Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.2 CrAccepted-AOC | ₹4.2 Cr | 1 | Accepted-AOC Single tender approved by CE |
Tender Value
₹3.8 Cr
EMD Value
₹1 L
Closing Date
2 Dec 2024, 6:00 pmClosed
Superintending Engineer, Irrigation Central Circle
O/o The Superintending Engineer, Irrigation Central Circle, Thrissur - 680020.
Construction of seawall for a length of 500m in Punnayurkulam Panchayath - General Civil work.
2024_Irrig_692502_3
IRR/IA/TR/149/2022_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
540 days
Punnayurkulam Panchayath
Please refer Tender documents.
8 documents required · 8 mandatory
₹8,270
Yes
₹1 L
Yes
19 Feb 2025
22 Nov 2024
4 Dec 2024
22 Nov 2024
2 Dec 2024
22 Nov 2024
22 Nov 2024 - 2 Dec 2024
Amount
Seawall
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.47:Unified data for construction of Sea Wall as per Modified Design Suggested by CWPRS Pune - Providing filter of sea wall with woven fabric filter GWF-26-130 weight not less than 130gm/m2 pore size(mm) less than 0.075 with and overlap of 30cm at all joints stitched toghther pulled up in to folds uniformly and sufficiently in both direction for avoiding over extension of fibre of which it is composed and forming the toe to prevent scourage including conveyance and all leads and lifts etc. complete.
60.48:Unified Data for Construction of sea wall as per modified design suggested by CWPRS Pune- Providing sand cushion over geo fabric filter by depositing and spreading sea sand in suitable layers with all leads and lifts etc. complete as per the direction of the departmental officers at site.
60.49.5:A.S.E works as per CWPRS DESIGN- Thrissur - Supplying at site of work granite stones 10 Kg to 80 Kg (75% 10 to 25 Kg ie 5 to 11 Dm3 and 25 % 25 to 80 Kg ie 11 to 34 Dm3 ) and stacking for measurement including cost and conveyance loading and unloading charges all other incidental charges all leads and lifts etc complete.
60.50:Unified Data for construction of sea wall as per Modified design suggested by CWPRS Pune -Carriage of departmental granite stones 10kg to 80kg , 5 to 34 dm3(75% 10 to 25 kg, 25% 25 to 80kg) in size from stack at site and dumping in position to lines and levels including all leads and lifts etc. complete.
60.51.5:A.S.E works as per CWPRS DESIGN- Thrissur- Supplying at site of work granite stones 80 to150 kg(34 to63 dm3) 50%(34 to 48 dm3) 50% 48 to 63 dm3 in size and stacking for measurement including cost conveyance loading and unloading charges all leads and lifts etc complete.
60.52:Unified Data for Construction of sea wall - as per Modified Design suggested by CWPRS Pune- Carriage of departmental granite stones 80kg to150 kg (34 dm3 to 63dm3) 50% (34 to 48 dm3) 50% ( 48to 63 dm3) in size from stack at site and dumping in position to lines and levels including all leads and lifts etc complete.
OD11896/2024-2025:A.S.E works as per CWPRS DESIGN- Thrissur-Supplying at site of work granite stones of size150 to300 kg, 50% more than 225kg as of specific gravity not less than 2.65 as per the approved design, including supply of stone, loading from the quarry, conveying to the site in tipper and unloading at site , weighing for measurement using weigh bridge installed at site by the contractor at contractors own expense etc complete as per the directions of the departmental officers at site.
OD12128/2024-2025:Unified data - Construction of sea wall- as per Modified design suggested by CWPRS Pune - Dumping in position (to be packed ) Granite stones 150kg to 300kg in size suitably to form the armour course of sea wall as per the approved design (dumping with a lead up to 50m) using rail track or pneumatic type equipment with cranes or winches or by any other method
OD17458/2024-2025:Unified data for construction of sea wall- as per Modified design suggested by CWPRS Pune -Dumping in position ( not to be packed ) Granite stones 150 kg to 300kg in size suitably to form the armour course of sea wall as per the approved design ( dumping with a lead up to 50m) using rail track or pneumatic type equipment with cranes or winches or by any other method
OD11898/2024-2025:A.S.E works as per CWPRS DESIGN- Thrissur: Supplying at site of work granite stones of size 300 to 400 Kg (50% more than 350Kg) weighing for measurement using weigh bridge installed at the site by the contractor at contractor's own expense etc. complete as per the direction of departmental officers at site.- For sea wall.
OD12127/2024-2025:Unified Data for construction of sea wall -as per Modified design suggested by CWPRS Pune -Dumping in position (not to be packed) Granite stones 300kg to 400kg 50% more than 350kg in size suitably to form the armour course of sea wall as per the approved design (dumping with a lead up to 50m) using rail track or pneumatic type equipment with cranes or winches or by any other method
Bidder Name
Mohammed Ashraf KG
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1110144.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .