator command: Close line ground switch 1 OS \nAny operator station (used for commands)
103 2001349 Operator command: Close line ground switch 2 OS \nAny operator station (used for commands)
104 2001351 Operator command: Close bypass breaker 1 OS \nAny operator station (used for commands)
105 2001352 Operator command: Open bypass breaker 1 OS \nAny operator station (used for commands)
106 2001369 Operator command: Select emergency mode OS \nAny operator station (used for commands)
107 2001370 Operator command: Select normal mode OS \nAny operator station (used for commands)
108 2001377 Operator command: Select System 1 as active System OS \nAny operator station (used for commands)
109 2001378 Operator command: Select System 2 as active System OS \nAny operator station (used for commands)
110 2001385 Operator command: Start sequence to "Disconnected" OS \nAny operator station (used for commands)
111 2001386 Operator command: Start sequence to "Bypassed" OS \nAny operator station (used for commands)
112 2001387 Operator command: Start sequence to "Inserted" (Seg1) OS \nAny operator station (used for commands) =B0: Requested status of platform: Segment 1 inserted
113 2001400 Operator command: Sequence stop OS \nAny operator station (used for commands)
114 2001401 Operator command: Reset protection lockout OS \nAny operator station (used for commands)
115 2001403 Operator command: Measured values source system 1 OS \nAny operator station (used for commands)
116 2001404 Operator command: Measured values source system 2 OS \nAny operator station (used for commands)
117 2001405 Operator command: Block protection 1 OS \nAny operator station (used for commands)
118 2001406 Operator command: Unblock protection 1 OS \nAny operator station (used for commands)
119 2001407 Operator command: Block protection 2 OS \nAny operator station (used for commands)
120 2001408 Operator command: Unblock protection 2 OS \nAny operator station (used for commands)
121 2001409 Operator command: Auto-reinsertion on OS \nAny operator station (used for commands)
122 2001410 Operator command: Auto-reinsertion off OS \nAny operator station (used for commands)
123 2001411 Operator command: Single-phase operation OS \nAny operator station (used for commands)
124 2001412 Operator command: Three-phase operation OS \nAny operator station (used for commands)
125 2001561 Operator command: Protection parameter change request OS \nAny operator station (used for commands)
126 2001577 Command: Originated from HMI local
127 2001689 Plant control: No operator station selected Operation by any remote operator station: Blocked. Check local / remote switch
128 2001690 Plant control: Operator station HMI local selected
129 2001697 Plant control: Operator station change prohibited OS \nAny operator station (used for commands) Changing to another HMI or other operator station: Blocked. Check HMI for further fault indications. Check login and access rights.
130 2001705 Plant control: Automatic sequence aborted Automatic sequence: Stopped due to fault condition. Check HMI for further fault indications. Restart sequence after clearing.
131 2001708 Plant control: Automatic sequence stopped
132 2001712 Plant control: Status platform disconnected
133 2001719 Plant control: Automatic insert sequence active
134 2001720 Plant control: Automatic disconnect sequence active
135 2001753 Plant control: Normal mode selected
136 2001754 Plant control: Emergency mode selected Emergency mode: Selected. Reduced interlocking to disconnect the bank. Capacitors are discharged (timer controlled) and line de-energized.
137 2001760 Plant control: Operation mode change prohibited Changing of mode of operation (normal
138 2001785 System 1: 220/24VDC MCB tripped =X3+SE3-F112/-F113/-F114 \nSystem 1 DC feeder 220V/24V
139 2001786 System 2: 220/24VDC MCB tripped =X3+SE3-F212/-F213/-F214 \nSystem 2 DC feeder 220V/24V
140 2001787 System 1/2: 220/24VDC MCB tripped =X3+SE3-F100/-F111/-F200/-F211/-F310/-F314/-F315 \nSystem 1/2 DC feeder 220V/24V
141 2001788 Field wetting: MCB tripped =X3+SE3-F311 \nField wetting DC feeder 220V
142 2001789 AC power supply: MCB tripped =X3+SE3-F3 \nAC feeder in C&P
143 2001795 DC distribution 1: Alarm =NK01 \nDC distribution 1 =NK01: Check DC Distribution 1 supply. Check wiring for short circuits.
144 2001796 DC distribution 2: Alarm =NK01 \nDC distribution 2 =NK01: Check DC Distribution 2 supply. Check wiring for short circuits.
145 2001797 AC distribution 1: Alarm
146 2001798 AC Distribution 2: Alarm
147 2001799 Air condition: Alarm A/C \nAir condition Local control room: Check aircondition system.
148 2001800 Fire fighting system: Alarm FIREPROT \nFire fighting system / detectors Local control room: Fire!
149 2001802 Fault recorder: Triggered
150 2001803 Emergency bypass: Activated
151 2001804 Redundancy changeover: Blocked
152 2001817 Bank ground switch 1: Equivalence failure ES1-CD \nBank ground switch 1 ES1: Open & close position at the same time or no check back signals. Check ES1. Check electrical cicruits.
153 2001818 Bank ground switch 1: Runtime failure ES1-CD \nBank ground switch 1 ES1: Switch has not reached the selected position within preset running time. Check ES1. Check operation of the switch.
154 2001819 Bank ground switch 1: Switched without command ES1-CD \nBank ground switch 1 ES1: Switch has operated without command of any operator station.
155 2001830 Bank ground switch 1: Interlocking ES1-CD \nBank ground switch 1
156 2001849 Bank ground switch 2: Equivalence failure ES2-CD \nBank ground switch 2 ES2: Open & close position at the same time or no check back signals. Check ES2. Check electrical cicruits.
157 2001850 Bank ground switch 2: Runtime failure ES2-CD \nBank ground switch 2 ES2: Switch has not reached the selected position within preset running time. Check ES2. Check operation of the switch.
158 2001851 Bank ground switch 2: Switched without command ES2-CD \nBank ground switch 2 ES2: Switch has operated without command of any operator station.
159 2001862 Bank ground switch 2: Interlocking ES2-CD \nBank ground switch 2
160 2001881 Disconnect switch 1: Equivalence failure DS1-CD \nBank disconnect switch 1 DS1: Open & close position at the same time or no check back signals. Check DS1. Check electrical cicruits.
161 2001882 Disconnect switch 1: Runtime failure DS1-CD \nBank disconnect switch 1 DS1: Switch has not reached the selected position within preset running time. Check DS1. Check operation of the switch.
162 2001883 Disconnect switch 1: Switched without command DS1-CD \nBank disconnect switch 1 DS1: Switch has operated without command of any operator station.
163 2001894 Disconnect switch 1: Interlocking DS1-CD \nBank disconnect switch 1
164 2001913 Disconnect switch 2: Equivalence failure DS2-CD \nBank disconnect switch 2 DS2: Open & close position at the same time or no check back signals. Check DS2. Check electrical cicruits.
165 2001914 Disconnect switch 2: Runtime failure DS2-CD \nBank disconnect switch 2 DS2: Switch has not reached the selected position within preset running time. Check DS2. Check operation of the switch.
166 2001915 Disconnect switch 2: Switched without command DS2-CD \nBank disconnect switch 2 DS2: Switch has operated without command of any operator station.
167 2001926 Disconnect switch 2: Interlocking DS2-CD \nBank disconnect switch 2
168 2001945 Main bypass switch: Equivalence failure MBS-CD \nMain bypass switch MBS: Open & close position at the same time or no check back signals. Check MBS. Check electrical cicruits.
169 2001946 Main bypass switch: Runtime failure MBS-CD \nMain bypass switch MBS: Switch has not reached the selected position within preset running time. Check MBS. Check operation of the switch.
170 2001947 Main bypass switch: Switched without command MBS-CD \nMain bypass switch MBS: Switch has operated without command of any operator station.
171 2001958 Main bypass switch: Interlocking MBS-CD \nMain bypass switch
172 2002041 Bypass breaker 1: Equivalence failure BBR1-CD \nBypass breaker 1 BBR1: Open & close position at the same time or no check back signals. Check BBR1. Check electrical cicruits.
173 2002042 Bypass breaker 1: Runtime failure BBR1-CD \nBypass breaker 1 BBR1: Switch has not reached the selected position within preset running time. Check BBR1. Check operation of the switch.
174 2002043 Bypass breaker 1: Switched without command BBR1-CD \nBypass breaker 1 BBR1: Switch has operated without command of any operator station.
175 2002054 Bypass breaker 1: Interlocking BBR1-CD \nBypass breaker 1
176 2002334 System 2: Controller system fault =R12+SR12.B \nTDC system 2 (OLC+PR)
177 2002335 System 2: Controller power supply fault =R12+SR12.B \nTDC system 2 (OLC+PR)
178 2002336 System 2: Controller fan fault =R12+SR12.B \nTDC system 2 (OLC+PR)
179 2002337 System 1: Cubicle overtemperature =R12+SR12: Check venting (fans
180 2002343 System 1: Line voltage transducer MCB tripped +X2-F141 \nLine voltage measuring transducer supervision 1
181 2002355 System 1: Monitor Lockout =R11+SR11.B \nTDC system 1 (OLC + PR)
182 2002356 System 1: Lockout relais closed =R11+SR11-K110 / -K120 \nLockout relais 1 =R11+SR11: Status information of lockout relays (-K11
183 2002357 System 2: Lockout relais closed =R12+SR12-K21 / -K22 \nLockout relais 2 =R12+SR12: Status information of lockout relays (-K11
184 2002358 Operator command: Reset lockout
185 2002359 System 1: Fast bypass =R11+SR11.B10 \nCPU 2 (Protection) in system 1
186 2002360 System 1: External command: Open bypass breaker Customer \nLine Protection Interface
187 2002388 System 1: External bypass phase R Customer \nLine Protection Interface =R11+SR11: Temporary bypass command from external device (Line protection).
188 2002389 System 1: External bypass phase Y Customer \nLine Protection Interface =R11+SR11: Temporary bypass command from external device (Line protection).
189 2002390 System 1: External bypass phase B Customer \nLine Protection Interface =R11+SR11: Temporary bypass command from external device (Line protection).
190 2002473 System 1: MOV overtemperature =R11+SR11: MOV temperature >125░C due to line faults. Reinsertion released as soon as MOV temperature <65░C. No automatic reinsertion.
191 2002474 System 1: MOV high current
192 2002475 System 1: MOV temperature gradient high
193 2002476 System 1: MOV temperature gradient low =R11+SR11: MOV temperature has exceeded rating due to line faults. Automatic reinsertion follows after 60s if enabled.
194 2002477 System 1: MOV fault branch -F1 phase R
195 2002478 System 1: MOV fault branch -F1 phase Y
196 2002479 System 1: MOV fault branch -F1 phase B
197 2002480 System 1: MOV fault branch -F2 phase R
198 2002481 System 1: MOV fault branch -F2 phase Y
199 2002482 System 1: MOV fault branch -F2 phase B
200 2002483 System 1: Gap refused trigger
201 2002484 System 1: Gap delayed trigger
202 2002485 System 1: Gap prolonged conduction
203 2002486 System 1: Gap self trigger
204 2002497 System 1: Bypass breaker failed to close BBR1-CD \nBypass breaker own segment
205 2002498 System 1: Bypass breaker failed to open BBR1-CD \nBypass breaker own segment
206 2002499 System 1: Bypass breaker aux. contact discordance BBR1-CD \nBypass breaker own segment
207 2002500 System 1: Bypass breaker pole discordance BBR1-CD \nBypass breaker own segment
208 2002569 System 1: Gap trigger phase R
209 2002570 System 1: Gap trigger phase Y
210 2002571 System 1: Gap trigger phase B
211 2002577 System 1: MOV temperature too high for reinsertion =R11+SR11: MOV temperature >65░C. Reinsertion blocked.
212 2002579 System 1: MOV overload
213 2002580 System 1: MOV unbalance
214 2002582 System 1: Platform protection
215 2002583 System 1: Gap protection
216 2002585 System 1: Capacitor unbalance alarm =B0-C3x \nCapacitor protection functions
217 2002586 System 1: Capacitor unbalance bypass =B0-C3x \nCapacitor protection functions
218 2002587 System 1: Capacitor overload =B0-C3x \nCapacitor protection functions =R11+SR11: Capacitor current / voltage above rating. Check transmission system. Check impedance setting (TCSC only). Insert manually after the overload situation has cleared.
219 2002590 System 1: Bypass breaker fail BBR1-CD \nBypass breaker own segment
220 2002593 System 1: Phase indication: Phase R =R11+SR11.B \nTDC system 1 (OLC + PR)
221 2002594 System 1: Phase indication: Phase Y =R11+SR11.B \nTDC system 1 (OLC + PR)
222 2002595 System 1: Phase indication: Phase B =R11+SR11.B \nTDC system 1 (OLC + PR)
223 2002599 System 1: Protection blocked =R11+SR11.B \nTDC system 1 (OLC + PR)
224 2002601 System 1: Reset lockout =R11+SR11-K110 / -K120 \nLockout relais 1
225 2002602 System 1: Permanent bypass BBR1-CD \nBypass breaker own segment
226 2002603 System 1: Temporary bypass phase R BBR1-CD \nBypass breaker own segment
227 2002604 System 1: Temporary bypass phase Y BBR1-CD \nBypass breaker own segment
228 2002605 System 1: Temporary bypass phase B BBR1-CD \nBypass breaker own segment
229 2002606 System 1: Reinsertion BBR1-CD \nBypass breaker own segment
230 2002607 System 1: Line trip =R11+SR11.B10 \nCPU 2 (Protection) in system 1 =R11+SR11: Trip command to line protection. Check HMI for further fault messages. Check TFR recording. Check BBR and cooling system. Bypassing of bank via MBS is released after line is de-energized and capacitors are discharged (10min).
231 2002713 System 1: Communication fault 6MD =X2+SP2-A1 \nSU200 #1 (Binary interface)
232 2002729 System 1: Communication fault local HMI =R11+SR11.B01 \nCPU 1 (Plant Control) in system 1
233 2002730 System 1: Communication fault remote HMI =R11+SR11.B01 \nCPU 1 (Plant Control) in system 1
234 2002732 System 1: Communication fault system 2 =R11+SR11.B01 \nCPU 1 (Plant Control) in system 1 =R11+SR11: Check LAN connection to system 1.
235 2002737 System 1: Communication fault 6MD =R11+SR11.B01 \nCPU 1 (Plant Control) in system 1
236 2002745 System 1: Communication fault Profibus =R11+SR11.B01 \nCPU 1 (Plant Control) in system 1
237 2002746 System 1: Communication initialization fault 6MD =R11+SR11.B01 \nCPU 1 (Plant Control) in system 1
238 2002748 System 1: Communication hardware alarm =R11+SR11.B21 / +SR-A10 \nLAN hardware components system 1
239 2002749 System 1: Master clock hardware fault
240 2002750 System 1: Time synchronization disturbed =R11+SR11.B \nTDC system 1 (OLC + PR)
241 2002751 System 1: Digital fault recorder fault
242 2002753 System 1: Controller backup battery fault =R11+SR11.B \nTDC system 1 (OLC + PR) =R11+SR11: Replace battery of power supply unit of SIMATIC TDC rack (type MIGNON AA).
243 2002754 System 1: Plant control fault =R11+SR11.B \nTDC system 1 (OLC + PR)
244 2002755 System 1: Plant control active =R11+SR11-K5 \nChange over logic 1
245 2002756 System 1: Plant control passive =R11+SR11-K5 \nChange over logic 1
246 2002757 System 1: Plant control ready =R11+SR11.B \nTDC system 1 (OLC + PR)
247 2002759 System 1: Plant control redundancy update fault =R11+SR11.B01 \nCPU 1 (Plant Control) in system 1
248 2002767 System 1: LO6 / Opto 68 channel 1 fault =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Failure of optical sensor. Check indications on LO6M module +.B05 in SIMATIC TDC rack.
249 2002768 System 1: LO6 / Opto 68 channel 2 fault =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Failure of optical sensor. Check indications on LO6M module +.B05 in SIMATIC TDC rack.
250 2002769 System 1: LO6 / Opto 68 channel 3 fault =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Failure of optical sensor. Check indications on LO6M module +.B05 in SIMATIC TDC rack.
251 2002770 System 1: LO6 / GTE channel 1 fault =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Failure of gap trigger electronic. Check indications on LO6M module +.B05 in SIMATIC TDC rack.
252 2002771 System 1: LO6 / GTE channel 2 fault =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Failure of gap trigger electronic. Check indications on LO6M module +.B05 in SIMATIC TDC rack.
253 2002772 System 1: LO6 / GTE channel 3 fault =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Failure of gap trigger electronic. Check indications on LO6M module +.B05 in SIMATIC TDC rack.
254 2002793 System 1: LO6 / Opto68 channel 1 communication warning =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Single communication failures of telegram transfer between optical sensor and LO6M module +.B05.
255 2002794 System 1: LO6 / Opto68 channel 1 laser current warning =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Laser current of optical power supply >1.4A. Check trendcurve on the HMI.
256 2002795 System 1: LO6 / Opto68 channel 2 communication warning =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Single communication failures of telegram transfer between optical sensor and LO6M module +.B05.
257 2002796 System 1: LO6 / Opto68 channel 2 laser current warning =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Laser current of optical power supply >1.4A. Check trendcurve on the HMI.
258 2002797 System 1: LO6 / Opto68 channel 3 communication warning =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Single communication failures of telegram transfer between optical sensor and LO6M module +.B05.
259 2002798 System 1: LO6 / Opto68 channel 3 laser current warning =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Laser current of optical power supply >1.4A. Check trendcurve on the HMI.
260 2002809 System 1: LO6 / GTE channel 1 communication warning =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Single communication failures of telegram transfer between GTE55 and LO6M module +.B05.
261 2002810 System 1: LO6 / GTE channel 1 laser current warning =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Laser current of optical power supply >1.5A. Check trendcurve on HMI.
262 2002811 System 1: LO6 / GTE channel 1 self trigger =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1
263 2002812 System 1: LO6 / GTE channel 1 refused trigger =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1
264 2002813 System 1: LO6 / GTE channel 1 low trigger voltage =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1
265 2002814 System 1: LO6 / GTE channel 2 communication warning =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Single communication failures of telegram transfer between GTE5 and LO6M module +.B05.
266 2002815 System 1: LO6 / GTE channel 2 laser current warning =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Laser current of optical power supply >1.5A. Check trendcurve on HMI.
267 2002816 System 1: LO6 / GTE channel 2 self trigger =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1
268 2002817 System 1: LO6 / GTE channel 2 refused trigger =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1
269 2002818 System 1: LO6 / GTE channel 2 low trigger voltage =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1
270 2002819 System 1: LO6 / GTE channel 3 communication warning =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Single communication failures of telegram transfer between GTE5 and LO6M module +.B05.
271 2002820 System 1: LO6 / GTE channel 3 laser current warning =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Laser current of optical power supply >1.5A. Check trendcurve on HMI.
272 2002821 System 1: LO6 / GTE channel 3 self trigger =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1
273 2002822 System 1: LO6 / GTE channel 3 refused trigger =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1
274 2002823 System 1: LO6 / GTE channel 3 low trigger voltage =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1
275 2002889 System 1: LO6A slot -B02 fault =R11+SR11.B02 \nLO6A #1 in system 1
276 2002890 System 1: LO6A slot -B03 fault =R11+SR11.B03 \nLO6A #2 in system 1
277 2002891 System 1: LO6A slot -B04 fault =R11+SR11.B04 \nLO6A #3 in system 1
278 2002892 System 1: LO6A slot -B09 fault =R11+SR11.B09 \nLO6A #4 in system 1
279 2002922 System 1: Protection parameter changed =R11+SR11.B \nTDC system 1 (OLC + PR)
280 2002923 System 1: Protection parameter update from system 2 =R11+SR11.B01 \nCPU 1 (Plant Control) in system 1 =R11+SR11: Update of parameter settings of protection by Master (If system 2 is master only). Redundancy update.
281 2002928 System 1: Protection parameter redundancy update fault =R11+SR11.B01 \nCPU 1 (Plant Control) in system 1
282 2002929 System 1: Open command for bypass breaker 1 to protection =R11+SR11.B \nTDC system 1 (OLC + PR)
283 2002930 System 1: Close command for bypass breaker 1 to protection =R11+SR11.B \nTDC system 1 (OLC + PR)
284 2002932 System 1: Block command to protection =R11+SR11.B \nTDC system 1 (OLC + PR)
285 2002933 System 1: Release command to protection =R11+SR11.B \nTDC system 1 (OLC + PR)
286 2002934 System 1: Platform disconnected status to protection =R11+SR11.B \nTDC system 1 (OLC + PR)
287 2002942 System 1: Controller system fault =R11+SR11.B \nTDC system 1 (OLC + PR)
288 2002943 System 1: Controller power supply fault =R11+SR11.B \nTDC system 1 (OLC + PR)
289 2002944 System 1: Controller fan fault =R11+SR11.B \nTDC system 1 (OLC + PR)
290 2002945 System 2: Cubicle overtemperature =R12+SR12-S231 \nCubicle temperature system 2 =R11+SR11: Check venting (fans
291 2002963 System 2: Monitor Lockout =R12+SR12.B \nTDC system 2 (OLC+PR)
292 2002964 System 2: Lockout relais closed =R12+SR12-K21 / -K22 \nLockout relais 2 =R12+SR12: Status information of lockout relays (-K11
293 2002965 System 1: Lockout relais closed =R11+SR11-K110 / -K120 \nLockout relais 1 =R12+SR12: Status information of lockout relays (-K11
294 2002966 Operator command: Reset lockout
295 2002967 System 2: Fast bypass =R12+SR12.B10 \nCPU 2 (Protection) in system 2
296 2002968 System 2: External command: Open bypass breaker Customer \nLine Protection Interface
297 2002996 System 2: External bypass phase R Customer \nLine Protection Interface =R12+SR12: Temporary bypass command from external device (Line protection).
298 2002997 System 2: External bypass phase Y Customer \nLine Protection Interface =R12+SR12: Temporary bypass command from external device (Line protection).
299 2002998 System 2: External bypass phase B Customer \nLine Protection Interface =R12+SR12: Temporary bypass command from external device (Line protection).
300 2003081 System 2: MOV overtemperature =R12+SR12: MOV temperature >125░C due to line faults. Reinsertion released as soon as MOV temperature <65░C. No automatic reinsertion.
301 2003082 System 2: MOV high current
302 2003083 System 2: MOV temperature gradient high
303 2003084 System 2: MOV temperature gradient low =R12+SR12: MOV temperature has exceeded rating due to line faults. Automatic reinsertion follows after 60s.
304 2003085 System 2: MOV fault branch -F1 phase R
305 2003086 System 2: MOV fault branch -F1 phase Y
306 2003087 System 2: MOV fault branch -F1 phase B
307 2003088 System 2: MOV fault branch -F2 phase R
308 2003089 System 2: MOV fault branch -F2 phase Y
309 2003090 System 2: MOV fault branch -F2 phase B
310 2003091 System 2: Gap refused trigger
311 2003092 System 2: Gap delayed trigger
312 2003093 System 2: Gap prolonged conduction
313 2003094 System 2: Gap self trigger
314 2003105 System 2: Bypass breaker failed to close BBR1-CD \nBypass breaker own segment
315 2003106 System 2: Bypass breaker failed to open BBR1-CD \nBypass breaker own segment
316 2003107 System 2: Bypass breaker aux. contact discordance BBR1-CD \nBypass breaker own segment
317 2003108 System 2: Bypass breaker pole discordance BBR1-CD \nBypass breaker own segment
318 2003177 System 2: Gap trigger phase R
319 2003178 System 2: Gap trigger phase Y
320 2003179 System 2: Gap trigger phase B
321 2003185 System 2: MOV temperature too high for reinsertion =R12+SR12: MOV temperature <65░C. Reinsertion blocked.
322 2003187 System 2: MOV overload
323 2003188 System 2: MOV unbalance
324 2003190 System 2: Platform protection
325 2003191 System 2: Gap protection
326 2003193 System 2: Capacitor unbalance alarm =B0-C3x \nCapacitor protection functions
327 2003194 System 2: Capacitor unbalance bypass =B0-C3x \nCapacitor protection functions
328 2003195 System 2: Capacitor overload =B0-C3x \nCapacitor protection functions =R12+SR12: Capacitor current / voltage above rating. Check transmission system. Check impedance setting (TCSC only). Insert manually after the overload situation has cleared.
329 2003198 System 2: Bypass breaker fail BBR1-CD \nBypass breaker own segment
330 2003201 System 2: Phase indication: Phase R =R12+SR12.B \nTDC system 2 (OLC+PR)
331 2003202 System 2: Phase indication: Phase Y =R12+SR12.B \nTDC system 2 (OLC+PR)
332 2003203 System 2: Phase indication: Phase B =R12+SR12.B \nTDC system 2 (OLC+PR)
333 2003207 System 2: Protection blocked =R12+SR12.B \nTDC system 2 (OLC+PR)
334 2003209 System 2: Reset lockout =R12+SR12-K21 / -K22 \nLockout relais 2
335 2003210 System 2: Permanent bypass BBR1-CD \nBypass breaker own segment
336 2003211 System 2: Temporary bypass phase R BBR1-CD \nBypass breaker own segment
337 2003212 System 2: Temporary bypass phase Y BBR1-CD \nBypass breaker own segment
338 2003213 System 2: Temporary bypass phase B BBR1-CD \nBypass breaker own segment
339 2003214 System 2: Reinsertion BBR1-CD \nBypass breaker own segment
340 2003215 System 2: Line trip =R12+SR12.B10 \nCPU 2 (Protection) in system 2 =R12+SR12: Trip command to line protection. Check HMI for further fault messages. Check TFR recording. Check BBR and cooling system. Bypassing of bank via MBS is released after line is de-energized and capacitors are discharged (10min).
341 2003321 System 2: Communication fault 6MD =X2+SP2-A1 \nSU200 #1 (Binary interface)
342 2003337 System 2: Communication fault local HMI =R12+SR12.B01 \nCPU 1 (Plant Control) in system 2
343 2003340 System 2: Communication fault system 1 =R12+SR12.B01 \nCPU 1 (Plant Control) in system 2 =R12+SR12: Check LAN connection to system 2.
344 2003353 System 2: Communication fault Profibus =R12+SR12.B01 \nCPU 1 (Plant Control) in system 2
345 2003354 System 2: Communication initialization fault 6MD =R12+SR12.B01 \nCPU 1 (Plant Control) in system 2
346 2003356 System 2: Communication hardware alarm =R12+SR12.B21 / +SR-A20 \nLAN hardware components system 2
347 2003357 System 2: Master clock hardware fault
348 2003358 System 2: Time synchronization disturbed =R12+SR12.B \nTDC system 2 (OLC+PR)
349 2003359 System 2: Digital fault recorder fault
350 2003361 System 2: Controller backup battery fault =R12+SR12.B \nTDC system 2 (OLC+PR) =R12+SR12: Replace battery of power supply unit of SIMATIC TDC rack (type MIGNON AA).
351 2003362 System 2: Plant control fault =R12+SR12.B \nTDC system 2 (OLC+PR)
352 2003363 System 2: Plant control active =R12+SR12-K5 \nChange over logic 2
353 2003364 System 2: Plant control passive =R12+SR12-K5 \nChange over logic 2
354 2003365 System 2: Plant control ready =R12+SR12.B \nTDC system 2 (OLC+PR)
355 2003367 System 2: Plant control redundancy update fault =R12+SR12-K21 / -K22 \nLockout relais 2
356 2003375 System 2: LO6 / Opto 68 channel 1 fault =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Failure of optical sensor. Check indications on LO6M module +.B05 in SIMATIC TDC rack.
357 2003376 System 2: LO6 / Opto 68 channel 2 fault =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Failure of optical sensor. Check indications on LO6M module +.B05 in SIMATIC TDC rack.
358 2003377 System 2: LO6 / Opto 68 channel 3 fault =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Failure of optical sensor. Check indications on LO6M module +.B05 in SIMATIC TDC rack.
359 2003378 System 2: LO6 / GTE channel 1 fault =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Failure of gap trigger electronic. Check indications on LO6M module +.B05 in SIMATIC TDC rack.
360 2003379 System 2: LO6 / GTE channel 2 fault =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Failure of gap trigger electronic. Check indications on LO6M module +.B05 in SIMATIC TDC rack.
361 2003380 System 2: LO6 / GTE channel 3 fault =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Failure of gap trigger electronic. Check indications on LO6M module +.B05 in SIMATIC TDC rack.
362 2003401 System 2: LO6 / Opto68 channel 1 communication warning =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Single communication failures of telegram transfer between optical sensor and LO6M module +.B05.
363 2003402 System 2: LO6 / Opto68 channel 1 laser current warning =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Laser current of optical power supply >1.4A. Check trendcurve on the HMI.
364 2003403 System 2: LO6 / Opto68 channel 2 communication warning =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Single communication failures of telegram transfer between optical sensor and LO6M module +.B05.
365 2003404 System 2: LO6 / Opto68 channel 2 laser current warning =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Laser current of optical power supply >1.4A. Check trendcurve on the HMI.
366 2003405 System 2: LO6 / Opto68 channel 3 communication warning =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Single communication failures of telegram transfer between optical sensor and LO6M module +.B05.
367 2003406 System 2: LO6 / Opto68 channel 3 laser current warning =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Laser current of optical power supply >1.4A. Check trendcurve on the HMI.
368 2003414 System 2: GTE phase L1 low external power supply =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2
369 2003415 System 2: GTE phase L2 low external power supply =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2
370 2003416 System 2: GTE phase L3 low external power supply =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2
371 2003417 System 2: LO6 / GTE channel 1 communication warning =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Single communication failures of telegram transfer between GTE5 and LO6M module +.B05.
372 2003418 System 2: LO6 / GTE channel 1 laser current warning =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Laser current of optical power supply >1.5A. Check trendcurve on HMI.
373 2003419 System 2: LO6 / GTE channel 1 self trigger =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2
374 2003420 System 2: LO6 / GTE channel 1 refused trigger =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2
375 2003421 System 2: LO6 / GTE channel 1 low trigger voltage =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2
376 2003422 System 2: LO6 / GTE channel 2 communication warning =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Single communication failures of telegram transfer between GTE5 and LO6M module +.B05.
377 2003423 System 2: LO6 / GTE channel 2 laser current warning =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Laser current of optical power supply >1.5A. Check trendcurve on HMI.
378 2003424 System 2: LO6 / GTE channel 2 self trigger =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2
379 2003425 System 2: LO6 / GTE channel 2 refused trigger =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2
380 2003426 System 2: LO6 / GTE channel 2 low trigger voltage =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2
381 2003427 System 2: LO6 / GTE channel 3 communication warning =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Single communication failures of telegram transfer between GTE5 and LO6M module +.B05.
382 2003428 System 2: LO6 / GTE channel 3 laser current warning =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Laser current of optical power supply >1.5A. Check trendcurve on HMI.
383 2003429 System 2: LO6 / GTE channel 3 self trigger =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2
384 2003430 System 2: LO6 / GTE channel 3 refused trigger =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2
385 2003431 System 2: LO6 / GTE channel 3 low trigger voltage =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2
386 2003497 System 2: LO6A slot -B02 fault =R12+SR12.B02 \nLO6A #1 in system 2
387 2003498 System 2: LO6A slot -B03 fault =R12+SR12.B03 \nLO6A #2 in system 2
388 2003499 System 2: LO6A slot -B04 fault =R12+SR12.B04 \nLO6A #3 in system 2
389 2003500 System 2: LO6A slot -B09 fault =R12+SR12.B09 \nLO6A #4 in system 2
390 2003530 System 2: Protection parameter changed =R12+SR12.B \nTDC system 2 (OLC+PR)
391 2003531 System 2: Protection parameter update from system 1 =R12+SR12.B01 \nCPU 1 (Plant Control) in system 2 =R12+SR12: Update of parameter settings of protection by Master (If system 2 is master only). Redundancy update.
392 2003536 System 2: Protection parameter redundancy update fault =R12+SR12.B01 \nCPU 1 (Plant Control) in system 2
393 2003537 System 2: Open command for bypass breaker 1 to protection =R12+SR12.B \nTDC system 2 (OLC+PR)
394 2003538 System 2: Close command for bypass breaker 1 to protection =R12+SR12.B10 \nCPU 2 (Protection) in system 2
395 2003540 System 2: Block command to protection =R12+SR12.B01 \nCPU 1 (Plant Control) in system 2
396 2003541 System 2: Release command to protection =R12+SR12.B \nTDC system 2 (OLC+PR)
397 2003542 System 2: Platform disconnected status to protection =R12+SR12.B01 \nCPU 1 (Plant Control) in system 2
398 2003545 Protection 1: Platform fault protection on
399 2003546 Protection 1: Gap self trigger on
400 2003547 Protection 1: Gap prolonged conduction on
401 2003548 Protection 1: Gap delayed/refused trigger on
402 2003549 Protection 1: MOV high current on
403 2003550 Protection 1: MOV temperature overload on
404 2003551 Protection 1: MOV temperature gradient - high set on
405 2003552 Protection 1: MOV temperature gradient - low set on
406 2003553 Protection 1: MOV unbalance protection on =R11+SR11.B10 \nCPU 2 (Protection) in system 1
407 2003556 Protection 1: Prevent reinsertion on =R11+SR11.B10 \nCPU 2 (Protection) in system 1
408 2003557 Protection 1: Capacitor unbalance alarm on =B0-C3x \nCapacitor protection functions
409 2003558 Protection 1: Capacitor unbalance bypass - low set on =R11+SR11.B10 \nCPU 2 (Protection) in system 1
410 2003559 Protection 1: Capacitor unbalance bypass - high set on =B0-C3x \nCapacitor protection functions
411 2003561 Protection 1: Capacitor unbalance counter on =R11+SR11.B10 \nCPU 2 (Protection) in system 1
412 2003562 Protection 1: Capacitor overload protection on =B0-C3x \nCapacitor protection functions
413 2003563 Protection 1: Bypass breaker fail protection on BBR1-CD \nBypass breaker 1
414 2003564 Protection 1: Bypass breaker pole discordance on BBR1-CD \nBypass breaker 1
415 2003565 Protection 1: Bypass breaker aux. contact discordance on BBR1-CD \nBypass breaker 1
416 2003567 Protection 1: Single phase operation on =R11+SR11.B10 \nCPU 2 (Protection) in system 1
417 2003568 Protection 1: Auto-reinsertion on =R11+SR11.B10 \nCPU 2 (Protection) in system 1
418 2003577 System 1: DSP lifecounter fault =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Hardware fault of LO6plusA unit on slots +.B05-09 within SIMATIC TDC rack. Check fault indications on modules.
419 2003578 System 1: DSP parameter fault =R11+SR11.B08 / B09 \nLO6 #1 and LO6A#5 system 1 =R11+SR11: Hardware fault of LO6plusA unit on slots +.B05-09 within SIMATIC TDC rack. Check fault indications on modules.
420 2003579 System 1: CPU fault =R11+SR11.B10 \nCPU 2 (Protection) in system 1 =R11+SR11: Hardware fault of protection processing unit. Check fault indications on +.B10 within SIMATIC TDC rack.
421 2003585 System 1: DSP lifecounter fault =R11+SR11.B14 / B15 \nLO6 #1 and LO6A#4 in system 1 =R11+SR11: Hardware fault of LO6plusA unit on slots +.B11-15 within SIMATIC TDC rack. Check fault indications on modules.
422 2003586 System 1: DSP parameter fault =R11+SR11.B14 / B15 \nLO6 #1 and LO6A#4 in system 1 =R11+SR11: Hardware fault of LO6plusA unit on slots +.B11-15 within SIMATIC TDC rack. Check fault indications on modules.
423 2003593 Protection 2: Platform fault protection on
424 2003594 Protection 2: Gap self trigger on
425 2003595 Protection 2: Gap prolonged conduction on
426 2003596 Protection 2: Gap delayed/refused trigger on
427 2003597 Protection 2: MOV high current on
428 2003598 Protection 2: MOV temperature overload on
429 2003599 Protection 2: MOV temperature gradient - high set on
430 2003600 Protection 2: MOV temperature gradient - low set on
431 2003601 Protection 2: MOV unbalance protection on =R12+SR12.B10 \nCPU 2 (Protection) in system 2
432 2003604 Protection 2: Prevent reinsertion on =R12+SR12.B10 \nCPU 2 (Protection) in system 2
433 2003605 Protection 2: Capacitor unbalance alarm on =B0-C3x \nCapacitor protection functions
434 2003606 Protection 2: Capacitor unbalance bypass - low set on =R12+SR12.B10 \nCPU 2 (Protection) in system 2
435 2003607 Protection 2: Capacitor unbalance bypass - high set on =B0-C3x \nCapacitor protection functions
436 2003609 Protection 2: Capacitor unbalance counter on =R12+SR12.B10 \nCPU 2 (Protection) in system 2
437 2003610 Protection 2: Capacitor overload protection on =B0-C3x \nCapacitor protection functions
438 2003611 Protection 2: Bypass breaker fail protection on BBR1-CD \nBypass breaker 1
439 2003612 Protection 2: Bypass breaker pole discordance on BBR1-CD \nBypass breaker 1
440 2003613 Protection 2: Bypass breaker aux. contact discordance on BBR1-CD \nBypass breaker 1
441 2003615 Protection 2: Single phase operation on =R12+SR12.B10 \nCPU 2 (Protection) in system 2
442 2003616 Protection 2: Auto-reinsertion on =R12+SR12.B10 \nCPU 2 (Protection) in system 2
443 2003625 System 2: DSP lifecounter fault =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Hardware fault of LO6plusA unit on slots +.B05-09 within SIMATIC TDC rack. Check fault indications on modules.
444 2003626 System 2: DSP parameter fault =R12+SR12.B08 / B09 \nLO6 #1 and LO6A#5 system 2 =R12+SR12: Hardware fault of LO6plusA unit on slots +.B05-09 within SIMATIC TDC rack. Check fault indications on modules.
445 2003627 System 2: CPU fault =R12+SR12.B10 \nCPU 2 (Protection) in system 2 =R12+SR12: Hardware fault of protection processing unit. Check fault indications on +.B10 within SIMATIC TDC rack.
446 2003633 System 2: DSP lifecounter fault =R12+SR12.B14 / B15 \nLO6 #1 and LO6A#4 in system 2 =R12+SR12: Hardware fault of LO6plusA unit on slots +.B11-15 within SIMATIC TDC rack. Check fault indications on modules.
447 2003634 System 2: DSP parameter fault =R12+SR12.B14 / B15 \nLO6 #1 and LO6A#4 in system 2 =R12+SR12: Hardware fault of LO6plusA unit on slots +.B11-15 within SIMATIC TDC rack. Check fault indications on modules.
448 2009801 6MD #01: Status start-up (S-141) =X2+SP2-A1 \nSU200 #1 (Binary interface)
449 2009802 6MD #01: Disturbed device (S-142) =X2+SP2-A1 \nSU200 #1 (Binary interface)
450 2009803 6MD #01: Status device disturbance cleared (S-143) =X2+SP2-A1 \nSU200 #1 (Binary interface)
451 2009804 6MD #01: Faulty device (S-144) =X2+SP2-A1 \nSU200 #1 (Binary interface)
452 2009805 6MD #01: Faulty output (S-145) =X2+SP2-A1 \nSU200 #1 (Binary interface)
453 2009806 6MD #01: Status local control mode (S-146) =X2+SP2-A1 \nSU200 #1 (Binary interface)
454 2009807 6MD #01: Status remote control mode (S-147) =X2+SP2-A1 \nSU200 #1 (Binary interface)
S. No. VOLT. LEVEL BAY NAME BAY NUM. FEEDER TYPE DEVICE IDENTIFICATION POINT DESCRIPTION DATA TYPE IEC 104 ADDRESS REMARK
1 …KV XXXXXX BAY NO FSC BAY NO-52BBR BPCB OPEN/CLOSE STATUS DPS
3 …KV XXXXXX BAY NO FSC BAY NO-52BBR-RPh BPCB R PHASE OPEN/CLOSE STATUS DPS
5 …KV XXXXXX BAY NO FSC BAY NO-52BBR-YPh BPCB Y PHASE OPEN/CLOSE STATUS DPS
7 …KV XXXXXX BAY NO FSC BAY NO-52BBR-Bph BPCB B PHASE OPEN/CLOSE STATUS DPS
9 …KV XXXXXX BAY NO FSC BAY NO-89MBS BYPASS MBS ISOLATOR OPEN/CLOSE STATUS DPS
10 …KV XXXXXX BAY NO FSC BAY NO-89DS1 ISOLATOR 1 OPEN/CLOSE STATUS DPS
11 …KV XXXXXX BAY NO FSC BAY NO-89DS2 ISOLATOR 2 OPEN/CLOSE STATUS DPS
12 …KV XXXXXX BAY NO FSC BAY NO-89ES1 EARTH SWITCH 1 OPERATION INTERLOCK SPS
13 …KV XXXXXX BAY NO FSC BAY NO-89ES2 EARTH SWITCH 2 OPERATION INTERLOCK SPS
14 …KV XXXXXX BAY NO FSC BAY NO-89ES1 EARTH SWITCH 1 OPEN/CLOSE STATUS DPS
15 …KV XXXXXX BAY NO FSC BAY NO-89ES2 EARTH SWITCH 2 OPEN/CLOSE STATUS DPS
16 …KV XXXXXX BAY NO FSC BAY NO LINE DE-ENRGIZED SPS
17 …KV XXXXXX BAY NO FSC BAY NO FAULT TO PLATFORM TRIP-1/2 SPS
18 …KV XXXXXX BAY NO FSC BAY NO PERMANENT BYPASS SPS
19 …KV XXXXXX BAY NO FSC BAY NO MOV TEMPERATURE R PHASE AI
20 …KV XXXXXX BAY NO FSC BAY NO MOV TEMPERATURE Y PHASE AI
21 …KV XXXXXX BAY NO FSC BAY NO MOV TEMPERATURE B PHASE AI
22 …KV XXXXXX BAY NO FSC BAY NO CAPACITOR R PHASE CURRENT AI
23 …KV XXXXXX BAY NO FSC BAY NO CAPACITOR Y PHASE CURRENT AI
24 …KV XXXXXX BAY NO FSC BAY NO CAPACITOR B PHASE CURRENT AI
25 …KV XXXXXX BAY NO FSC BAY NO CAPACITOR R PHASE UNBALANCED CURRENT AI
26 …KV XXXXXX BAY NO FSC BAY NO CAPACITOR Y PHASE UNBALANCED CURRENT AI
27 …KV XXXXXX BAY NO FSC BAY NO CAPACITOR B PHASE UNBALANCED CURRENT AI
28 …KV XXXXXX BAY NO FSC BAY NO LINE CT CURRENT R-PH AI
29 …KV XXXXXX BAY NO FSC BAY NO LINE CT CURRENT Y-PH AI
30 …KV XXXXXX BAY NO FSC BAY NO LINE CT CURRENT B-PH AI
31 …KV XXXXXX BAY NO FSC BAY NO-52BBR BPCB STATUS DISCREPANCY SPS
32 …KV XXXXXX BAY NO FSC BAY NO-52BBR BPCB AUX CONTACT DISCORDANCE SPS
33 …KV XXXXXX BAY NO FSC BAY NO-52BBR GENRAL LOCKOUT/MIN OIL PRESSURE LOCKOUT SPS
34 …KV XXXXXX BAY NO FSC BAY NO-52BBR BPCB POLE DISCREPANCY SPS
35 …KV XXXXXX BAY NO FSC BAY NO-52BBR BPCB DC 1/2 FAIL SPS
36 …KV XXXXXX BAY NO FSC BAY NO-52BBR BPCB LOSS OF SF6 SPS
37 …KV XXXXXX BAY NO FSC BAY NO-52BBR 1POLE REINSERTION DURING AR SPS
38 …KV XXXXXX BAY NO FSC BAY NO-52BBR BYPASS BREAKER FAIL TO OPEN SPS COMMON- R-PH,Y-PH,B-PH FAIL TO OPEN
39 …KV XXXXXX BAY NO FSC BAY NO-52BBR BYPASS BREAKER SWITCHWED WITHOUT COMMAND SPS
40 …KV XXXXXX BAY NO FSC BAY NO-52BBR BYPASS BREAKER FAIL TO CLOSE SPS COMMON- R-PH,Y-PH,B-PH FAIL TO CLOSE
41 …KV XXXXXX BAY NO FSC BAY NO-52BBR BYPASS CB SPRING DISCHARGE/FAILURE SPS
42 …KV XXXXXX BAY NO FSC BAY NO-52BBR BPCB OPEN CMD DPC
43 …KV XXXXXX BAY NO FSC BAY NO-52BBR BPCB CLOSE CMD DPC
44 …KV XXXXXX BAY NO FSC BAY NO-52BBR BPCB OPERATION INTERLOCK SPS
45 …KV XXXXXX BAY NO FSC BAY NO-89MBS BYPASS MBS OPEN CMD DPC
46 …KV XXXXXX BAY NO FSC BAY NO-89MBS BYPASS MBS CLOSE CMD DPC
47 …KV XXXXXX BAY NO FSC BAY NO-89MBS BYPASS MBS OPERATION INTERLOCK SPS
48 …KV XXXXXX BAY NO FSC BAY NO-89DS1 BYPASS CAP ISO 1 OPEN CMD DPC
49 …KV XXXXXX BAY NO FSC BAY NO-89DS1 BYPASS CAP ISO 1 CLOSE CMD DPC
50 …KV XXXXXX BAY NO FSC BAY NO-89DS1 BYPASS CAP ISO 1 OPERATION INTERLOCK SPS
51 …KV XXXXXX BAY NO FSC BAY NO-89DS2 BYPASS CAP ISO 2 OPEN CMD DPC
52 …KV XXXXXX BAY NO FSC BAY NO-89DS2 BYPASS CAP ISO 2 CLOSE CMD DPC
53 …KV XXXXXX BAY NO FSC BAY NO-89DS1 DISCONNECTOR 1 PHASE DISAGREEMENT SPS
54 …KV XXXXXX BAY NO FSC BAY NO-89DS1 GENERAL ALARM SPS
55 …KV XXXXXX BAY NO FSC BAY NO-89MBS BYPASS DISCONNECTOR ALARM SPS
56 …KV XXXXXX BAY NO FSC BAY NO-89DS2 DISCONNECTOR 2 PHASE DISAGREEMENT SPS
57 …KV XXXXXX BAY NO FSC BAY NO-89DS2 GENERAL ALARM SPS
58 …KV XXXXXX BAY NO FSC BAY NO-CAP CAPACITOR UNBALANCE ALARM SPS
59 …KV XXXXXX BAY NO FSC BAY NO-CAP CAPACITOR UNBALANCED TRIP SPS FOR BOTH HIGH SET AND LOW SET (IF AVAILABLE)
60 …KV XXXXXX BAY NO FSC BAY NO-CAP CAPACITOR OVERLOAD ALARM SPS
61 …KV XXXXXX BAY NO FSC BAY NO-CAP CAPACITOR OVERLOAD TRIP SPS
62 …KV XXXXXX BAY NO FSC BAY NO-MOV MOV TRIP SPS
63 …KV XXXXXX BAY NO FSC BAY NO-PROT PROTECTION SYSTEM FAIL-1 SPS
64 …KV XXXXXX BAY NO FSC BAY NO-PROT PROTECTION SYSTEM FAIL-2 SPS
65 …KV XXXXXX BAY NO FSC BAY NO-PROT SIGNAL TRANSMISSION POWER FAIL SPS
66 …KV XXXXXX BAY NO FSC BAY NO-PROT MASTER TRIP SPS
67 …KV XXXXXX BAY NO FSC BAY NO-PROT GPS TIME SYNC FAIL SPS
68 …KV XXXXXX BAY NO FSC BAY NO-PROT DIRECT TRIP RECEIVE SPS
69 …KV XXXXXX BAY NO FSC BAY NO-PROT COMMUNICATION CHANNEL FAIL SPS
70 …KV XXXXXX BAY NO FSC BAY NO-89DS2 BYPASS CAP ISO 2 OPERATION INTERLOCK SPS
71 …KV XXXXXX BAY NO FSC BAY NO-PROT MASTER TRIP RST SPC
72 …KV XXXXXX BAY NO FSC BAY NO-PROT MOV FAIL SPS COMMON- R-PH,Y-PH,B-PH
73 …KV XXXXXX BAY NO FSC BAY NO-PROT KIOSK TEMP AI
74 …KV XXXXXX BAY NO FSC BAY NO-PROT CONTROL SYSTEM 1 HARDWARE ALARM SPS Group Alarm
75 …KV XXXXXX BAY NO FSC BAY NO-PROT PROTECTION SYSTEM 1 HARDWARE ALARM SPS Group Alarm
76 …KV XXXXXX BAY NO FSC BAY NO-PROT CONTROL & PROTECTION SYSTEM 1 COMMUNICATION FAULT SPS Group Alarm
77 …KV XXXXXX BAY NO FSC BAY NO-PROT PROTECTION SYSTEM 1 MEASURING SYSTEM WARNING SPS Group Alarm
78 …KV XXXXXX BAY NO FSC BAY NO-PROT CONTROL SYSTEM 2 HARDWARE ALARM SPS Group Alarm
79 …KV XXXXXX BAY NO FSC BAY NO-PROT PROTECTION SYSTEM 2 HARDWARE ALARM SPS Group Alarm
80 …KV XXXXXX BAY NO FSC BAY NO-PROT CONTROL & PROTECTION SYSTEM 2 COMMUNICATION FAULT SPS Group Alarm
81 …KV XXXXXX BAY NO FSC BAY NO-PROT PROTECTION SYSTEM 2 MEASURING SYSTEM WARNING SPS Group Alarm
82 …KV XXXXXX BAY NO FSC BAY NO-PROT CONTROL & PROTECTION SYSTEM POWER SUPPLY ALARM SPS Group Alarm
83 …KV XXXXXX BAY NO FSC BAY NO-PROT CONTROL & PROTECTION SYSTEM REDUNDANCY DISTURBED SPS Group Alarm
84 …KV XXXXXX BAY NO FSC BAY NO-PROT EARTH SWITCH 1 ALARM SPS Group Alarm
85 …KV XXXXXX BAY NO FSC BAY NO-PROT EARTH SWITCH 2 ALARM SPS Group Alarm
86 …KV XXXXXX BAY NO FSC BAY NO-PROT DISCONNECTOR SWITCH 1 ALARM SPS Group Alarm
87 …KV XXXXXX BAY NO FSC BAY NO-PROT DISCONNECTOR SWITCH 2 ALARM SPS Group Alarm
88 …KV XXXXXX BAY NO FSC BAY NO-PROT LINE EARTH SWITCH ALARM SPS Group Alarm
89 …KV XXXXXX BAY NO FSC BAY NO-PROT BYPASS BREAKER ALARM SPS Group Alarm
90 …KV XXXXXX BAY NO FSC BAY NO-PROT MAIN BYPASS SWITCH ALARM SPS Group Alarm
91 …KV XXXXXX BAY NO FSC BAY NO-PROT LINE SIDE 1: DE-ENERGIZED SPS
92 …KV XXXXXX BAY NO FSC BAY NO-PROT LINE SIDE 2: DE-ENERGIZED SPS
93 …KV XXXXXX BAY NO FSC BAY NO-52BBR BYPASS BREAKER LOCAL/REMOTE CONTROL SPS
94 …KV XXXXXX BAY NO FSC BAY NO-52BBR BYPASS BREAKER MAIN CLOSING COIL UNHEALTHY SPS
95 …KV XXXXXX BAY NO FSC BAY NO-52BBR BYPASS BREAKER BACKUP CLOSING COIL UNHEALTHY SPS
96 …KV XXXXXX BAY NO FSC BAY NO-PROT FIRE FIGHTING SYSTEM: ALARM SPS
97 …KV XXXXXX BAY NO FSC BAY NO-PROT-1 SYSTEM 1: MOV OVERLOAD SPS
98 …KV XXXXXX BAY NO FSC BAY NO-PROT-1 SYSTEM 1: MOV TEMPERATURE TRIP SPS
99 …KV XXXXXX BAY NO FSC BAY NO-PROT-1 SYSTEM 1: MOV TEMPERATURE GRADIENT LOW SET SPS
100 …KV XXXXXX BAY NO FSC BAY NO-PROT-1 SYSTEM 1: MOV TEMPERATURE GRADIENT HIGH SET SPS
101 …KV XXXXXX BAY NO FSC BAY NO-PROT-1 SYSTEM 1: MOV UNBALANCE SPS
102 …KV XXXXXX BAY NO FSC BAY NO-PROT-1 SYSTEM 1: MOV HIGH CURRENT SPS
103 …KV XXXXXX BAY NO FSC BAY NO-PROT-1 SYSTEM 1: SPARK GAP FAILED TO TRIGGER SPS
104 …KV XXXXXX BAY NO FSC BAY NO-PROT-1 SYSTEM 1: SPARK GAP DELAYED TRIGGER SPS
105 …KV XXXXXX BAY NO FSC BAY NO-PROT-1 SYSTEM 1: SPARK GAP PROLONGED CONDUCTION SPS
106 …KV XXXXXX BAY NO FSC BAY NO-PROT-1 SYSTEM 1: SPARK GAP SELF TRIGGER SPS
107 …KV XXXXXX BAY NO FSC BAY NO-PROT-1 SYSTEM 1: SPARK GAP TRIGGER (R,Y,B) SPS R,Y,B Phase to be combined
108 …KV XXXXXX BAY NO FSC BAY NO-PROT-1 SYSTEM 1: BYPASS BREAKER FAIL SPS
109 …KV XXXXXX BAY NO FSC BAY NO-PROT-1 SYSTEM 1: PREVENT REINSERTION ACTIVE SPS
110 …KV XXXXXX BAY NO FSC BAY NO-PROT-1 SYSTEM 1: PERMANENT BYPASS SPS
111 …KV XXXXXX BAY NO FSC BAY NO-PROT-1 SYSTEM 1: TEMPORARY BYPASS PHASE(R,Y,B) SPS R,Y,B Phase to be combined
112 …KV XXXXXX BAY NO FSC BAY NO-PROT-1 SYSTEM 1: REINSERTION SPS
113 …KV XXXXXX BAY NO FSC BAY NO-PROT-1 SYSTEM 1: LINE TRIP SPS
114 …KV XXXXXX BAY NO FSC BAY NO-PROT-2 SYSTEM 2: MOV OVERLOAD SPS
115 …KV XXXXXX BAY NO FSC BAY NO-PROT-2 SYSTEM 2: MOV TEMPERATURE TRIP SPS
116 …KV XXXXXX BAY NO FSC BAY NO-PROT-2 SYSTEM 2: MOV TEMPERATURE GRADIENT LOW SET SPS
117 …KV XXXXXX BAY NO FSC BAY NO-PROT-2 SYSTEM 2: MOV TEMPERATURE GRADIENT HIGH SET SPS
118 …KV XXXXXX BAY NO FSC BAY NO-PROT-2 SYSTEM 2: MOV UNBALANCE SPS
119 …KV XXXXXX BAY NO FSC BAY NO-PROT-2 SYSTEM 2: MOV HIGH CURRENT SPS
120 …KV XXXXXX BAY NO FSC BAY NO-PROT-2 SYSTEM 2: SPARK GAP FAILED TO TRIGGER SPS
121 …KV XXXXXX BAY NO FSC BAY NO-PROT-2 SYSTEM 2: SPARK GAP DELAYED TRIGGER SPS
122 …KV XXXXXX BAY NO FSC BAY NO-PROT-2 SYSTEM 2: SPARK GAP PROLONGED CONDUCTION SPS
123 …KV XXXXXX BAY NO FSC BAY NO-PROT-2 SYSTEM 2: SPARK GAP SELF TRIGGER SPS
124 …KV XXXXXX BAY NO FSC BAY NO-PROT-2 SYSTEM 2: SPARK GAP TRIGGER (R,Y,B) SPS R,Y,B Phase to be combined
125 …KV XXXXXX BAY NO FSC BAY NO-PROT-2 SYSTEM 2: BYPASS BREAKER FAIL SPS
126 …KV XXXXXX BAY NO FSC BAY NO-PROT-2 SYSTEM 2: PREVENT REINSERTION ACTIVE SPS
127 …KV XXXXXX BAY NO FSC BAY NO-PROT-2 SYSTEM 2: PERMANENT BYPASS SPS
128 …KV XXXXXX BAY NO FSC BAY NO-PROT-2 SYSTEM 2: TEMPORARY BYPASS PHASE(R,Y,B) SPS R,Y,B Phase to be combined
129 …KV XXXXXX BAY NO FSC BAY NO-PROT-2 SYSTEM 2: REINSERTION SPS
130 …KV XXXXXX BAY NO FSC BAY NO-PROT-2 SYSTEM 2: LINE TRIP SPS
Name of Package : Upgradation of HMI PC and NTAMC integration of SIEMENS make FSC at Ballabhgarh & Meerut Sub-Stations
Tender Enquiry No. : N1/C&M/20-21/AM/OT/117 (Rfx number: 5002001511)
Completion Period : 8 Months
Contracts & Materials dept.
Power Grid Corporation of India Ltd.,
Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
: Attachments : General guidelines for filling up the Attachments
Upgradation of HMI PC and NTAMC integration of SIEMENS make FSC at Ballabhgarh & Meerut Sub-Stations
Specification No.: N1/C&M/20-21/AM/OT/117 (Rfx number: 5002001511)
1 Fill up only green shaded cells in the relevent attachments.
2 Attachments 3(JV), 3(QR), Attach QR, 4, 4(A), 4(B), 5, 6, 7, 9, 10, 11, 12, 13,14, 14-IP, 15, 16, 17, 19, 20 and Bid Form for 1st Envelope are included here.
3 Attachment 1 Bid Security : To be submitted as perproforma provided in the bidding document.
4 Attachment 2 Power of Attorney : No specific format is provided by POWERGRID. Bidder may use their own format.
5 Attachment 8 Manufacturer’s Authorisation Form : To be furnished as per proforma provided in the bidding document, on the letter head of the each Manufactures proposed to supply main items. Not included here.
6 Attachment 18 Safety Pact : To be submitted as per ITB Clause No. 9.3(s) and as per remarks in the safety pact.
7 Attachment-21 to 25: To be submitted as perproforma provided in the bidding document.
Note : Enable the Active X Control & Macros. Also ensure to keep option of "Trust acess to VBA project object Model" cheched [√]. Ensure that you work on MS Excel 2007 or higher version.
पावर ग्रिड कारपोरेशन ऑफ इण्डिया लिमिटेड
(भारत सरकार का उद्यम)
Power Grid Corporation of India Limited
(A Government of India Enterprises)
Upgradation of HMI PC and NTAMC integration of SIEMENS make FSC at Ballabhgarh & Meerut Sub-Stations
Tender Enquiry No. :N1/C&M/20-21/AM/OT/117 (Rfx number: 5002001511) Sole Bidder 1
JV (Joint Venture) 2 or More
Whether Bidder is MSE [Select from drop down menu] 0
Whether Bidder is ‘Class-I local supplier’ or ‘Class-II local supplier’ as defined under Public Procurement (Preference to Make in India) Order, 2017 issued by Department for promotion of Industry and Internal Trade (DPIIT), Ministry of Commerce and Industry, Government of India vide order dated 15/06/2017, its revision dated 04/06/2020 (PPP-MII Order) read in conjunction with ‘Public Procurement (Preference to Make in India) to provide for Purchase Preference (linked with local content) in respect of Power Sector’ order dated 28/07/2020 issued by Ministry of Power (MoP Order) and subsequent modifications/amendments if any. [Select from drop down menu] YES 1
You are eligible to participate in tendering for subject package 0
Specify type of Bidder [Select from drop down menu] SOLE BIDDER SOLE BIDDER 1 0
1 JOINT VENTURE (JV)
Name of Sole Bidder
Address of Sole Bidder
Address of other Partner
Name of other Partner - 2 (More, if any)
Address of other Partner - 2 (More, if any) …… ……. …….. …… ……. ……..
Any Tower Parts Manufacturer proposed other than the bidder [Yes / No] No
Proposed Tower Parts Manufacturer other than the bidder, if any [Maximum two nos.]
Email Id of contact person
Mobile no. of contact person
NOTE: (In case of JV, all partners of the Joint Venture shall be MSEs to consdier its bid as bid from MSE, JV bidder with at least one non-MSE partner (whether lead or other partner) shall not be eligible for the benefit available to the MSE bidders)
Tender Enquiry No. :N1/C&M/20-21/AM/OT/117 (Rfx number: 5002001511) Attachment-3(JV) SOLE BIDDER 0
Upgradation of HMI PC and NTAMC integration of SIEMENS make FSC at Ballabhgarh & Meerut Sub-Stations
(Joint Venture Agreement and Power of Attorney for Joint Venture*)
Bidder’s Name and Address : To:
Contracts & Materials dept. 1 &
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
This Attachment is Not Applicable
Name(s) and Addresse(s) of other partner(s)
The Joint Venture Agreement (as per the proforma attached at no. 15 in Section-VI, Sample Forms and Procedures, Conditions of Contract, Vol.-I of the Bidding Documents) and Power of Attorney for Joint Venture (as per the proforma attached at no. 14 in Section-VI, Sample Forms and Procedures, Conditions of Contract, Vol.-I of the Bidding Documents) are enclosed herewith.
Date : Printed Name : 0
Place : Designation : 8 Months
Tender Enquiry No. :N1/C&M/20-21/AM/OT/117 (Rfx number: 5002001511) ATTACHMENT-3 (QR)
Upgradation of HMI PC and NTAMC integration of SIEMENS make FSC at Ballabhgarh & Meerut Sub-Stations
(Qualifying Requirement Data)
Bidder’s Name and Address : To:
Contracts & Materials dept.
Name: Power Grid Corporation of India Ltd.,
Address: Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
In support of the Qualification Requirements (QR) for bidders, stipulated in Annexure-A (BDS) of the Section - III (BDS), Volume-I & additional information required as per ITB clause 9.3(c) of the Bidding Documents, we furnish herewith our QR data/details/documents etc., alongwith other information, as follows (The QR stipulations have been reproduced in italics for ready reference, however, in case of any discrepancy the QR as given in BDS shall prevail)
We have submitted our bid as 1
[For details regarding Qualification Requirements of a Joint Venture, please refer para 4.0 below.]
We are furnishing the following details/document in support of Qualifying requirement for the subject package.
A Attached copies of original documents defining :
a) The constitution or legal status;
b) The principal place of business;
c) The place of incorporation (for bidders who are corporations); or the place of registration and the nationality of the Owners (for applicants who are partnerships or individually-owned firms).
B Attached original & copies of the following documents :
a) Written power of attorney of the signatory of the Bid to commit the bidder.
b)** Joint Venture Agreement.
[** To be submitted only in case of Joint Ventures. Strike off in case of individual firms.]
1.0 GENERAL INFORMATION
Bidder is required to provide general information as per the following format.
[Where the Bidder proposes to use named subcontractor(s) for critical components of the works or for work contents in excess of ten (10) percent of the bid price, the following information should also be supplied for the subcontractor(s)].
S No. Particulars For Sole Bidder 1 1
1 Name of the Firm 0
2 Head Office/ Registered Office Address
5 Contact Person
6 Place of Incorporation/ Registration
7 Year of Incorporation/ Registration
8 Nationality of
[Necessary documents to establish legal status of the bidder (all the partners in case of Joint Venture) should be enclosed with the bid].
1.0 TECHNICAL REQUIREMENTS {Reference Annexure-A (BDS)}
The manufacturer(s) whose SCADA is offered along with HMI PC must have been, commissioned/upgraded at any HVDC of 500kV or higher voltage Or for FSC/TCSC/SVC at 400kV or higher voltage class Sub Station, which are in satisfactory operation# for at least two (2) years as on the originally scheduled date of bid opening. # satisfactory operation means certificate issued by the Employer/Utility certifying the operation without any adverse remark. Note: In case bidder is a holding company, the technical experience referred to in clause 1.0 above shall be of that holding company only (i.e. excluding its subsidiary/group companies). In case bidder is a subsidiary of a holding company, the technical experience referred to in clause 1.0 above shall be of that subsidiary company only (i.e. excluding its holding company).
Format for individual firm:
Bidder’s Name : 1
1 Are you manufacturer of ventilation system
2 Name of Contract Undertaken
3 Contract Reference No. & Date of Award
4 Name and Address of the Employer/Utility for whom the Contract was executed by the firm/Partner of a JV
(a)(i) Scope of work executed under the above contract (Tick only whichever is/are applicable)
5 Details/features of the Contract undertaken relevant to the stipulated QR (as in Sl No (i) of 2.1
i) Capacity/ Details of the system
ii) Value of work Rs. in crore
6 Capacity in which the Contract was undertaken (Check One) (Tick whichever is applicable)
7 Date of Completion of Contract
8 Details of documents furnished in the Bid, in support of the aforesaid data/details/information
2.0 FINANCIAL REQUIREMENTS :
For the purpose of this particular bid, bidders shall meet the following minimum criteria:
Financial Position {Reference Annexure-A (BDS)}
a) Net worth for last 3 financial years should be positive.
a) The Minimum Average Annual Turnover* (MAAT) of the bidder for the best three financial years, i.e., Thirty-Six (36) Months out of last five financial years, should not be less than Rs. 179.62 Lakhs. *Annual Gross Revenue from operations/Gross operating income as incorporated in the profit & loss account excluding other Income. In case bidder is a holding company, financial position criteria referred to in clause 2.0 above shall be that of holding company only (i.e. excluding its subsidiary/group companies). In case bidder is a subsidiary of a holding company, financial position criteria referred to in clause 2.0 above shall be that of subsidiary company only (i.e. excluding its holding company). The bidder shall submit documentary evidence in support of meeting the qualification criteria as specified above.
Note: Relaxation for MSEs/ STARTUPs: MSEs*/ START-Ups** shall also be considered qualified if they meet 80% (Eighty percent) of the requirements specified at para 2 (a) above. *MSEs as defined in bidding documents **START-UPs as defined by DIPP, applicable as on the originally scheduled date of bid opening. Notwithstanding anything stated above the Owner reserves the right to assess the bidder's capability and capacity to perform the contract, should the circumstances warrant such assessment in the overall interest of the Owner. Th bidder shall submit complete annual reports together with Audited statement of accounts of the company for last five years of its own (separate) immediately preceding the date of submission of bid.
* Note: (i) Annual total income as incorporated in the profit and loss account except non-recurring income e.g. sale of fixed assets. (ii) In case bidder is a holding company, the financial position criteria referred to in clause above shall be of that holding company only (i.e. excluding its subsidiary /group companies). In case bidder is a subsidiary of a holding company, the financial position criteria referred to in clause above shall be of that subsidiary company only (i.e. excluding it’s holding company).
c) Bidder shall have liquid assets (L.A) or/ and evidence of access to or availability of credit facilities of not less than Indian Rs. 2.23 Crore
Note: In case bidder is a holding company, the Financial Position referred to in clause 1.2 shall be of that holding company only (i.e. excluding its subsidiaries/ group companies). In case bidder is a subsidiary of a holding company, the Financial Position referred to in clause 1.2 shall be of that subsidiary company only (i.e., excluding its holding company).
The bidder shall submit complete annual reports together with Audited statement of accounts of the company for last five years of its own (separate) immediately preceding the date of submission of bid
{In support of its ‘Financial Position’, in line with the above, the Bidder must provide the relevant information in support of the same, along with documentary evidence, in the following format}
4.0 Financial Qualification Data:
Details of documentary evidence submitted in support of Qualification Data
Networth (in Crores)
Sl No Financial Year
Do you have audited results for FY 2018-19 Yes
A Turnover details:
Details of documentary evidence submitted in support of Qualification Data
Turnover (in Crores)
Sl No Financial Year
Average Annual Turnover for best Three Years is
C Liquid Assets
Details of evidence of having Liquid assets (LA)
Details of evidence of access to or availability of credit facilities
4.0 Joint Venture Bids {Reference Annexure-A (BDS)}
a) a) In case a bid is submitted by a Joint Venture (JV) of two or more firms as partners, all the partners of Joint Venture shall meet jointly the Technical experience requirements. The figure of average annual turnover for each of the partners of the JV shall be added together to determine the JV’s compliance with the financial position criteria. However, for a JV to be qualified, the partner(s) of the JV must also meet the following minimum criteria:
(i) (i) The lead partner shall meet, not less than 40% of the financial position criteria given at Part-B above.
(ii) (ii) Each of the other partner(s) shall meet, not less than 25% of the financial position criteria given at Part-B above.
b) In case of Joint Venture, the following conditions shall also apply:
c) (i) In case of successful bid, the specified Form of Agreement shall be signed so as to be legally binding on all partners. (ii) One of the partners shall be nominated as Lead Partner, and this authorization shall be evidenced by submitting a Power of Attorney signed by legally authorized signatories of all the partners. (iii) The Lead Partner shall be authorized to incur liabilities and receive instructions for and on behalf of any and all partners of the Joint Venture, and the entire execution of the Contract, including payment, shall be done exclusively with the Lead Partner as per power conferred to him in the Power of Attorney. (iv) All partners of the Joint Venture shall be liable jointly and severally for the execution of the Contract in accordance with the Contract terms, and a statement to this effect shall be included in the authorization mentioned under (ii) above as well as in the Bid Form and in the Contract Form (in case of a successful bid). (v) Agreement entered into by the Joint Venture partners shall be submitted with the bid.
5.0 The Bidder shall also furnish following documents/details with its bid. {Reference ITB clause 9.3 (c)}
5.1 The complete annual reports together with Audited statement of accounts of the company for last five years of its own (separate) immediately preceding the date of submission of bid.
Note I. In the event the bidder is not able to furnish the information of its own (i.e separate), being a subsidiary company and its accounts are being consolidated with its group/holding/parent company, the bidder should submit the audited balance sheets, income statements, other information pertaining to it only (not of its group/Holding/Parent Company) duly certified by any one of the authority [ (i) Statutory Auditor of the bidder /(ii) Company Secretary of the bidder or (iii) A certified Public Accountant] certifying that such information/documents are based on the audited accounts as the case may be.
II. Similarly, if the bidder happens to be a Group/Holding/Parent Company, the bidder should submit the above documents/information of its own (i.e. exclusive of its subsidiaries) duly certified by any one of the authority mentioned in Note-I above certifying that these information/documents are based on the audited accounts, as the case may be.
5.2 The Bidder should accordingly also provide the following information/documents
Audited balance sheet and income statements for the last five years as per the following:
A Years preceding to the bid opening Audited Balance Sheet and Income Statements enclosed Audited Balance Sheet and Income Statements enclosed
Date : 00-Jan-00 Printed Name : 0
Place : 00-Jan-00 Designation : 0
Tender Enquiry No. :N1/C&M/20-21/AM/OT/117 (Rfx number: 5002001511) Attachment-4
Upgradation of HMI PC and NTAMC integration of SIEMENS make FSC at Ballabhgarh & Meerut Sub-Stations
(Form of Certificate of Origin and Eligibility)
Bidder’s Name and Address : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
We hereby certify that equipment and materials to be supplied are produced in [Name of Countries], eligible source country. Equipments & Materials produced in [Name of countries] Company incorporated & registered in [Name of countries]
We hereby certify that our company is incorporated and registered in [Name of Countries], eligible source country. [Name of Countries] [Name of Countries] [Name of Countries], [Name of Countries],
Date : Printed Name :
Place : Designation :
country. country. [Name of Countries], [Name of Countries],
Tender Enquiry No. :N1/C&M/20-21/AM/OT/117 (Rfx number: 5002001511) Attachment-4(A)
Upgradation of HMI PC and NTAMC integration of SIEMENS make FSC at Ballabhgarh & Meerut Sub-Stations
(List of Special Maintenance Tools & Tackles)
Bidder’s Name and Address : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
We are furnishing below the list of special maintenance tools & tackles for various equipment under the subject package. The prices for these tools & tackles are included in our lumpsum bid price. We further confirm that the list of special maintenance tools & tackles includes all the items specifically identified in your bidding documents as brought out below:
S.No. For Equipment Item Description Unit Quantity
Notwithstanding what is stated above, we further confirm that any additional special maintenance tools and tackles, required for the equipment under this package shall be furnished by us at no extra cost to the employer.
Date : Printed Name :
Place : Designation :
Tender Enquiry No. :N1/C&M/20-21/AM/OT/117 (Rfx number: 5002001511) Attachment-4(B)
Upgradation of HMI PC and NTAMC integration of SIEMENS make FSC at Ballabhgarh & Meerut Sub-Stations
(List of Special Maintenance Tools & Tackles)
Bidder’s Name and Address : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
We are furnishing below the list of special maintenance tools & tackles for various equipment under the subject package. The prices for these tools & tackles which are to be taken back after the completion of the work by us are not included in our lumpsum bid price. We further confirm that the list of special maintenance tools & tackles includes all the items specifically identified in your bidding documents as brought out below:
Date : Printed Name :
Place : Designation :
Tender Enquiry No. :N1/C&M/20-21/AM/OT/117 (Rfx number: 5002001511) Attachment-5
Upgradation of HMI PC and NTAMC integration of SIEMENS make FSC at Ballabhgarh & Meerut Sub-Stations
(Bought-out & Sub-contracted Items)
Bidder’s Name and Address : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
1.We hereby furnish the details of the items/ sub-assemblies (supply items), we propose to buy for the purpose of furnishing and installation of the subject Package :
Sl. No. Item Description Quantity proposed to be bought/sub-contracted Details of the proposed sub-contractor/sub-vendor
2. We hereby delare that we would not subcontract the erection portion of the contract without prior approval of the Employer.
Date : Printed Name :
Place : Designation :
Tender Enquiry No. :N1/C&M/20-21/AM/OT/117 (Rfx number: 5002001511) Attachment-5A
Upgradation of HMI PC and NTAMC integration of SIEMENS make FSC at Ballabhgarh & Meerut Sub-Stations
(Items, Components, Raw Material, Services proposed to be sourced from Micro and Small Enterprises)
Bidder’s Name and Address : To:
Name : Contracts & Materials dept.
Address : Power Grid Corporation of India Ltd.,
Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
1. We hereby furnish the details of the items, components, raw material, services which we propose to buy/avail from Micro and Small Enterprises (MSEs) for the purpose of completion of works under the subject package :
Sl. No. Item Description Quantity proposed to be bought/sub-contracted Name of Micro and Small Enterprises (MSEs)
Name & Address Category (Micro or Small)
2. 2. The above is a list of items we propose to procure from MSEs. However, based on the situations during the execution of the contract, the above list may undergo changes. We hereby confirm that the details regarding actual procurement from MSEs carried out by us, as per the format provided at Section VI, Forms and Procedures, Volume-I of bidding documents, shall be submitted along with the bills for payment against supplies made/works done during execution of contract.
Date : Printed Name :
Place : Designation :
Tender Enquiry No. :N1/C&M/20-21/AM/OT/117 (Rfx number: 5002001511) Attachment-6
Upgradation of HMI PC and NTAMC integration of SIEMENS make FSC at Ballabhgarh & Meerut Sub-Stations
(Alternative, Deviations and Exceptions to the Provisions)
Bidder’s Name and Address : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
The bidder shall itemize any deviation from the Specifications included in his bid. Each item shall be listed (separate sheets may be used and enclosed with this Attachment) with the following information:
Sl. No. Reference clause in the Specifications Deviation Cost of withdrawal of the deviation
The above deviations and variations are exhaustive. We confirm that we shall withdraw the deviations proposed by us at the cost of withdrawal indicated in this attachment, failing which our bid may be rejected and Bid Security forfeited.
Date : Printed Name :
Place : Designation :
Tender Enquiry No. :N1/C&M/20-21/AM/OT/117 (Rfx number: 5002001511) Annexure I toAttachment-6
(Alternative, Deviations and Exceptions to the Provisions)
Sl. No. Reference clause in the Specifications Deviation Cost of withdrawal of the deviation
Date : Printed Name :
Place : Designation :
Tender Enquiry No. :N1/C&M/20-21/AM/OT/117 (Rfx number: 5002001511) Attachment-7
Upgradation of HMI PC and NTAMC integration of SIEMENS make FSC at Ballabhgarh & Meerut Sub-Stations
(Details of Alternative Bid)
Bidder’s Name and Address : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
No Alternative Bid
Date : Printed Name :
Place : Designation :
Tender Enquiry No. :N1/C&M/20-21/AM/OT/117 (Rfx number: 5002001511) Attachment-9
Upgradation of HMI PC and NTAMC integration of SIEMENS make FSC at Ballabhgarh & Meerut Sub-Stations
(Work Completion Schedule)
Bidder’s Name and Address : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
We hereby declare that the following Work Completion Schedule shall be followed by us in furnishing and installation of the subject Package i.e., for the period commencing from the effective date of Contract to us.
We confirm that materials will be supplied as per the time limit agreed at the time of contract.
Sl. No. Description of Work Period in months from the effective date of contract
1 Manufacturing
a) commencement
b) completion We confirm that the scope under subject tender shall be completed within the completion schedule specified in the bidding documents
2 Shipments & Delivery
a) commencement
b) completion We confirm that the scope under subject tender shall be completed within the completion schedule specified in the bidding documents
Date : Printed Name :
Place : Designation :
Note : Bidders to enclose a detailed network covering all the activities to be undertaken for completion of the project indicating key dates for various milestones for each phase constituent-wise.
Tender Enquiry No. :N1/C&M/20-21/AM/OT/117 (Rfx number: 5002001511) Attachment-10
Upgradation of HMI PC and NTAMC integration of SIEMENS make FSC at Ballabhgarh & Meerut Sub-Stations
(Guarantee Declaration)
Bidder’s Name and Address : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
We conform that the equipments offered shall have minimum (or a muximum, as the case may be) performance specified in Technical Specification. We further guarantee the performance/efficiency of the equipments in response to the Technical Specifications.
Date : Printed Name :
Place : Designation :
Tender Enquiry No. :N1/C&M/20-21/AM/OT/117 (Rfx number: 5002001511) Attachment-11
Upgradation of HMI PC and NTAMC integration of SIEMENS make FSC at Ballabhgarh & Meerut Sub-Stations
(Information regarding Ex-employees of POWERGRID in our Organisation)
Bidder’s Name and Address : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
We declare that we are aware of and have gone through the “Code of Business Conduct and Ethics for Senior Management Personnel”1 and “Code of Business Conduct and Ethics for Board Members”1 of POWERGRID (hereinafter referred to as the “Code of Conduct”). We further understand that as per the “Code of Conduct”, Senior Management Personnel including Board Members, who have retired/resigned from POWERGRID, shall not accept any appointment or post, as detailed in the referred “Code of Conduct”, within 1 year from the date of cessation of service/directorship unless approved by the Competent Authority. Accordingly,We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
*In case the date of joining in the bidder’s organization of such ex-employee is within 1 year from the date of retirement/resignation from POWERGRID, No Objection Certificate/ approval from the Competent Authority must be furnished along with the bid or subsequent through clarification pursuant to ITB Clause 21.
In case of non-submission of No Objection Certificate/approval of the Competent Authority, as required, We understand that POWERGRID shall deal with such cases as per its Policy and procedures in vogue, which may also result in rejection of our bid. We also confirm that POWERGRID shall be the sole judge in this regard. We further declare that any misrepresentation or submission of false/forged documents/information in this regard shall be dealt with as per the provisions of the Integrity Pact and/or the Bidding Documents and/or POWERGRID’s policy and procedures.
Date : Printed Name :
Place : Designation :
Note: 1. “Code of Business Conduct and Ethics for Senior Management Personnel” and “Code of Business Conduct and Ethics for Board Members” are available on POWERGRID’s website https://www.powergridindia.com. 2. The information in similar format should be furnished for each partner of joint venture in case of joint venture bid. 3. In case bidder has furnished no details on ex-employees of POWERGRID or has left blank or has indicated ‘-‘ against the same, it shall be deemed that they have not employed any such person in their organization.
Tender Enquiry No. :N1/C&M/20-21/AM/OT/117 (Rfx number: 5002001511) Attachment-11
Upgradation of HMI PC and NTAMC integration of SIEMENS make FSC at Ballabhgarh & Meerut Sub-Stations
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : Printed Name :
Place : Designation :
Tender Enquiry No. :N1/C&M/20-21/AM/OT/117 (Rfx number: 5002001511) Attachment-11
Upgradation of HMI PC and NTAMC integration of SIEMENS make FSC at Ballabhgarh & Meerut Sub-Stations
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : Printed Name :
Place : Designation :
Tender Enquiry No. :N1/C&M/20-21/AM/OT/117 (Rfx number: 5002001511) Attachment-12
Upgradation of HMI PC and NTAMC integration of SIEMENS make FSC at Ballabhgarh & Meerut Sub-Stations
(Price Adjustment Data)
Bidder’s Name and Address : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
We hereby furnish the relevant details pertaining to the price adjustment provisions for equipment as specified in your specifications and documents for the Upgradation of HMI PC and NTAMC integration of SIEMENS make FSC at Ballabhgarh & Meerut Sub-Stations. The necessary documentary evidence are enclosed.
Prices remain Firms and Fixed
Date : Printed Name :
Place : Designation :
Tender Enquiry No. :N1/C&M/20-21/AM/OT/117 (Rfx number: 5002001511) Attachment-13
Upgradation of HMI PC and NTAMC integration of SIEMENS make FSC at Ballabhgarh & Meerut Sub-Stations
(Declaration regarding Social Accountability)
Bidder’s Name and Address : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
We conform that we stand committed to comply to all requirements of Social Accountability Standards i.e., SA8000 (latest Standard available at www.sa-intl.org) and maintain the necessary records.
Date : Printed Name :
Place : Designation :
Tender Enquiry No. :N1/C&M/20-21/AM/OT/117 (Rfx number: 5002001511) Attachment-14
Upgradation of HMI PC and NTAMC integration of SIEMENS make FSC at Ballabhgarh & Meerut Sub-Stations
Bidder’s Name and Address : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
Integrity Pact is annexed separately herewith this Volume.
Date : Printed Name :
Place : Designation :
Instruction for printing & submitting Integrity Pact
1. The requisite format of Integrity Pact is getting generated automatically and displayed here below.
2. Take print out of first page on a non-judicial stamp paper of Rs. 100/- and other seven pages on plain A4 size paper. Such two sets shall be prepared by the bidder.
3. All the pages of both the copies of the Integrity Pact shall be signed by the authorised representative of the bidder and duly stamped.
4. Both the original copies shall be submitted by the bidder in the form of Hard Copy as part of the first envelope before due date & time of submission of the bid.
5. For further details bidders may please refer ITB Clause 9.3 (n).
Power Grid Corporation of India Limited
having its Registered Office at B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi – 110016 hereinafter referred to as
having its Registered Office at
hereinafter referred to as
"The Bidder/Contractor"
POWERGRID intends to award, under laid-down organisational procedures, contract(s) for Upgradation of HMI PC and NTAMC integration of SIEMENS make FSC at Ballabhgarh & Meerut Sub-Stations
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of
Integrity Pact Page 1 of 8
Upgradation of HMI PC and NTAMC integration of SIEMENS make FSC at Ballabhgarh & Meerut Sub-Stations Package and Specification Number N1/C&M/20-21/AM/OT/117 (Rfx number: 5002001511)
POWERGRID values full compliance with all relevant laws and regulations, and the principles of economical use of resources, and of fairness and transparency in its relations with its Bidders/ Contractors."
In order to achieve these goals, POWERGRID and the above named Bidder/Contractor enter into this agreement called 'Integrity Pact' which will form a part of the bid.
It is hereby agreed by and between the parties as under:
Section I - Commitments of POWERGRID
(1) POWERGRID commits itself to take all measures necessary to prevent corruption and to observe the following principles
(a) No employee of POWERGRID, personally or through family members, will in connection with the tender, or the execution of the contract, demand, take a promise for or accept, for him/herself or third person, any material or other benefit which he/she is not legally entitled to
(b) POWERGRID will, during the tender process treat all Bidder(s) with equity, fairness and reason. POWERGRID will in particular, before and during the tender process, provide to all Bidder(s) the same information and will not provide to any Bidder(s) confidential/ additional information through which the Bidder(s) could obtain an advantage in relation to the tender process or the contract execution
(c) POWERGRID will exclude from evaluation of Bids its such employee(s) who has any personal interest in the Companies/Agencies participating in the Bidding/Tendering process and all known prejudiced persons
(2) If POWERGRID obtains information on the conduct of any of its employee which is a criminal offence under the IPC / PC Act , or if there be a substantive suspicion in this regard, POWERGRID will inform its Chief Vigilance Officer and in addition disciplinary actions can be initiated under POWERGRID’s Rules
Section II - Commitments of the Bidder/Contractor
(1) The Bidder/Contractor commits itself to take all measures necessary to prevent corruption. The Bidder/Contractor commits itself to observe the following principles during its participation in the tender process and during the contract execution:
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of
Integrity Pact Page 2 of 8
(a) The Bidder/Contractor will not, directly or through any other person or firm, offer, promise or give to any of POWERGRID's employees involved in the tender process or the execution of the contract or to any third person any material or other benefit which it is not legally entitled to, in order to obtain in exchange an advantage of any kind whatsoever during the tender process or during the execution of the contract
(b) The Bidder/Contractor will not enter into any illegal or undisclosed agreement or understanding, whether formal or informal with other Bidders/Contractors. This applies in particular to prices, specifications, certifications, subsidiary contracts, submission or non-submission of bids or actions to restrict competitiveness or to introduce cartelization in the bidding process.
(c ) The Bidder/Contractor shall not pass any information provided by POWERGRID as part of business relationship to others and shall not commit any offence under PC / IPC Act.
(d) The Bidder/Contractor of foreign origin shall disclose the name and address of the Agents/representatives in India, if any, involved directly or indirectly in the Bidding. Similarly, the Bidder/Contractor of Indian Nationality shall furnish the name and address of the foreign principals, if any, involved directly or indirectly in the Bidding.
(e ) The Bidder/Contractor will, when presenting his bid, disclose any and all payments made, or committed to or intends to make to agents, brokers or any other intermediaries in connection with the award of the contract and/or with the execution of the contract.
(f) The Bidder/Contractor will not misrepresent facts or furnish false/forged documents/information in order to influence the bidding process or the execution of the contract to the detriment of POWERGRID
(g) The Bidder/Contractor shall ensure adoption of Integrity Pact by its Sub-contractors and shall be responsible for the same
(2) The Bidder/Contractor will not instigate third persons to commit offences outlined above or be an accessory to such offences
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of
Integrity Pact Page 3 of 8
Section III- Disqualification from tender process and exclusion from future contracts
(1) If the Bidder, before contract award, has committed a transgression through a violation of Section II or in any other form such as to put his reliability or credibility as Bidder into question, POWERGRID may disqualify the Bidder from the tender process or terminate the contract, if already signed, for such reason
(2) If the Bidder/Contractor has committed a transgression through a violation of Section II such as to put his reliability or credibility into question, POWERGRID may, after following due procedures, ban /blacklist the Bidder/Contractor in line with POWERGRID’s policy for “Black-Listing of Firms / Banning of Business”. The imposition and duration of the ban will be determined by the severity of the transgression. The severity will be determined by the circumstances of the case, in particular the number of transgressions, the position of the transgressors within the company hierarchy of the Bidder/Contractor and the amount of the damage. The ban will be imposed for a maximum of 3 years.
(3) If the Bidder/Contractor can prove that he has restored/recouped the damage caused by him and has installed a suitable corruption prevention system, POWERGRID may revoke the ban prematurely.
Section IV - Liability for violation of Integrity Pact
(1) If POWERGRID has disqualified the Bidder from the tender process prior to the award under Section III, POWERGRID is entitled for forfeiture of the Bid Guarantee under the Bid
(2) If POWERGRID has terminated the contract under Section III or if POWERGRID is entitled to terminate the contract under Section III, POWERGRID shall be entitled to forfeit the Contract Performance Guarantee of this contract, in full or part thereof as may be decided, besides resorting to other remedies under the contract.
Section V- Previous Transgression
(1) The Bidder shall disclose in its Bid any transgressions occurred in the last 10 years with any other Public Sector Undertaking or Government Department or any other Company, in any country, that may impinge on the Anti-corruption principle
(2) If the Bidder makes incorrect statement on this subject, it can be disqualified from the tender process or the contract, if already awarded, can be terminated for such reason and further action can be taken in line with POWERGRID’s policies.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of
Integrity Pact Page 4 of 8
Section VI - Equal treatment to all Bidders / Contractors
(1) POWERGRID will enter into agreements with identical conditions as this one with all Bidders.
(2) POWERGRID will disqualify from the tender process any bidder who does not sign this Pact or violate its provisions.
Section VII - Punitive Action against violating Bidders / Contractors
If POWERGRID obtains knowledge of conduct of a Bidder or a Contractor or its subcontractor or of an employee or a representative or an associate of a Bidder or Contractor or his Subcontractor which constitutes corruption, or if POWERGRID has substantive suspicion in this regard, POWERGRID will inform the Chief Vigilance Officer (CVO).
(*)Section VIII - Independent External Monitor/Monitors
(1) POWERGRID has appointed a panel of Independent External Monitors (IEMs) for this Pact with the approval of Central Vigilance Commission (CVC), Government of India. The names of the IEMs have been indicated in the Bidding Documents.
(2) The panel of IEMs shall review independently and objectively, whether and to what extent the parties comply with the obligations under this agreement. The panel of IEMs has right of access to all project documentation. The panel of IEMs may examine any complaint received by them and submit a report to Chairman-cum-Managing Director, POWERGRID, giving joint findings, at the earliest. The panel of IEMs may also submit a report directly to the CVO and the CVC, in case of suspicion of serious irregularities attracting the provisions of the PC Act.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of
Integrity Pact Page 5 of 8
(3) The IEM is not subject to instructions by the representatives of the parties and performs his functions neutrally and independently. He / She reports to the Chairman-cum-Managing Director, POWERGRID.
(4) The Bidder(s)/Contractor(s) accepts that the IEM has the right to access without restriction to all documentation of POWERGRID related to this contract including that provided by the Contractor/Bidder. The Bidder/Contractor will also grant the IEM, upon his / her request and demonstration of a valid interest, unrestricted and unconditional access to their documentation. The same is applicable to Subcontractors. The IEM is under contractual obligation to treat the information and documents of the Bidder(s)/Contractor(s)/Subcontractor(s) with confidentiality.
(5) POWERGRID will provide to the IEMs information as sought by him / her which could have an impact on the contractual relations between POWERGRID and the Bidder/Contractor related to this contract. The IEMs shall also sign declaration on ’Non-Disclosure of Confidential Information’ and of ‘Absence of Conflict of Interest’. In case of any conflict of interest arising at a later date, the IEM shall inform Chairman-cum-Managing Director, POWERGRID and recuse himself/herself from that case
(6) As soon as the IEM notices, or believes to notice, a violation of this agreement, he / she will so inform the Chairman-cum-Managing Director, POWERGRID and request the Chairman-cum-Managing Director, POWERGRID to discontinue or take corrective action, or to take other relevant action. The IEM can in this regard submit non-binding recommendations. Beyond this, the IEM has no right to demand from the parties that they act in a specific manner, refrain from action or tolerate action. However, the IEM shall give an opportunity to POWERGRID and the Bidder/Contractor, as deemed fit, to present its case before making its recommendations to POWERGRID
(7) The IEM will submit a written report to the Chairman-cum-Managing Director, POWERGRID within 8 to 10 weeks from the date of reference or intimation to him by POWERGRID and, should the occasion arise, submit proposals for correcting problematic situations
(8) If the IEM has reported to the Chairman-cum-Managing Director, POWERGRID, a substantiated suspicion of an offence under PC / IPC Act, and the Chairman-cum-Managing Director, POWERGRID has not, within the reasonable time taken visible action to proceed against such offence or reported it to the CVO, the Monitor may also transmit this information directly to the CVC, Government of India.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of
Integrity Pact Page 6 of 8
(9) While representing any matter in relation to the Integrity pact inter-alia including its transgression to the panel of IEMs, POWERGRID and Bidder/Contractor shall not approach the court of law and await the decision of the IEM in the matter
(10) The word ‘IEM’ would include both singular and plural
(*) This Section shall be applicable for only those packages wherein the IEMs have been identified in Section – I : Invitation for Bids and/or Clause ITB 9.3 in Section – III: Bid Data Sheets of Conditions of Contract, Volume-I of the Bidding Documents
Section IX - Pact Duration
This Pact begins when both parties have legally signed it. It expires for the Contractor after the closure of the contract and for all other Bidder's six month after the contract has been awarded.
Section X - Other Provisions
(1) This agreement is subject to Indian Law. Place of performance and jurisdiction is the establishment of POWERGRID. The Arbitration clause provided in the main tender document / contract shall not be applicable for any issue / dispute arising under Integrity Pact.
(2) Changes and supplements as well as termination notices need to be made in writing. Side agreements have not been made.
(3) If the Contractor is a partnership firm or a consortium or Joint Venture, this agreement must be signed by all partners, consortium members and Joint Venture partners.
(4) Nothing in this agreement shall affect the rights of the parties available under the General Conditions of Contract (GCC) and Special Conditions of Contract (SCC).
(5) Issues like Warranty/Guarantees etc. shall be outside the purview of IEMs.
(6) Views expressed or suggestions/submissions made by the parties and the recommendations of the CVO/IEM# in respect of the violation of this agreement, shall not be relied on or introduced as evidence in the arbitral or judicial proceedings (arising out of the arbitral proceedings) by the parties in connection with the disputes/differences arising out of the subject contract.
# CVO shall be applicable for packages wherein IEM are not identified in Section IFB/BDS of Condition of Contract, Volume-I. IEM shall be applicable for packages wherein IEM are identified in Section IFB/BDS of Condition of Contract, Volume-I.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of
Integrity Pact Page 7 of 8
(7) Should one or several provisions of this agreement turn out to be invalid, the remainder of this agreement remains valid. In this case, the parties will strive to come to an agreement to their original intentions.
Signature Signature
(For & On behalf of POWERGRID) (For & On behalf of
(Office Seal) (Office Seal)
Designation : Designation :
Witness 1 : Witness 1 :
Designation : Designation :
Witness 1 : Witness 1 :
Designation : Designation :
Integrity Pact Page 8 of 8
Tender Enquiry No. :N1/C&M/20-21/AM/OT/117 (Rfx number: 5002001511) Attachment-15
Upgradation of HMI PC and NTAMC integration of SIEMENS make FSC at Ballabhgarh & Meerut Sub-Stations
Information for E-payment, PF details and declaration regarding Micro/Small & Medium Enterprises
Bidder’s Name and Address : Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
I We are furnishing the following details of Statutory Registration Numbers and details of Bank for electronic payment.
1. Name of the Supplier/ Contractor in whose favour payment is to be made
2. Address with PIN Code and State
Registered Office:
Correspondence Address:
3.(a) Status – Company/others
[Declaration of Micro/ Small/ Medium Enterprise under Micro/ Small & Medium Enterprises Development Act 2006, if applicable]
3.(b) Are you a MSE owned by SC/ST* entrepreneurs in line with Public Procurement Policy for Micro and Small Enterprises (MSEs) order 2012 including subsequent amendment/notification/order (Indicate Yes/No) 0
3.(c) If 3(b) is ‘Yes’ please mention whether you are (Proprietary MSE/ Partnership MSE/ Private Limited Company) owned by SC/ST entrepreneurs
3.(d) Are you a MSE owned by women in line with Public Procurement Policy for Micro and Small Enterprises (MSEs) order 2012, Public Procurement Policy for Micro and Small Enterprises (MSEs) Amendment Order 2018 including subsequent amendment/notification/order (Indicate Yes/No)
4. Permanent Account (PAN) No.
5. GSTIN Numbers
I. GSTIN in the Sates/UT from where the supply of goods take place
Name of the States/UT GSTIN number
II. GSTIN in the States/UT where the supply for services take place (states where sites under the subject package is situated)
Name of the States/UT GSTIN number
6. PF Registration No. of the Company
7. PF Regional Office covered (with Address)
8. Name of Contact Person
9. Contact Details
10. Bank Details for Electronic Payment
Name of the Bank:
Address of Branch:
Type of Account:
Type of Account: Current Account
11. 9 digit MICR code printed at bottom in middle, next to cheque no.
12. IFSC (for RTGS)/NEFT Code (to be obtained from the Bank) Sample Cancelled Cheque to be enclosed
We hereby declare that the above information are true and correct and we agree that the payment on account of this Contract, in the event of award, be made in the above account maintained in the above mentioned Bank.
*The definition of MSEs owned by SC/ST is as given under:
a. In case of proprietary MSE, proprietor(s) shall be SC /ST.
b. In case of partnership MSE, the SC/ST partners shall be holding at least 51% shares in the unit.
c. In case of Private Limited companies, at least 51% share shall be held by SC/ST promoters.
Documentary evidence: Please provide scanned copy(ies) of the SC/ST certificate(s) issued by District Authority as applicable for SC/ST MSE category as per (a), (b) or (c) above.
Date : Printed Name :
Place : Designation :
Tender Enquiry No. :N1/C&M/20-21/AM/OT/117 (Rfx number: 5002001511) Attachment-16
Upgradation of HMI PC and NTAMC integration of SIEMENS make FSC at Ballabhgarh & Meerut Sub-Stations
(Additional Information)
Bidder’s Name and Address : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
In support of the additional information required as per ITB Sub-Clause 9.3 (p) of the Bidding Documents, we furnish herewith our data/details/documents etc., alongwith other information, as follows (the stipulations have been reproduced in italics for ready reference):
1.0 The Bidder shall furnish
A certificate from their Banker(s) (as per prescribed formats in Form 16, Section-VI: Sample Forms and Procedures) indicating various fund based/non fund based limits sanctioned to the Bidder and the extent of utilization as on date. Such certificate should have been issued not earlier than three months prior to the date of bid opening. Wherever necessary the Employer may make queries with the Bidders’ Bankers. [Reference ITB clause 9.3(p)(i)]
1.1 In accordance with 1.0, certificate(s) from banker as per requisite format, indicating various fund based/non fund based limits sanctioned to the bidder or each member of the joint venture and the extent of utilization as on date is/are enclosed, as per the following details:
Name of the Bidder (Sole Bidder)
Name of the Banker by whom certificate issued
Date of certificate (should not be earlier than 3 months prior to date of bid opening)
Whether fund based/non fund based limits are indicated in the certificate
Whether extent of utilization is indicated in the certificate
1.2 The Bidder should accordingly also provide the following information/documents
(i) Details of Banker:
Address of Banker
Contact Name and Title
(ii) As per para 1.0, Authorization Letter(s) from the bidder (in case of JV bidder, from all the partners) addressed to the Banker(s), authorizing POWERGRID to seek queries about the bidder with the Banker(s) and advising the Banker(s) to reply the same promptly, is/are enclosed as per following details:
Sl. No. Letter Ref. Date Addressed to (name of the Bank)
(iii) As per para BDS/ITB clause 9.3 q, Bidder shall furnish the details of their Provident Fund Code Number
Sl. No. Name of Bidders/JV Partners Provident Fund Code Number Details
2.0 Litigation History
The bidder should provide detailed information on any litigation or arbitration arising out of contracts completed or under execution by it over the last five years. A consistent history of awards involving litigation against the Bidder or any partner of JV may result in rejection of Bid. [Reference ITB clause 9.3(p)(ii)]
2.1 Details of litigation history resulting from Contracts completed or under execution by the bidder over the last five years
Year Name of client, cause of litigation/arbitration and matter in dispute Details of Contract and date Award for or against the bidder Disputed amount
3.0 Details regarding previous transgressions of Integrity Pact
The bidder should provide detailed information on any transgression of Integrity Pact that occurred in the last 10 years with any other Public Sector Undertaking or Government Department or any other Company, in any country.
3.1 Details regarding previous transgressions of Integrity Pact that occurred in the last 10 years
Year Name of client Details of Transgression of Integrity Pact by the bidder
4.0 OTHER INFORMATION
4.1 Current Contract Commitments of works in progress
Bidders (individual firms or each partners of JV) should provide information on their current commitments on all contracts that have been awarded, or for which a letter of intent or acceptance has been received, or for contracts approaching completion, but for which an unqualified, full completion certificate has yet to be issued.
Details of Contract Value of outstanding work (Rs.) Estimated completion date
4.2 Financial Data:
Details Actual (Previous five years) Projection for next five years
Total Liability
Current Liability
Profit before taxes
Profit after taxes
Date : Printed Name :
Place : Designation :
Tender Enquiry No. :N1/C&M/20-21/AM/OT/117 (Rfx number: 5002001511) Attachment-17
Upgradation of HMI PC and NTAMC integration of SIEMENS make FSC at Ballabhgarh & Meerut Sub-Stations
(Declaration for tax exemptions, reductions, allowances or benefits)
Bidder’s Name and Address : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
1 We confirm that we are solely responsible for obtaining following tax exemptions, reductions, allowances or benefits in respect of supplies under the subject package, in case of award. We further confirm that we have considered the same in our bid thereby passing on the benefit to POWERGRID while quoting our prices. In case of our failure to receive such benefits, partly or fully, for any reason whatsoever, the Employer will not compensate us.
2 We are furnishing the following information required by the Employer for issue of requisite certificate if and as permitted in terms of the applicable Govt. of India policies/procedures (in case of award):
Applicable Act, Notification No. and Clause Ref. No. Sl. No. Description of item on which applicable Country of origin Remarks, if any
(The requirements listed above are as per current Notification of Govt. of India indicated above. These may be modified, if necessary, in terms of the Notifications.)
Date : Printed Name :
Place : Designation :
Tender Enquiry No. :N1/C&M/20-21/AM/OT/117 (Rfx number: 5002001511) Attachment-17
Upgradation of HMI PC and NTAMC integration of SIEMENS make FSC at Ballabhgarh & Meerut Sub-Stations
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Contracts & Materials dept.
Name : …… ……. …….. …… ……. …….. Power Grid Corporation of India Ltd.,
Address : …… ……. …….. …… ……. …….. Northern Region–I, Regional Headquarter,
…… ……. …….. …… ……. …….. SCO Bay No. 5 to 10, Sector 16A,
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : Printed Name :
Place : Designation :
Tender Enquiry No. :N1/C&M/20-21/AM/OT/117 (Rfx number: 5002001511) Attachment-17
Upgradation of HMI PC and NTAMC integration of SIEMENS make FSC at Ballabhgarh & Meerut Sub-Stations
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : Printed Name :
Place : Designation :
Tender Enquiry No. :N1/C&M/20-21/AM/OT/117 (Rfx number: 5002001511) Attachment-18
Upgradation of HMI PC and NTAMC integration of SIEMENS make FSC at Ballabhgarh & Meerut Sub-Stations
Bidder’s Name and Address : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
Safety Pact is annexed separately herewith this Volume.
Date : Printed Name :
Place : Designation :
Tender Enquiry No. :N1/C&M/20-21/AM/OT/117 (Rfx number: 5002001511) Attachment-19
Upgradation of HMI PC and NTAMC integration of SIEMENS make FSC at Ballabhgarh & Meerut Sub-Stations
Bidder’s Name and Address : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
Further, we hereby confirm that except as mentioned in the Attachment – 6 (Alternative, Deviations and Exceptions to the Provisions) hereof forming part of our First Envelope :
Date : Printed Name :
Place : Designation :
Tender Enquiry No. :N1/C&M/20-21/AM/OT/117 (Rfx number: 5002001511) Attachment-20
Upgradation of HMI PC and NTAMC integration of SIEMENS make FSC at Ballabhgarh & Meerut Sub-Stations
(Declaration of Key Managerial Person and Power of Attorney holder)
Bidder’s Name and Address : To:
Contracts & Materials dept.
Name : Power Grid Corporation of India Ltd.,
Address : Northern Region–I, Regional Headquarter,
SCO Bay No. 5 to 10, Sector 16A,
Faridabad-121002, Haryana
1. We confirm that the declarations made in our bid, particularly Attachment-3 (QR) regarding eligibility/qualification data and documents submitted in our bid in support of the declarations, are true and correct to the best of our knowledge. 2. We further confirm that we have filled up Attachment-3(QR). We also confirm that in support of meeting the Technical experience requirement as per Annexure-A (BDS), we have enclosed self-certified copy of Contract/ Award Letter and certificate from the utility for which the contract has been executed. 3. We shall furnish clarification to bid, if any sought by Employer pursuant to ITB clause 21.1. We understand that if we fail to rectify/furnish the requested documents if any, within 7 working days’ notice, our bid is liable to be rejected. 4. We understand that any false declaration and/or misrepresentation of facts and/or furnishing of false/forged documents /information may lead to our debarment from participation in Employer tenders and that our Bid Security/ Contract Performance Guarantee may be forfeited besides other actions as deemed to be appropriate as per the provisions of the Bidding Document/Integrity Pact/Employer’s policy.
5*. Our Balance Bid Capacity net of works under execution, calculated as per Clause ITB 23.2.1 (i.e. 3T-B), as on 1st date** of the Quarter in which First Envelope Bids are to be opened i.e. 01st
(MM/YYYY) in equivalent Indian Rupees is
Crore. The details of value used for working out the Balance Bid Capacity as above, are as follows:
A. Maximum value of Transmission & Distribution (T&D) works (including substation, transmission lines, distribution for all verticals), executed in any one financial year during the last 5 financial years taking into account the completed as well as the works in progress
S N FY Value of Total Sales (including Taxes and Duties)(T)
B. Value of existing commitments and ongoing similar works yet to be completed as on the 1st date of quarter of the financial year in which the bids are opened(B) as on 1st date of the Quarter in which First Envelope Bids are to be opened
S N Value of Balance Works (B1) against the Contracts awarded by Employer Value of Balance Works (B2) against the Contracts awarded by Utilities other than Employer Total value of Balance Works (B){B=B1+B2}
[**1st day of the quarter in which the first envelope bids are opened for e.g. If the actual date of opening of first envelope bids is in May 2020, the Balance bid capacity as on 01st April 2020 is to be declared)] *(Applicable only in case of package for which the stipulated Qualification Requirements in respect of Technical experience pertains primarily to erection, testing and commissioning/civil works viz. transmission Line tower packages/Substation package/civil works package etc.)
6***. Our/Our proposed manufacturer’s annual manufacturing capacity as certified by a Chartered Engineer or similar Professional/ Professional body/Govt Agencies is:
MT/annum (for tower/tower parts)
[Certificate from Chartered Engineer or similar Professional/ Professional body/Govt Agencies in the country of the bidder/proposed manufacturer is to be enclosed along with this Attachment. Annual manufacturing capacity of all the manufacturers to be furnished separately] ***(Applicable only in case of Tower packages with scope for tower supply)
7. Notwithstanding above, we also understand that the Bid Capacity/Manufacturing Capacity as declared hereinabove, shall be subject to assessment, if any, by the Employer, which shall be final and binding. We also confirm that the Employer may verify the supporting documents/ details in connection with above declarations. We further understand that in case of any unethical practices inter-alia including any misrepresentation of facts, submission of false and/or forged details/ documents/ declaration by us, we may be debarred from the participation in Employer’s tenders in future as considered appropriate by Employer and our Bid Security/ Contract Performance Guarantee shall be forfeited besides taking other actions as deemed appropriate.
Date : Printed Name :
Place : Designation :
Note: Key Managerial Personnel (KMP) of the company shall include CEO/Managing Director/ Company Secretary/ Director/ CFO/any of the partner in case of partnership firm/any other officer entrusted with substantial powers of the management of the affairs of the company/firm.
Bidders are advised to print this declaration on the Company Letter Head and upload the duly signed and scanned copy along with the First Envelope Bid.
Instruction for printing & submitting Integrity Pact
1. The requisite format of Safety Pact is getting generated automatically and displayed here below.
2. Take print out of first page on a non-judicial stamp paper of Rs. 100/- and other seven pages on plain A4 size paper. Such two sets shall be prepared by the bidder.
3. All the pages of both the copies of the Safety Pact shall be signed by the authorised representative of the bidder and duly stamped.
4. Both the original copies shall be submitted by the bidder in the form of Hard Copy as part of the first envelope before due date & time of submission of the bid.
5. For further details bidders may please refer relevant clause of ITB.
Power Grid Corporation of India Limited
having its Registered Office at B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi – 110016 hereinafter referred to as
having its Registered Office at
hereinafter referred to as
"The Bidder/Contractor"
POWERGRID intends to award, under laid-down organisational procedures, contract(s) for Upgradation of HMI PC and NTAMC integration of SIEMENS make FSC at Ballabhgarh & Meerut Sub-Stations
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of
Safety Pact Page 1 of 7
Upgradation of HMI PC and NTAMC integration of SIEMENS make FSC at Ballabhgarh & Meerut Sub-Stations Package and Specification Number N1/C&M/20-21/AM/OT/117 (Rfx number: 5002001511)
POWERGRID values full compliance with all relevant laws and regulations, and the principles of economical use of resources, and of fairness and transparency in its relations with its Bidders/ Contractors."
In order to achieve these goals, POWERGRID and the above named Bidder/Contractor enter into this agreement called 'Safety Pact' which will form a part of the bid.
It is hereby agreed by and between the parties as under:
Section I - Commitments of POWERGRID
POWERGRID commits itself to take all measures necessary to prevent accidents duringConstruction and Operation of the Transmission Assets and to observe the following:
1 POWERGRID recognizes and accepts its statutory responsibilities for ensuring construction, operation and maintenance of equipments and for the provision of safe methods of work and safe working conditions.
2 POWERGRID recognizes and accepts its statutory responsibilities for ensuring safety of not only its employees but also that of the Contracting Agencies as Principal Employer.
3 POWERGRID shall review the accidents in a structured manner and take necessary actions to ensure that the safety criteria are strengthened for safe construction as well as Operation & Maintenance of the Transmission Assets.
4 POWERGRID shall conduct necessary awareness and training programmes to its Employees to augment the various safety requirements to be followed during Construction and Operation & Maintenance of the Transmission Assets from time to time.
5 POWERGRID shall, from time to time, issue necessary guidelines,instructions and deterrents to its employees as well as to the Contracting Agencies, to update them to take necessary preventive measures to avoid repetition of similar accident attributes.
6 POWERGRID shall review and provide necessary guidanceto the Contracting Agencies, as and when, any abnormality / special situations are brought to its notice by the Contracting Agencies during execution of the Transmission Projects being executed by them.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of
Safety Pact Page 2 of 7
7 POWERGRID shall conduct periodical surveillance site inspections / audits to identify the unsafe conditions and unsafe actions, and bring them to the knowledge of the Contracting Agencies for taking timely corrective actions.
8 POWERGRID shall investigate all accidents, fatal as well as non-fatal, to identify the lapses, the reason for the accident / incident and suggest measures for prevention of recurrence of such accidents, and fix responsibility for the lapses leading to the accident.
9 POWERGRID shall augment the training to the workers and supervising personnel of the Contracting Agencies, as per schedules, upon nomination by the Contracting Agencies in reasonable time frame.
10 POWERGRID shall exercise the right to claim and recover compensation from the Contracting Agencies in case of any violation of the safety requirements / provisions during execution of the Transmission Projects, as built in the applicable Laws and contractual specifications / guidelines in vogue / issued by POWERGRID from time to time.
Section II - Commitments of the Bidder/Contractor
The Bidder / Contractor commits himself to take all measures necessary to prevent / minimise accidents at their construction / erection sites and to observe the following:
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of
Safety Pact Page 3 of 7
1 The Bidder / Contractor recognizes and accepts the statutory and comprehensive responsibility for ensuring safe construction and Testing & Commissioning in the Transmission Projects being executed by them by providing safe methods of work, working conditions and Tools & Plants for human safety.
2 The Bidder / Contractor recognizes and accepts the responsibilities for ensuring safety of not only their employees but also that of the Sub-contractors, Principal Employer and the general public during execution of the Transmission Projects / works.
3 The Bidder / Contractor shall review the accidents in a structured manner and take necessary actions to ensure that the safety criteria are strengthened for safe construction of the Transmission Assets.
4 The Bidder / Contractor shall endeavour continuous development of safe methods of work to ensure that the effect of risks and perils are minimised to the extent possible and implement the same at their worksites.
5 The Bidder / Contractor shall conduct periodical Training to their Employees as well as to that of their Sub-contractors for safety awareness during construction works being executed by them.
6 The Bidder / Contractor shall provide all requisite Tools & Plants required for the work and ensure their healthiness by periodical inspections / testing as required. Unhealthy and sub-standard Tools & Plants will be immediately removed from site as and when they are identified.
7 The Bidder / Contractor shall,at their cost, provide all necessary Personal Protective Equipments such as Double Lanyard Safety Belts, Appropriate Fall Arrest Systems, Safety Helmets, Foot Wear, Hand Gloves, etc., as required for various activities pertaining to execution of the Projects / works, confirming to relevant Indian Standards.
8 The Bidder / Contractor shall ensure that dedicated qualified Safety Officers are posted in the construction projects being executed by them and ensure that the Safety Officer visits each and every gang periodically and conducts audits / inspections to identify the unsafe conditions and unsafe actions, to be rectified by the site supervising personnel promptly.
9 The Bidder / Contractor shall conduct appropriate medical checks-up for the workers before deploying them at their construction sites to ensure that only those who are medically fit are deployed in the Projects / works to be executed by them. The copy of the Medical Reports shall be provided by the Bidder / Contractor to POWERGRID, whenever requested by POWERGRID.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of
Safety Pact Page 4 of 7
10 The Bidder / Contractor shall screen the workers before deploying them at their construction sites to ensure that only those with the skills, experience and competence to work at height and also medically fit for work at height are deployed for work at height in the Projects executed by them.
11 The Bidder / Contractor shall ensure daily before starting the work that their site Supervising Personnel / Safety Officer briefs the workers about the work for the day and the safety measures / precautions required to be taken by them.
12 The Bidder / Contractor shall investigate all the accidents at their working sites to ascertain the lapses leading to the incident and the precautionary / corrective measures required to be taken to avoid recurrence of such accidents. These accidents will be reviewed at the Board Management level of the Agencies and the findings / recommendations will be put up to POWERGRID Apex Safety Board within the stipulated period.
13 The Bidder / Contractor shall ensure that all accidents, whether fatal or non-fatal in nature, will be informed to POWERGRID, in writing, immediately on the occurrence of the same,and in any case, within not more than 24 hours of occurrence of the same.
14 The Bidder / Contractor shall ensure that in case of any accident, all necessary medical help / supportshall be provided to the victims / injured till they are completely fit to return to work.
15 The Bidder / Contractorshall ensure that in case of fatal accidents, all statutory Authorities, including Police, concerned Labour Dept. Officials, concerned Workmen Compensation Commissioner, etc., will be intimated in writing as required by the statutory Law, and followed up for compliance of all statutory obligations. The Bidder / Contractor shall own full responsibility of timely accident reporting to various authorities, including POWERGRID.
16 The Bidder / Contractor shall ensure that in case of fatality or serious injury leading to permanent disablement of the victims, the compensation amount will be deposited with the concerned authorities, as required by the Laws, and followed up for early disbursement to the beneficiaries of the victims.
17 The Bidder / Contractor assures that they shall co-operate to the fullest extent for carrying out any investigation of the accidents at their work sites by POWERGRID to identify the lapses, the reason for the accident / incident and suggest measures for prevention of recurrence of such accidents. All factual details of the occurrence of the accident will be provided to POWERGRID, as and when required.
18 The Bidder / Contractor assures that they take full responsibility of meeting the statutory obligations in case of accidents, and in case of any reference by any Statutory Body at a later date also, they shall provide all information to POWERGRID and meet all the statutory obligations, including payment of additional compensation, if any.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of
Safety Pact Page 5 of 7
19 The Bidder / Contractor assures that in case of any inspection of their work site or Notice by any Statutory Authority, they shall comply promptly and inform POWERGRID Site Officials of the same, and also provide all necessary information and assistance for smooth compliance of the observations / instructions of such Authorities.
20 The Bidder / Contractor accepts the provisions regarding safety, including payment of any sums to POWERGRID, in case of any violation of the safety requirements / provisions during execution of the Transmission Projects, as built in the Contractual Conditions, Safety Plan and the Safety Pact, and confirm to abide by the same.
Section III- Equal treatment to all Bidders / Contractors:
(1) POWERGRID will enter into agreements with identical conditions as this one with all Bidders.
(2) POWERGRID will disqualify, from the tender process, any bidder/ take punitive actions on the bidder, who does not sign this Pact or violate its provisions.
Section IV - Pact Duration:
This Pact begins when both parties have legally signed it. It expires for the successful Bidder / Contractor after closure of the contract and, for all other Bidders, after the contract has been awarded.
Section V - Other Provisions:
(1) This agreement is subject to Indian Law. Place of performance and jurisdiction is the establishment of POWERGRID. The Arbitration clause provided in the main tender document / contract shall not be applicable for any issue / dispute arising under the Safety Pact.
(2) Changes and supplements need to be made in writing, which shall come into force only upon mutual agreement / acceptance.
(3) If the Contractor is a partnership firm or consortium of Joint Venture, this agreement must be signed by all partners, consortium members and Joint Venue partners, as applicable as per the Tender Specifications.
(4) Nothing in this agreement shall affect the rights of the parties available under General Conditions of Contract (GCC) and Special Conditions of Contract (SCC).
(Signature) (Signature)
(For & On behalf of POWERGRID) (Signature)
Safety Pact Page 6 of 7
(5) Should one or several provisions of this agreement turn out to be invalid, the reminder of this agreement remains valid. In this case, the parties will strive to come to an agreement to their original intentions.
Signature Signature
(For & On behalf of POWERGRID) (For & On behalf of
(Office Seal) (Office Seal)
Designation : Designation :
Witness 1 : Witness 1 :
Designation : Designation :
Witness 1 : Witness 1 :
Designation : Designation :
Safety Pact Page 7 of 7
Tender Enquiry No. :N1/C&M/20-21/AM/OT/117 (Rfx number: 5002001511) Bid Form 1st Envelope 1 one 1 st 1 January
2 two 2 nd 2 February
BID FORM (First Envelope) 3 three 3 rd 3 March
4 four 4 th 4 April
Bid Proposal Ref. No. 5 five 5 th 5 May
Date : 6 six 6 th #VALUE! 6 June
7 seven 7 th #VALUE! 7 July
To: 8 eight 8 th #VALUE! 8 August
Contracts & Materials dept. 9 nine 9 th #VALUE! 9 September
Power Grid Corporation of India Ltd., 10 ten 10 th 10 October
Northern Region–I, Regional Headquarter, 11 eleven 11 th 11 November
SCO Bay No. 5 to 10, Sector 16A, 12 twelve 12 th 12 December
Faridabad-121002, Haryana 13 thirteen 13 th
14 fourteen 14 th
Name of Contract : Upgradation of HMI PC and NTAMC integration of SIEMENS make FSC at Ballabhgarh & Meerut Sub-Stations 15 fifteen 15 th
Dear Ladies and/or Gentlemen, Enter details here. 0 16 sixteen 16 th
1.0 Having examined the Bidding Documents, including Amendment Nos. ...[Enter the Amendment]… dated …[Enter the Date in dd-mm-yyyy]… the receipt of which is hereby acknowledged, we the undersigned, offer to design, manufacture, test, deliver, install and commission (including carrying out Trial operation, Performance & Guarantee Test as per the provision of Technical Specification) the Facilities under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 9.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope – Techno – Commercial Part & Second Envelope - Price Part (to be opened subsequently). ...[Enter the Amendment]… …[Enter the Date in dd-mm-yyyy]… the receipt of which is hereby acknowledged, we the undersigned, offer to design, manufacture, test, deliver, install and commission (including carrying out Trial operation, Performance & Guarantee Test as per the provision of Technical Specification) the Facilities under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 9.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope – Techno – Commercial Part & Second Envelope - Price Part (to be opened subsequently). 17 seventeen 17 th
1.1 We meet the eligibility requirements and have no conflict of interest in accordance with ITB Clause 2
2.0 Attachments to the Bid Form (First Envelope) Bank Draft 18 eighteen 18 th
In line with the requirement of the Bidding Documents, we enclose herewith the following Attachments: Enter details here. Pay Order 19 nineteen 19 th
Or Online Payment Acknowledgement towards Bid Security for a sum of ................................................ (name of currency and amount in words and figures)
Or documentary evidence in support of exemption of Bid Security, in separate envelope in accordance with clause 13.1 of ITB, Section-II
(b) Attachment 2() : A power of attorney duly authorized by a Notary Public indicating that the person(s) signing the bid have the authority to sign the bid and thus that the bid is binding upon us during the full period of its validity in accordance with the ITB Clause 14. Bank Guarantee (0) 21 st
(c) Attachment 3() : The documentary evidence that we are eligible to bid in accordance with ITB Clause 2. Further, in terms of ITB Clause 9.3 (c) & (e), the qualification data has been furnished as per your format enclosed with the bidding documents Attachment-3(QR). 22 th
Further, the required Joint Venture Agreement signed by us and our Partners has also been furnished as per your format Attachment-3(JV). SOLE BIDDER Applicable 23 th
Further the required deed of Joint Undertaking signed by us and Tower Manufacturer has also been furnished as per your format. 0 1 Not Applicable 24 th
(d) Attachment 4() : The documentary evidence establishing in accordance with ITB Clause 3, Vol.-I of the Bidding Documents that the facilities offered by us are eligible facilities and conform to the Bidding Documents has been furnished as Attachment 4. A list of Special Tools & Tackles to be used by us for erection, testing & Commissioning and to be handed over to Employer, the cost of which is included is our Bid Price, is also enclosed as per your format as Attachment 4A. A list of Special Tools & Tackles to be brought by the contractor for erection, testing & Commissioning and to be taken back after completion of work, whose cost in not included in our bid price, is enclosed as per your format as Attachment 4B. 25 th
(e) Attachment 5() : The details of all major items of services or supply which we propose subletting in case of award, giving details of the name and nationality of the proposed subcontractor/sub-vendor for each item. 26 th
(f) Attachment 5A() : (Items, Components, Raw Material, Services proposed to be sourced from Micro and Small Enterprises): The details of the items, components, raw material, services which is proposed to bought/availed from Micro and Small Enterprises for the purpose of completion of works 27 th
(g) Attachment 6() : The variation and deviations from the requirements of the Conditions of Contract, Technical Specification and Drawings (excluding critical provisions as mentioned at clause 6.0 below) in your format enclosed with the Bidding Documents, including, inter alia, the cost of withdrawal of the variations and deviations indicated therein. 28 th
(h) Attachment 7() : The details of Alternative Bids made by us indicating the complete Technical Specifications and the deviation to contractual and commercial conditions. (Not Applicable) 29 th
(i) Attachment 8() : Manufacturer’s Authorisation Forms. 30 th
(j) Attachment 9() : Work Completion Schedule. 31 st
(k) Attachment 10() : Guarantee Declaration.
(l) Attachment 11() : Information regarding ex-employees of Employer in our firm.
(m) Attachment 12() : Filled up information regarding Price Adjustment Data as per the format enclosed in the bidding documents.
(n) Attachment 13() : Declaration regarding Social Accountability.
(o) Attachment 14() : Integrity Pact, in a separate envelope, duly signed on each page by the person signing the bid.
(p) Attachment 15() : Option for Initial Advance (either Interest Bearing Initial Advance or No Initial Advance) and Information for E – payment, PF details and declaration for Micro/Small and Medium Enterprise
(q) Attachment 16() : Additional Information.
(r) Attachment 17() : Declaration for tax exemptions, reductions, allowances or benefits
(s) Attachment 18() : Safety Pact
(t) Attachment 19 () : Declaration.
(u) Attachment 20 () : Declaration of Key Managerial Person jointly with Power of Attorney holder
(v) Attachment 21 () : Self certification regarding Minimum Local Content in line with PPP-MII order and MoP Order December 2018, if applicable
(w) Attachment 22 () : Certificate from statutory auditor or cost auditor of the company (in the case of companies) or from a practicing cost accountant or practicing chartered accountant (in respect of suppliers other than companies) giving the percentage of Local Content, in line with PPP-MII order, and MoP Order December 2018, if applicable
(x) Attachment 23 () : Compliance to the process related to the e-RA Terms & Conditions and the Business Rules governing the e-RA
(y) Attachment 24 () : Declaration by the bidder regarding events encountered pursuant to ITB Clause 2.1
2.2 We are a Micro and Small Enterprise (MSE) registered with
a designated Authority of GoI under the Public Procurement Policy for MSEs order 2012. (applicable for MSE only)
3.0 We are aware that, in line with Clause No. 27.1 (ITB), our Second Envelope (Price Part) is liable to be rejected in case the same contains any deviation/omission from the contractual and commercial conditions and technical Specifications other than those identified in this First Envelope.
4.0 We confirm that except as otherwise specifically provided our Bid Prices in Second Envelope include all taxes, duties, levies and charges as may be assessed on us, our Sub-Contractor/Sub-Vendor or their employees by all municipal, state or national government authorities in connection with the Facilities, in and outside of India.
4.1 100% of applicable Taxes and Duties i.e. GST which are payable by the Employer under the Contract, shall be reimbursed by the Employer on production of satisfactory documentary evidence by the Contractor in accordance with the provisions of the Bidding Documents.
4.3 We confirm that we have also registered/we shall also get registered in the GST Network with a GSTIN, in all the states where the project is located and the states from which we shall make our supply of goods
5.0 Construction of the Contract
5.1 We declare that we have studied Clause GCC 2.1 relating to mode of contracting for Domestic Bidders and we are making this proposal with a stipulation that you shall award us two separate Contracts viz ‘First Contract’ for ex-works supply of all equipment and materials including mandatory spares and ‘Second Contract’ for providing all the services i.e. inland transportation for delivery at site, insurance, unloading, storage, handling at site, installation, testing and commissioning including Trial operation in respect of all the equipment supplied under the ‘First Contract’ and other services specified in the Contract Documents. We declare that the award of two contracts, will not, in any way, dilute our responsibility for successful operation of plant/equipment and fulfillment of all obligations as per Bidding Documents and that both the Contracts will have a cross-fall breach clause i.e. a breach in one Contract will automatically be classified as a breach of the other contract which will confer on you the right to terminate the other contract at our risk and cost.
6.0 We have read the provisions of following clauses and confirm that the specified stipulations of these clauses are acceptable to us:
(a) ITB 13 Bid Security
(b) GCC 2.14 Governing Law
(c) GCC 5.7 Contractors Responsibility
(d) GCC 8 Terms of Payment
(e) GCC 9.3 Performance Security
(f) GCC 10 Taxes and Duties
(g) GCC 21.2 Completion Time Guarantee
(h) GCC 22 Defect Liability
(i) GCC 23 Functional Guarantee
(j) GCC 25 Patent Indemnity
(k) GCC 26 Limitation of Liability
(l) GCC 38 Settlement of Disputes
(m) GCC 39 Arbitration
(n) Appendix 2 to Form of Contract Agreement Price Adjustment
Further we understand that deviation taken in any of the above clauses by us may make our bid non-responsive as per provision of bidding documents and be rejected by you.
7.0 We undertake, if our bid is accepted, to commence the work immediately upon your Notification of Award to us, and to achieve the delivery of goods and related services within the time stated in the Bidding Documents.
8.0 If our bid is accepted, we undertake to provide a Performance Security in the form and amounts, and within the times specified in the Bidding Documents.
9.0 We agree to abide by this bid for a period of six (06) months from the date fixed for opening of bids as stipulated in the Bidding Documents, and it shall remain binding upon us and may be accepted by you at any time before the expiration of that period.
10.0 Until a formal Contract is prepared and executed between us, this bid, together with your written acceptance thereof in the form of your Notification of Award shall constitute a binding contract between us.
11.0 We understand that you are not bound to accept the lowest or any bid you may receive.
12.0 Commissions or gratuities, if any, paid or to be paid by us to agents relating to this Bid, and to contract execution, if we are awarded the contract, are listed below:-
Name and Address of Agent Amount and Currency Purpose of Commission or Gratuity
(If none, state “none”)
13.0 # (For Joint Venture only) We, the partners of Joint Venture submitting this bid, do agree and confirm that in case of Award of Contract on the Joint Venture, we shall be jointly and severally liable and responsible for the execution of the Contract in accordance with Contract terms and conditions.
14.0 We, hereby, declare that only the persons or firms interested in this proposal as principals are named here and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if the award is made on us, that this proposal is made without any connection with any other person, firm or party likewise submitting a proposal is in all respects for and in good faith, without collusion or fraud.
Thanking you, we remain,
Yours faithfully,
For and on behalf of
Date : Printed Name :
Place : Designation :
In case of bid from a Joint Venture, name & designation of representative of JV partner is to be provided and Bid Form is also to be signed by him
Other Partner -1 Other Partner -2 2
Printed Name : Printed Name :
Designation : Designation :
Please provide additional information of the Bidder
Business Address :
Country of Incorporation :
State/Province to be indicated :
Name of Principal Officer :
Address of Principal Officer :
Note: Bidders may note that no prescribed proforma has been enclosed for Attachment 2() Power of Attorney. Bidders may use their own proforma for furnishing the required information with the bid.
Note: Bidders may note that no prescribed proforma has been enclosed for Attachment 2() Power of Attorney. Bidders may use their own proforma for furnishing the required information with the bid.
23 Twenty Three
27 Twenty Seven
28 Twenty Eight
33 Thirty Three
37 Thirty Seven
38 Thirty Eight
73 Seventy Three
74 Seventy Four
75 Seventy Five
77 Seventy Seven
78 Seventy Eight
79 Seventy Nine
83 Eighty Three
87 Eighty Seven
88 Eighty Eight
93 Ninety Three
97 Ninety Seven
98 Ninety Eight
100 One Hundred
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html
01-Section - I IFB SSTE Vol-I.docx
docx • 0.04 MB
02-Section - II ITB SSTE S&I Rev 5-DCB-SRM.docx
docx • 0.09 MB
03 Section - III BDS SSTE Vol-I.docx
docx • 0.06 MB
04-Annexure-C(BDS).docx
docx • 0.02 MB
04A-ANNEXURE-A (BDS).doc
doc • 0.05 MB
05-Section - IV GCC -S&I Rev 3-DCB.pdf
pdf • 1.93 MB
06-Section - V SCC SSTE Vol-I.docx
docx • 0.04 MB
07A-Annexure-I to SCC.pdf
pdf • 0.63 MB
07B-Appendix-I to SCC.doc
doc • 0.17 MB
08-Section - VI Forms and Proceedures Vol-I_TW2B.doc
doc • 0.42 MB
CHECKLIST FOR TENDER SUBMISSION.docx
docx • 0.02 MB
~$-Annexure-C(BDS).docx
docx • 0.00 MB
BOQ FOR REFERENCE.pdf
pdf • 0.17 MB
Communication Architecture_FSC.pdf
pdf • 0.74 MB
FSC_NTAMC Signal List.pdf
pdf • 0.25 MB
FSC_Signal List_Ballabhgarh.pdf
pdf • 0.39 MB
FSC_Signal List_Meerut.pdf
pdf • 0.25 MB
LOCAL_REF_12020_1601040956404.xls
xls • 0.12 MB
LOCAL_REF_12020_1601040961067.xlsx
xlsx • 0.03 MB
LOCAL_REF_12020_1601040965569.xlsx
xlsx • 0.02 MB
NTAMC_Grouping of Signals.pdf
pdf • 0.08 MB
SCOPE OF WORK (TECHNICAL SPECIFICATIONS).pdf
pdf • 0.30 MB
Single Line Diagram_FSC.pdf
pdf • 0.08 MB
01- 1st Envelope-Bid Form Attachments.xlsx
xlsx • 1.93 MB
04-Attachment-18-SAFETY PACT.docx
docx • 0.03 MB
11-Attachment -26_Declaration regarding events encountered.docx
docx • 0.02 MB
12-Legends.pdf
pdf • 0.03 MB
Attachemnt-23- Affidavit for self-certifictaion.DOCX
docx • 0.02 MB
attachment 24- certifacte by Auditor.docx
docx • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .