Executive Engineer, Sujlam Suflam Spreading Channel Dn.No.1, Himatnagar
Constructing of Pipe Drain across local drain at Varvada under submergence of Gorathiya Recharge Scheme.
304506
1 of 2026-27
Open
Civil Works
Works
Sabarkantha
6 documents required · 6 mandatory
₹2,400
The Executive Engineer, Sujlam Suflam Spreading Channel Dn.No.1, Himatnagar
₹90,000
13 May 2026
13 May 2026
13 May 2026
2 Jun 2026
13 May 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr. )
: : SCHEDULE - B : :
Name of Work :- Constructing of Pipe Drain across local drain at Varvada under submergence of Gorathiya Recharge
MEMORANDUM SHOWINGTHE DETAILS OF ITEM OF WORKS TO BE CARRIED OUT
Item Estimated Unit Item of works Rate In AMOUNT
No. Qty may Figure
1 1770 CM Excavation of canal in all sorts of soil including soft and hard murrum including 83.70
depositing the excated stuff in uniform layers in canal banks or as and where directed
etc complete in varying upto 500 mt. and with all lifts ( By Machinary) (b) Including
2 322 CM Providing and Laying in Position" NOMINAL MIX" cement concrete using cement, 3754.00
sand and crushed agreegate by mass and machine mix for C.C./R.C.C. work incl.
necessary formworks centering, scaffolding, compaction by vibrator,curing as
directed with all lead and lift etc complete Without Dewatering and excluding cost of
steel rainforcement.(d) C.C. Nominal Mix,M-15 and MSA 40mm
3(A) 1150 CM Providing & Laying in position "DESIGN MIX" cement concrete using cement sand 4638.00
and crushed aggregate for C.C./ R.C.C work by "FLORI" including necessary
formwork, centering, scaffolding, compaction by vibrator, curing as directed with all
lead & lift etc complete without dewatering and excluding the cost of steel
For Pier and Abutments / Wing wall / Head wall / Return wall / Dowel Wall etc (j)
Concrete grade M-20 and MSA-40 mm
3(B) 124 CM Providing & Laying in position "DESIGN MIX" cement concrete using cement sand 5470.00
and crushed aggregate for C.C./ R.C.C work by "FLORI" including necessary
formwork, centering, scaffolding, compaction by vibrator, curing as directed with all
lead & lift etc complete without dewatering and excluding the cost of steel
For Column / Beam / Solid Slab of Road Bridge / Barrel / Cutoff wall etc. (r)
Concrete grade M-25 and MSA-40 mm
4 8.90 MT Providing & Placing in position reinforcement bars including cutting, bending, 82019.00
welding joints where necessary,hooking etc. complete as per drawing for all lead and
lifts.(TMT / CRS (FE 500 D))
5 60 RMT Providing and fixing in position ( different diameter )NP3 class Reinforced Pipe With 5955.30
Clauking the joint with cement mortar 1:1 praportion using juke cement slurry
finishing joint and laying pipes o the design grade and levels curing etc complete for
all leads and lifts (NP-3 Class 1200 mm Dia.)
6 3740 CM Earth work in embankment using selected soil, soft & hard murrum excavated from 77.20
approved borrow area / village tanks etc. Including conveying, spreading in uniform
layers, breaking clods and dressing to the designed canal section etc. with lead upto
500 m and all lift .(For canal Having capacity Beyong 300 Cusecs)
7 214 CM Providing and laying rubble for appron ( each stone weighting not less than 40Kg. ) 1073.08
including and packing and filing in the interestices with quarry-spalls.
Total Amount - Rs
Total Amount - Rs
Total Amount in Words Rs. Rupees Eighty Nine Lacs Seventy Four Thousand Five Hundred Seventy One and Twenty Two Paisa Only
Total Amount in Words Rs. Rupees Eighty Nine Lacs Seventy Four Thousand Five Hundred Seventy One and Twenty Two Paisa Only
I/We am/are willing to carry out the work at % above / below (should bewritten
in figure and words) the tendered amount mentioned above. Amount of my / our tender work out as under:-
Tendered amount : Rs. Deduct /
Add % below / above : Rs. Net
1 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
2 GST and Income tax TDS will be deducted at a source while making payments of bills
3 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement Consumption/16/C
Date:11/05/2017 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item at the rate of input rate mentioned in all thetender.
4 all work shall be carried out as per Public works department Hand book and other specifications of Division or as directed
5 all the columns in schedule should be filled in ink and the total of the entries in the last columns should be struck by the contractors
under his signature
6 Rates quoted includes clearance of site (prior commencement of work and its closed) in all respect and hold good for work under all
condition. site moisture, weather etc.
Deputy Executive Engineer Executive Engineer
Signature of the contractor Suj.Suf.Sp.Canal Sub Dn.No.4/1, Suj.Suf.Sp.Ch. Dn.No.1,
Prantij Himmatnagar
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Final DTP.pdf
POL varvada.pdf
SBD Performance Security Clause changes.pdf
Schedule B.pdf
Tender Notice 01 of 2026-27 signed.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .