| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1Accepted-AOC VPO SUNDERPURA TEH UCHANA 126115 | JIND | HARYANA | 126115 | ₹1 | 1 | Accepted-AOC ok |
| 2 | 1₹1Rejected-Finance MEHMUDPUR ROAD MEHMUDPUR ROAD 131301 | SONIPAT | HARYANA | 131301 | ₹1 | 1 | Rejected-Finance rejected |
| 3 | Not Admitted-Fee/PreQual/Technical 161 VPO RAJLU GARHI GANAUR 131101 | SONIPAT | HARYANA | 131101 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical FIRST FLOOR MEHMUDPUR ROAD RAM NAGAR GOHANA SONIPAT HARYANA 131301 | SONIPAT | HARYANA | 131301 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
13 Sept 2023, 11:00 amClosed
M.D
CH. DEVI LAL CO-OP. SUGAR MILLS LTD.
Tender CC flooring work of cane yard of sugar mill.
2023_HBC_309241_1
2
Open Tender
Miscellaneous
Works
30 days
Gohana
Please refer Tender documents.
2 documents required · 2 mandatory
₹320
Yes
₹1.4 L
Yes
27 Sept 2023
6 Sept 2023
13 Sept 2023
6 Sept 2023
13 Sept 2023
6 Sept 2023
Amount
Earth work in rough excavation by mechanical means over areas (exceeding 30 cm in depth,1.5 m in width as well as 10 sqm on plan )including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m as directed by engineer in charge. All kind of soil 4.14
Construction of granular subbase by providing material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with vibratory roller to achieve the desired density, complete as per technical clause 402 of MORT & H technical specifications. 17.13
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering _ all work below plinth level and up to floor iv level 1:4:8 (1 cement :2 coarse sand : 4 graded cum stone aggregate 40 mm nominal size) HSR 6.1.6
Centering and shuttering including strutting ,propping etc. and removal of form work for: Foundation ,footings, bases for columns 6.29.1
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering _ all work below plinth level and up to floor iv level 1:1.5:3 (1 cement :1.5 coarse sand : 3 graded cum stone aggregate 20 mm nominal size) it includes the work of flooring and divider
Dinesh Malik Contractor
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .