Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹24.3 Laccepted-aoc | ₹24.3 L | accepted-aoc |
Tender Value
₹24.8 L
EMD Value
₹50,000
Closing Date
6 Apr 2026, 4:00 pmClosed
Public Works Department
RAMAMURTHY K L
Preparation of Detailed Project Report (DPR) for construction of four lane bypass road from SH-05 to SH-95 road In Bangarapet town, Bangarpet taluk, Kolar district
PWD/2025-26/SE1100
PWD/2025-26/SE1100
Open
Two Tender Document System(Two Cover)
PWD Division Office Kolar
6 documents required · 6 mandatory
Upload workdone certificate not below the rank of executive engineer working as Consultants for any State Government/Central Government Authorities/Development authorities and should have prepared feasibility/DPR for Bypass Roads of for a length of minimum 6.0 kms in last 5 years, Expressways/NH/SH/Ring Roads of Minimum Project cost 100 cr, ROB 1 nos
The firm must have experience in the field of civil engineering consultancy for last 10 years in preparation of feasibility report/DPR services for State/Central Government and their undertaking agencies
Only consultants empanelled with the Public Works Department (PWD) shall be eligible for this assignment
To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e. 2020-21 to 2024-25 achieved in at least two financial years a minimum financial turnover(in all classes of civil engineering construction works only) of Rs.50.00 Lakhs Financial Status(Certificate from CA with UDIN Number, if Failed to satisfy the condition tender will be rejected) (The turn over certificate shall have UDIN generated through ICAI Portal. Turn over certificate without UDIN will not be considered and treated as invalid. The confirmation letter issued by Chartered Accountant shall also have UDIN generated through ICAI Portal)
₹620
₹50,000
13 Sept 2026
26 Mar 2026
7 Apr 2026
4 Apr 2026
30 Mar 2026
Carrying of detailed topographic survey by using total station along the existing or new road including taking L-section and cross section at every 30 meter ROW, picking up all existing details inside the Row like electric telephone line, encroachments, structures etc. connecting all the primary total station control points by G.I.S.Bench marks level or whichever available with department using auto level and preparing Auto CAD plan
Survey of C.D. works including taking L-Section of road, catchment area plan by Traverse method and taking trial pits of size 1.50 x 1.50 x 1.50m including preparation of detailed plans and estimates in 5 copies and all types of compliance if required from the department
Survey of Minor bridge including taking L section of existing road and two defined cross sections, one of U/s and one of D/s, one vergin cross section on alternate proposed cross sections and bed slope of stream upto sufficient long distance as required with chain and compass. Taking three trial pits of size 1.00x1.00x3.0 m and collecting samples of materials at site for ascertaining the silt factor, unit weight test, specific gravity from Govt. site plan and other drawings etc.
Taking trial bores 75 to 100 mm for 53.0 to 88.9 mm core dia over burden ( by diamond drilling machine ) such as soil of all sorts, soft murum, hard murum and boulders and in soft rock including all materials such as casing pipes and accessories oil, grease, steel, rods, and such other materials as required. Preserving the loose sample in glass jar and core sample serially on site of work and conveying the same to HQ of concerning office as directed. a) over burden 0 to 50m
Taking trial bores 75 to 100 mm for 53.0 to 88.9 mm core dia in rocks as specified below including all necessary materials such as oil, grease, steel boostan and such other materials as required (including conveying the material to site of work) and Preserving the core sample serially on site of work and conveying the same to HQ of concernring office as directed. Quartzite with diamond drill with Nx Bit 0 to 50 m.
Geometrical design of road horizontal and vertical curves for design speed specified by IRC including carrying out trail for optimising of civil cost minimising land acquisition and maximum use of existing facility and preparation of widening arrangement drawing for insisting structures stake out date for horizontal alignment and working levels including super elevation effect etc. complete.
Deploying Automated Traffic Count (ATCC) and classification system on Road (Two Lane) in both direction at designated traffic count post by using High Definition Cameras. Collecting the Non Editable Data In DVR System with necessary electronic and electrical arrangements or inventor of required capacity Classification of data to the concerned department in hard copies as well as in soft copy, A) Up to 7 Days (Two Lane)
Taking the trial pit for roads alignment C.D. Works in Hard murum and Boulders including stacking the excavated material including all lifts and necessary back filling up to depth 1.5 m.
Providing detailed geological reports of proposed site by maintaining geotechnical investigation of structure stratification collecting soil, rock and ground water samples for laboratory tests to arrive the foundation design parameters. Rock properties such as type of rock, jointing fractures, etc.complete with suggestion about the site foundation and remedies
Preparation of Land Acquisition proposal including collection of 7/12 and 8/A documents marking alignment on village maps, area calculation, preparation of proposal, printing,binding, etc. complete and submission of 5 sets more ever liasoning and coordination with revenue authorities with compliance if any until finalisation of award including Joint measurement of the alignment. (For new alignment)
Design of junctions including detail layout of traffic signs informatory boards traffic islands. Breaks in median verge including working levels at junctions as per IRC standards etc. complete. b) Minor Junction
Preparation of draft / Final Report comprising of technical financial economic feasibility and environmental aspects of the project including executive summary and detailed chapters on necessity and introduction of project existing and future traffic design philosophy scope of work
Providing of Jeep/vehicle for conveying survey material Engineers labours etc. complete
Reconnaisance Survey of Road alignment in plain country including taking three dimensions of apexes, verification of type of land etc. alongwith the alignment etc. complete (Without Chaining)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
KC 8 SE1100.docx
Tender Document • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .