Loading…
Loading…
Tender Value
₹2.9 L
EMD Value
₹5,892
Closing Date
1 Sept 2026, 6:00 pm6d left
EXEN REW BARAMULLA
EXEN REW BARAMULLA
Construction of 3 no culverts near LO GH Rasool dar ,LO Malik dar and HO Nawab dar and CO Concrete path near MASJID MUSTAFA SAIDPORA, Block ZAINGEER under ADP PRI GRANTS FOR THE Year 2026-27 Block -Zaingeer
2026_RDPR_320676_30
197 Xen/Rew/Bla/2026-27 Dated 12/08/2026
Open Tender
Civil Works
Percentage
30 days
BARAMULLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Rural Development and Panchayati Raj
₹5,892
12 Aug 2026
12 Aug 2026
2 Sept 2026
12 Aug 2026
1 Sept 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in weidth) Including disposil of excavated soil up to 1 Mtr and lift up to 1.50 Mtr | 17.15 | cum | - | - |
| 2 | Providing and laying of stone solling hand Packed including Carriage by Mt up to 30 Kms | 5.11 | cum | - | - |
| 3 | Providing and laying ofCement Concrete excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 0.99 | cum | 1 | ₹0.99 |
| 4 | Providing and laying ofCement Concrete excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | - | cum | - | - |
| 5 | Centering and shuttering including strutting, propping etc. and removal of it for foundation in Footing up to plinth level | 51.71 | sqm | - | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of it for suspending floors/ Slabs | 11.1 | sqm | - | - |
| 7 | Providing and laying of rainforment Cement Concrete excluding the cost of centring and shuttering. All work upto plinth level with 1:1.50:3 (1 cement : 1.50 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 5.07 | cum | - | - |
| 8 | Providing and Fixing of M/S rainforcement including cutting, bending and binding and placing in postion | 500 | kgs | 1 | ₹499.5 |
| 9 | structural steel for hand railing | 90 | kgs | - | - |
| 10 | back filling/approach fillng | 5.37 | cum | 1,000 | ₹5,370 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
BOQ_1067148.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].