Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.5 LAdmitted-Fee/PreQual/Technical/Finance | -33.81% | ₹12.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹12.5 L+₹3,764.01 (0.30%)Admitted-Fee/PreQual/Technical/Finance | -33.61% | ₹12.5 L+₹3,764.01 (0.30%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹12.5 L+₹8,845.43 (0.71%)Admitted-Fee/PreQual/Technical/Finance | -33.34% | ₹12.5 L+₹8,845.43 (0.71%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹13.2 L+₹75,844.82 (6.09%)Admitted-Fee/PreQual/Technical/Finance | -29.78% | ₹13.2 L+₹75,844.82 (6.09%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹13.8 L+₹1.3 L (10.7%)Admitted-Fee/PreQual/Technical/Finance | -26.70% | ₹13.8 L+₹1.3 L (10.7%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹18.8 L
EMD Value
₹37,650
Closing Date
22 Jul 2026, 4:00 pmClosed
Xen RNB Sopore
RNB Sopore
Construction Of fencing around PHC Tarzoo
2026_PWDJK_315671_1
NIT No- 44 of RnB-Sopore of 2026-2027
Open Tender
Civil Works
Percentage
60 days
Sopore
Please refer Tender documents.
5 documents required · 5 mandatory
₹800
Xen RNB Sopore
₹37,650
27 Jul 2026
11 Jul 2026
23 Jul 2026
11 Jul 2026
22 Jul 2026
11 Jul 2026
11 Jul 2026 - 22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge.In cement mortar. | - | Cum | - | - |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work up to plinth level 1:2:4 (1Cement: 2 coarse sand: 4 grade stone aggregate 20mm nominal size) including all carriages. | 1 | Cum | - | - |
| 3 | Centering and shuttering including strutting propping etc. and removal of form for foundation, footings basses of columns etc . For mass concrete including all carriages. | 1 | Sqm | - | - |
| 4 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete, including all carriages. | - | kg | 1 | - |
| 5 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade.Two or more coats on new work including all carriages. | - | Sqm | 1 | - |
| 6 | Carraige of Material from Source upto site of Work By Mchanical Transport.Average lead of 20 km. | - | Cum | 1 | - |
| 7 | Sand Average lead of 20 km. | - | Cum | 1 | - |
stage.html
html • 0.03 MB
finance_1024720.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_1024720.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .