Tender Value
₹2.5 Cr
EMD Value
₹2.5 L
Closing Date
13 Jul 2026, 6:00 pm5d left
EXECUTIVE ENGINEER VADODARA IRRIGATION DIVISION VADODARA
Providing Consultancy Services for Construction of New Weir On River Mahi in Desar Taluka, Vadodara District
316342
Tender Notice No. 05 of the year 2026-27
Open
Civil Works - Water Works
Vadodara
9 documents required · 9 mandatory
₹3,600
Executive Engineer Vadodara Irrigation Division Vadodara
₹2.5 L
22 Jun 2026
22 Jun 2026
22 Jun 2026
13 Jul 2026
22 Jun 2026
BILL OF QUANTITIES
BILLOFQUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and
are given to provide a common basis for bidding. The basis of payment will be the
actual quantities of work ordered and carried out, as measured by the Contractor
and verified by the Engineer and valued at the rates and prices tendered in the
priced Bill of Quantities, where applicable, and otherwise at such rates and prices
as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far
as it is otherwise provided under the Contract, include all constructional plant,
layout, supervision, materials, erection, maintenance, insurance, profit, taxes and
duties, together with all general risks, liabilities and obligations set out or implied
in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed
to enter a rate or price shall be deemed to be covered by other rates and prices
entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included
in the items provided in the priced Bill of Quantities, and where no Items are
provided the cost shall be deemed to be distributed among the rates and prices
entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant
sections of the contract documentation shall be made before entering rates or
prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Road and Bridge works. For building works specifications for
building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause-29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of
compressed air drilling for its removal, and which cannot be extracted by ripping
with a tractor of at least 150 kw with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50Cr.)
Name of Work: Providing Consultancy Services for Construction of New Weir On
River Mahi in Desar Taluka, Vadodara District.
Item Description of Item (with brief Quantity Unit Rate In Amount
No. specification and reference to figures
book of specifications)
1 Jungle cutting for preliminary surveys (a) 65000 Sqm 13.44
Light jungle cutting (bushes, hedges)
2 FLY Level for connecting an checking the 17 km 986
B.M With double levelling
3 Carrying out Sub soil investigation for Soil 360 Rmt 8672
Bearing Capacity test with machine
drilling of bore holes at specified location
including collection of samples, laboratory
testing, submitting report including
transport and others.
4 Carrying out Sub soil investigation for Soil 756 Rmt 12000
Bearing Capacity test with machine
drilling of bore holes at specified location
(in big river ex. Narmada) including
collection of samples, laboratory testing,
submitting report including transport and
5 calibrated echosounder for the assessment 312 Ha. 3500
of riverbed morphology, channel geometry
and sedimentation characteristics. The work
shall include the mobilization and
demobilization of suitable survey vessels or
boats and all associated survey equipment
at site by the contractor. The contractor
shall provide all vessels, qualified personnel,
tools, shackles, mounting frames, survey
instruments, positioning and navigation
systems, accessories, consumables, fuel,
power supply, and safety equipment
necessary for the complete execution of the
survey. The survey shall cover the full width
and length of the designated river reach
using a 5 mx 5 m survey grid, with proper
equipment calibration, water level
referencing, and quality control procedures.
The scope of work also includes processing
and analysis of the collected data to
generate bathymetric contour maps at 0.5 m
vertical intervals, longitudinal (L-section)
profiles along the river centerline, and
cross-sections at 30 m intervals. All
processed data shall be used to develop
digital bathymetric models and to evaluate
riverbed conditions and sediment
deposition patterns. The contractor shall
submit all deliverables, complete in all
respects, in both hard and soft copies,
including reports, drawings, digital models,
and raw survey data, in formats acceptable
to the Engineer.
6 Survey by using own DGPS instrument for 2402 Ha. 1248
the topographical and contour survey work
in 10x10 mt grid with 0.5mt contour
interval, locating all existing features with
preparation and submission of survey
drawing in AO size sheet in one Hard & soft
copy etc. complete.
7 Preparation of Pre-Feasibility Report 1 Job work 7200000
(PFR)and Detailed Project Report(DPR)for
the proposed Gated or Ungated Weir,
including development of preliminary
engineering design, preparation of relevant
drawings, preparation of detailed project
cost estimates and compilation of tender
documents for execution of the work under
Engineering, Procurement and Construction
(EPC) contract mode, based on the survey
data, investigations and studies carried out
under other items of this contract, and in
accordance with applicable codes, standards
and departmental guidelines, complete in all
respects and suitable for submission to the
concerned authorities for approval and
tendering purposes.
8 Providing Land Acquisition (LAQ) 1 Job work 800000
consultancy services for all land and assets
falling with in the submergence area of the
proposed weir. The scope includes side
identification and demarcation of the
submergence limits, verification of land
records, preparation of cadastral and
submergence maps, and preparation of
schedules of affected land parcels,
structures, and assets. All deliverables shall
be submitted complete in all respects in
both hard and soft copies.
Note: 1) The Service Charge can’t be in Minus Figure (-)/ Zero “0” and allowed up to one decimal only.
2) The Price quoted in the tender are Exclusive of GST and GST Will be paid Separately.
3) Time schedule should be followed as mentioned in section
I/We/am/are willing to carry out the work at… ................. %above/below percent (Should be
written in figures and words) of the estimated ate mentioned above Amount of my/our tender
works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………%below Add………%Above
In words In words
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book In In
of specifications) figures Words
(A)Total Tendered Amount
(B)Rebate on above tendered amount (if any) %(in figure) ………………………………
(C)Net Tendered Amount(A-B) (in figure) ………………………………
1 The Contractor shall exhibit a board with brief details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted asperprevailingrulesi.e.1%oftheworkdone.
3 GST and Income tax TDS will be deducted at a source while making payment so f bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as
per Govt.as stated in S.O.R. therefore in R.C.C. items where there is a change as per
actual mix design the cost of difference of cement consumption have been deducted
from the rate of original item at the rate of input rate mentioned in all the tender.
Sign Of Contractor Deputy Executive Engineer Executive Engineer
Irrigation Project Sub Div. No.21 Vadodara Irrigation Division
Vadodara Vadodara
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2. SBD of WEIR Desar.pdf
3. Item Wise specification Weir Desar.pdf
4. BOQ Weir Mahi River near varnoli.pdf
Corrigendum No. 1.pdf
CORRIGENDUM
Download all tender documents and submit your bid