| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LAdmitted-Finance | ₹7.9 L | L1 | Admitted-Finance |
| 2 | L2₹8.3 LAdmitted-Finance | ₹8.3 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | KP Nazar L1 | MINI ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling 22g carbon steel sheet cladding by unscrewing the fixed sheets without damages from all elevations and locations, fitted on pipe lines, vessels, tanks etc., including all labour charges, hire for tools, hire for scaffolding, all safety protection works to men, machineries, materials etc. including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete, | 100 | Sq.m | 440 ₹44,000 | 375 ₹37,500 |
| 2.00 | Dismantling the 50mm/75mm thick hot insulation from the existing position to facilitate the carrying out the maintenance works from all elevations and locations fitted on pipe lines, vessels, tanks etc including all labour charges, hire for tools, hire for scaffolding, all safety protection works to men, machineries, materials etc including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete., | 130 | Sq.m | 400 ₹52,000 | 330 ₹42,900 |
| 3.00 | Dismantling 100/120mm thick hot insulation from the existing position at all elevations and locations fitted on pipe lines, vessels, tanks etc, including all labour charges, hire for tools, hire for scaffolding, all safety protection works to men, machineries, materials etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete | 50 | Sq.m | 400 ₹20,000 | 360 ₹18,000 |
| 4.00 | Dismantling 150/200mm thick hot insulation from the existing position to facilitate the carrying out of the maintenance works at all elevations and locations fitted on pipe lines, vessels, tanks etc., including all labour charges, hire for tools, hire for scaffolding, all safety protection works to men, machineries, materials etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete | 45 | Sq.m | 400 ₹18,000 | 520 ₹23,400 |
| 5.00 | Fixing back 50mm/75mm thick hot insulation in position after the maintenance works of pipe lines, vessels, tanks etc., are over at all elevations and locations, including all labour charges, hire for tools, all protection works to men, machineries, materials etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete. (Required insulation materials such as mineral wool, chicken mesh, lacing wire etc., will be issued by TCC at free of cost). | 130 | Sq.m | 690 ₹89,700 | 530 ₹68,900 |
| 6.00 | Fixing back the 100/120mm thick hot insulation in position after the maintenance works of pipe lines, vessels, tanks etc., are over at all elevations and locations, including all labour charges, hire for tools, scaffolding, all protection works to men, machineries, materials etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete.(Required insulation materials such as mineral wool, chicken mesh, lacing wire etc., will be issued by TCC at free of cost). | 50 | Sq.m | 750 ₹37,500 | 590 ₹29,500 |
| 7.00 | Fixing back the 150/200mm thick insulation in position after the maitnenance works of pipe lines, vessels, tanks etc., are over at all elevations and locations, including all labour charges, hire for tools, scaffolding charges, all safety protection works to men and machineries etc. including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete(Required insulation materials such as mineral wool, chicken mesh, lacing wire etc., will be issued by TCC at free of cost). | 150 | Sq.m | 600 ₹90,000 | 780 ₹1.2 L |
| 8.00 | Fixing back 22g carbon steel cladding by using new/ old screws to pipe lines, vessels and tanks at all elevations and locations, including all labour charges, hire for tools, hire for scaffolding, all safety protection works to men, machineries, materials etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete. (Required used/new carbon steel sheet will be issued by TCC at free of cost). | 150 | Sq.m | 820 ₹1.2 L | 820 ₹1.2 L |
| 9.00 | Engaging Insulation Workers for executing miscellaneous works at all elevations and locations, including all labour charges, hire for tools, ESI, PF and all other benefits payable, all safety precautions etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete | 30 | Day | 1,900 ₹57,000 | 2,050 ₹61,500 |
| 10.00 | Providing 22g aluminium sheet cladding to process tanks, equipments, pipe lines as per standard practices and instructions at all elevations and locations upto 15M from finished floor level for all sizes, including cost of aluminium sheets, G.I. screws, fastners etc., all labour charges, hire for tools and plants, scaffolding, all safety precautions etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, equipment’s, pipe lines, cables etc., at contractors risk and cost, approved by TCC, all hire for hand cart/tempo van/lorry etc., complete | 55 | Sq.m | 1,950 ₹1.1 L | 2,350 ₹1.3 L |
Updated dates
Tender Value
Refer Docs
EMD Value
₹19,050
Closing Date
10 Feb 2026, 2:00 pmClosed
AGMMT
TCC LTD UDYOGAMANDAL KOCHI
Miscellaneous Hot Insulation works inside factory for a period of six months.
2026_TCCL_826764_1
TCCL/WC/C/1067/2026
Open Tender
Civil Works - Others
180 days
THE TRAVANCORE COCHIN CHEMICALS LTD
Please refer Tender documents
6 documents required · 6 mandatory
₹1,000
Yes
₹19,050
Yes
25 Feb 2026
10 Jan 2026
11 Feb 2026
10 Jan 2026
10 Feb 2026
10 Jan 2026
Dismantling 22g carbon steel sheet cladding by unscrewing the fixed sheets without damages from all elevations and locations, fitted on pipe lines, vessels, tanks etc., including all labour charges, hire for tools, hire for scaffolding, all safety protection works to men, machineries, materials etc. including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete,
Dismantling the 50mm/75mm thick hot insulation from the existing position to facilitate the carrying out the maintenance works from all elevations and locations fitted on pipe lines, vessels, tanks etc including all labour charges, hire for tools, hire for scaffolding, all safety protection works to men, machineries, materials etc including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete.,
Dismantling 100/120mm thick hot insulation from the existing position at all elevations and locations fitted on pipe lines, vessels, tanks etc, including all labour charges, hire for tools, hire for scaffolding, all safety protection works to men, machineries, materials etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete
Dismantling 150/200mm thick hot insulation from the existing position to facilitate the carrying out of the maintenance works at all elevations and locations fitted on pipe lines, vessels, tanks etc., including all labour charges, hire for tools, hire for scaffolding, all safety protection works to men, machineries, materials etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete
Fixing back 50mm/75mm thick hot insulation in position after the maintenance works of pipe lines, vessels, tanks etc., are over at all elevations and locations, including all labour charges, hire for tools, all protection works to men, machineries, materials etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete. (Required insulation materials such as mineral wool, chicken mesh, lacing wire etc., will be issued by TCC at free of cost).
Fixing back the 100/120mm thick hot insulation in position after the maintenance works of pipe lines, vessels, tanks etc., are over at all elevations and locations, including all labour charges, hire for tools, scaffolding, all protection works to men, machineries, materials etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete.(Required insulation materials such as mineral wool, chicken mesh, lacing wire etc., will be issued by TCC at free of cost).
Fixing back the 150/200mm thick insulation in position after the maitnenance works of pipe lines, vessels, tanks etc., are over at all elevations and locations, including all labour charges, hire for tools, scaffolding charges, all safety protection works to men and machineries etc. including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete(Required insulation materials such as mineral wool, chicken mesh, lacing wire etc., will be issued by TCC at free of cost).
Fixing back 22g carbon steel cladding by using new/ old screws to pipe lines, vessels and tanks at all elevations and locations, including all labour charges, hire for tools, hire for scaffolding, all safety protection works to men, machineries, materials etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete. (Required used/new carbon steel sheet will be issued by TCC at free of cost).
Engaging Insulation Workers for executing miscellaneous works at all elevations and locations, including all labour charges, hire for tools, ESI, PF and all other benefits payable, all safety precautions etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete
Providing 22g aluminium sheet cladding to process tanks, equipments, pipe lines as per standard practices and instructions at all elevations and locations upto 15M from finished floor level for all sizes, including cost of aluminium sheets, G.I. screws, fastners etc., all labour charges, hire for tools and plants, scaffolding, all safety precautions etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, equipment’s, pipe lines, cables etc., at contractors risk and cost, approved by TCC, all hire for hand cart/tempo van/lorry etc., complete
Providing 22g carbon steel sheets hot galvanized with a zinc coat of approximate 0.275kg/m2 for new cladding as per standard practices and instructions at all locations and elevations to pipe lines, vessels, tanks etc, including cost of treated sheets, G.I. screws, fastners etc., all labour charges, hire for tools and plants, scaffolding charges, all safety precautions etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
BOQ_1387051.xls
BOQ • 0.31 MB
tender1067.pdf
Tender Documents • 1.18 MB
Download all tender documents and submit your bid