Tender Value
₹6 Cr
EMD Value
₹2 L
Closing Date
8 Oct 2026, 5:00 pm
CEO, Technopark
Park Centre, Technopark, Phase 1 campus
Comprehensive Annual Maintenance Contract for Civil Works
2026_ETPK_870842_1
ETPK/PH1/260/2026-2027
Open Tender
Civil Works - Others
Item Rate
365 days
Technopark Campuses
As mentioned in Bid document
6 documents required · 6 mandatory
₹11,800
₹2 L
Park Centre, Technopark, Phase 1 campus
18 Sept 2026
18 Sept 2026
9 Oct 2026
18 Sept 2026
8 Oct 2026
23 Sept 2026
23 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SEZ Area Building Maintenance Works | |||||
| 1.001 | Earth work in excavation by manual means in foundation trenches or drains, sunken area, including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil in side the building and disposal of surplus excavated soil as directed, outside technopark campus. All kinds of soil The rate inclusive of all material charge, labour, transportation, loading/unloading at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge. | 20 | Cum | - | - |
| 1.002 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and sunken area etc. in layers not exceeding 20 cm in depth, in building, consolidating each deposited layer by ramming and watering, lead up to 500 m and lift up to 1.5 m. All kinds of soil. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge. | 20 | Cum | - | - |
| 1.003 | Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations and sunken area etc. in layers not exceeding 20 cm in depth, in building consolidating each deposited layer by ramming and watering, lead up to 250 m and lift up to 1.5 m as per direction of site Engineer-in-charge The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge. | 15 | Cum | - | - |
| 1.004 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with: Cement mortar 1:6 (1 cement : 6 coarse sand) in building. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge. | 20 | Cum | - | - |
| 1.005 | Random rubble masonry with hard stone in superstructure above plinth level including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like. Cement mortar 1:6 (1 cement : 6 coarse sand) in building. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge. | 10 | Cum | - | - |
| 1.006 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size) in building. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge. | 10 | Cum | - | - |
| 1.007 | Providing and laying cement concrete retaining walls, return walls, walls ( any thickness) including attached pilasters, in columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, Plinth beam and lintel etc. up to all floors all level inside building, excluding the cost of centering, shuttering and finishing: 1:3:6 ( 1 cement : 3 coarse sand :6 graded stone aggregate 20 mm nominal size) In building. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge. | 10 | Cum | - | - |
| 1.008 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level in building: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge. | 15 | Cum | - | - |
| 1.009 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1 Cement : 3 manufactured sand derived from Recycled Concrete Aggregate (RCA) : 6 graded stone aggregate 20 mm nominal size Recycled Concrete Aggregate (RCA) this item is only for non structural works. ) The rate inclusive of all material charge, labour, transportation, loading/unloading at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge. | 15 | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
BID.pdf
Tender Documents • 1.63 MB
BOQ_1475706.xls
BOQ • 0.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .