Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.7 LAdmitted-Finance 66 6 410 1 MULAGANDA HOUSING COLONY GAJUWAKA DEPOT VISAKHAPATNAM 530026 | VISAKHAPATANAM | ANDHRA PRADESH | 530026 | L1 | Admitted-Finance | |
| 2 | L2₹30.9 L+₹22,908.42 (0.75%)Admitted-Finance ASHOKA PARK PALLAVA PARK BVT INS VISHWAKARMA INDIAN NAVY OF GE ND VISAKHAPATNAM | VISAKHAPATANAM | ANDHRA PRADESH | 530001 | L2 | Admitted-Finance | |
| 3 | L3₹33.9 L+₹3.2 L (10.5%)Admitted-Finance 38 41 28 104 AREA INDUSTRIAL ESTATE VISAKHAPATNAM 530007 | VISAKHAPATANAM | ANDHRA PRADESH | 530007 | L3 | Admitted-Finance | |
| 4 | L4₹34.7 L+₹4.0 L (13.1%)Admitted-Finance ASHOKA PARK PALLAVA PARK BVT INS VISHWAKARMA INDIAN NAVY OF GE ND VISAKHAPATNAM | VISAKHAPATANAM | ANDHRA PRADESH | 530001 | L4 | Admitted-Finance | |
| 5 | L5₹36.0 L+₹5.3 L (17.3%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Sri balaji Constructions L6 | M/S Jayalakshmi Constructions L3 | GS ENGINEERS L4 | GVR CONSTRUCTIONS L1 | M/s SRINIVASA REDDY CONSTRUCTIONS L5 | SAI SRINIVAS CONSTRUCTIONS L2 |
|---|---|---|---|---|---|---|---|---|---|
| .01SCHEDULE 'A' PART-I: B/R WORKS | |||||||||
| 1.00 | Taking down shutters of any description n exc 1 sqm each upto 9th floor | 40 | Per Leaf | 80 ₹3,200 | 70 ₹2,800 | 100 ₹4,000 | 69 ₹2,760 | 40 ₹1,600 Lowest | 40 ₹1,600 Lowest |
| 2.00 | Taking down shutters of any description exc 1sqm but n.exc 2 sqm upto 9th floor | 40 | Per Leaf | 100 ₹4,000 | 90 ₹3,600 | 100 ₹4,000 | 69 ₹2,760 | 60 ₹2,400 | 55 ₹2,200 Lowest |
| 3.00 | Taking down chowkats or frames not exc 1.5 sqm each without taking off shutters from the frame upto 9th floor. | 40 | Each | 180 ₹7,200 | 130 ₹5,200 | 100 ₹4,000 | 99 ₹3,960 | 130 ₹5,200 | 60 ₹2,400 Lowest |
| 4.00 | Taking down chowkats or frames exc 1.5 sqm but not exc 4 Sqm each without taking off shutters from the frame upto 9th floor | 40 | Each | 220 ₹8,800 | 160 ₹6,400 | 100 ₹4,000 | 99 ₹3,960 | 160 ₹6,400 | 95 ₹3,800 Lowest |
| 5.00 | Resecuring or easing & adjusting without taking down shutters of any description n.exc 1 Sqm each upto 9th floor | 80 | Per Leaf | 60 ₹4,800 | 80 ₹6,400 | 100 ₹8,000 | 99 ₹7,920 | 36 ₹2,880 Lowest | 40 ₹3,200 |
| 6.00 | Resecuring or easing & adjusting without taking down shutters of any description exc 1sqm but n.exc 2 sqm upto 9th floor | 80 | Per Leaf | 80 ₹6,400 Lowest | 110 ₹8,800 | 100 ₹8,000 | 99 ₹7,920 | 110 ₹8,800 | 90 ₹7,200 |
| 7.00 | Taking down shutters of any description n. exc 1 sqm each and refixing in same opening upto 9th floor | 40 | Per Leaf | 100 ₹4,000 | 100 ₹4,000 | 100 ₹4,000 | 99 ₹3,960 | 110 ₹4,400 | 65 ₹2,600 Lowest |
| 8.00 | Taking down shutters of any description exc 1sqm but n.exc 2 sqm each and refixing in same opening upto 9th floor | 40 | Per Leaf | 130 ₹5,200 | 120 ₹4,800 | 100 ₹4,000 | 69 ₹2,760 Lowest | 150 ₹6,000 | 185 ₹7,400 |
| 9.00 | S&F Mild steel Angles, bars, flats etc., as in supports for stiffening of fencing, wall ties, hold fasts, clamps, plain angle cleats for securing purlins and similar small articles confirming to Fe 410-0 or Fe-310-O upto 9th floor | 59 | Kg | 100 ₹5,900 | 110 ₹6,490 | 100 ₹5,900 | 99 ₹5,841 | 110 ₹6,490 | 95 ₹5,605 Lowest |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
15 Sept 2026, 6:00 pmClosed
Garrison Engineer Naval Depot
Garrison Engineer Naval Depot Industrial Estate Post 104 Area Visakhapatnam 530007
REPAIRS TO JOINERY AND MISC WORKS AT SVN COLONY KEY PERSONNEL QTRS SITE A GE COMPLEX UNDER AGE BR I OF GE ND VISAKHAPATNAM
2026_MES_784787_1
8669/GEND/E8
Open Tender
Civil Works
Item Rate
180 days
Visakhapatnam
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Garrison Engineer Naval Depot
₹80,000
Yes
19 Sept 2026
17 Aug 2026
17 Sept 2026
17 Aug 2026
15 Sept 2026
1 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.01 | SCHEDULE 'A' PART-I: B/R WORKS | - | - | - | - |
| 1 | Taking down shutters of any description n exc 1 sqm each upto 9th floor | - | Per Leaf | 1.25 | - |
| 2Taking down shutters of any description exc 1sqm but n.exc 2 sqm upto 9th floor | |||||
| 3 | Taking down chowkats or frames not exc 1.5 sqm each without taking off shutters from the frame upto 9th floor. | - | Each | 100 | - |
| 4 | Taking down chowkats or frames exc 1.5 sqm but not exc 4 Sqm each without taking off shutters from the frame upto 9th floor | - | Each | 53 | - |
| 5 | Resecuring or easing & adjusting without taking down shutters of any description n.exc 1 Sqm each upto 9th floor | - | Per Leaf | 10 | - |
| 6 | Resecuring or easing & adjusting without taking down shutters of any description exc 1sqm but n.exc 2 sqm upto 9th floor | - | Per Leaf | 11 | - |
| 7 | Taking down shutters of any description n. exc 1 sqm each and refixing in same opening upto 9th floor | - | Per Leaf | 1.25 | - |
| 8Taking down shutters of any description exc 1sqm but n.exc 2 sqm each and refixing in same opening upto 9th floor | |||||
| 9 | S&F Mild steel Angles, bars, flats etc., as in supports for stiffening of fencing, wall ties, hold fasts, clamps, plain angle cleats for securing purlins and similar small articles confirming to Fe 410-0 or Fe-310-O upto 9th floor | - | Kg | 100 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
BOQ_879381.xls
BOQ • 0.38 MB
8669Tender.pdf
Tender Documents • 4.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .