Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical V P O GANVI TEH RAMPUR DISTT SHIMLA | GANVI | SHIMLA | HIMACHAL PRADESH | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical VILL KIYAR PO JEORI TEHSIL RAMPUR DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical N A | Admitted-Fee/PreQual/Technical |
Tender Value
₹4.4 L
EMD Value
₹4,399
Closing Date
9 Jun 2026, 9:00 amClosed
Additional Superintending Engineer
Additional Superintending Engineer, GPHD, Jeori
Removal of unwanted bushes, grass from penstock area, 22KV yard, residential/non-residential building Forebay drain valve channel. Mtc of water supply line. Cleaning of side drains along penstock, residential/non-residential building power house c
2026_HPSEB_135542_1
HPSEBL/GPHD/DB-9/2026-27-051
Open Tender
Manpower Supply
Percentage
290 days
Nogli
Please refer Tender documents.
5 documents required · 5 mandatory
₹590
₹4,399
1 Aug 2026
3 Jun 2026
10 Jun 2026
3 Jun 2026
9 Jun 2026
3 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Supply Part | |||||
| 1.01 | Removal of un-wanted bushes, grass from 22KV switch yard, penstock area, power house complex Area residential/non-residential complex Area , spillway Area, forebay drains channel Area I/C . Cleaning of Forebay drain, Penstock drain, residential, non/residential complex drains, Mtc of water supply line from forebay to residential/Non residential complex of Nogli Power-House complete in all respects as per the requirement and direction of EIC for the period 15.06..2026 to 31.03.2027 (i.e.290 days). (Providing 1 nos beldar and 1 nos fitter for this work)
NOTE:- (1) The work will be suspended immediately if the services are not found satisfactory or HPSEBL provides its own man power for the propose.
(2) Number of labour can be increase / decrease as per urgency of work.
(3) The materials/T&P required will be provided by the Contractor.
(4) Contractor will be responsible for any fatal / non-fatal accident during the work.
(5) The G.S.T @18% will be paid /born by HPSEBL extra. The same shall be deposited by the contractor himself. | 1 | Job | 3,72,773 | ₹3,72,773 |
stage.html
html • 0.03 MB
cancelled_1.pdf
pdf • 0.42 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
48tender.pdf
Tender Documents • 9.61 MB
BOQ_200736.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .