Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.3 LAccepted-AOC | ₹25.3 L | L1 | Accepted-AOC Agreement Executed |
| 2 | Rejected-Technical | - | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | JAISAL T L1 | HANEEFA P V L2 |
|---|---|---|---|---|---|
| 1.00Toilet Constraction | |||||
| 1.00 | 2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | 1 | each | 2,254.34 ₹2,254.34 | 2,367.06 ₹2,367.06 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 139.68 | cum | 330.41 ₹46,151.67 | 346.93 ₹48,459.18 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 17.59 | cum | 7,286.51 ₹1,28,133.28 | 7,650.84 ₹1,34,540.02 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 37.01 | sqm | 354.69 ₹13,126.37 | 372.42 ₹13,782.52 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 31.03 | cum | 9,634.13 ₹2,98,947.05 | 10,115.84 ₹3,13,894.52 |
| 1.01 | OD265464/2025-2026:DRY RUBBLE MASONRY with hard stone, including Through/Bond stone in foundation and
superstructure including packing to compactness to lines and levels, cost and conveyance of all
materials labour charges etc. complete as per approved drawing and relevant technical
specifications | 7.65 | cum | 4,186.9 ₹32,029.79 | 4,396.25 ₹33,631.31 |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 101.26 | sqm | 700.72 ₹70,954.91 | 735.76 ₹74,503.06 |
| 1.01 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 23.02 | cum | 12,346.86 ₹2,84,162.98 | 12,964.2 ₹2,98,371.06 |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 52.8 | sqm | 926.37 ₹48,912.34 | 972.69 ₹51,358.03 |
Tender Value
₹25.4 L
EMD Value
₹50,000
Closing Date
15 Oct 2025, 10:00 amClosed
SUPERINTENDING ENGINEER
O/o SE, Kozhikode Corporation, [email protected]
Please refer Tender document
2025_LSGD_805954_1
PP/EG7/2025-26/SE/387
Open Tender
Civil Works - Buildings
300 days
Kozhikode Corporation
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
23 Jun 2026
6 Oct 2025
15 Oct 2025
6 Oct 2025
15 Oct 2025
6 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1342078.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid