Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAccepted-AOC 59 8E CROSS ROAD ATTIGUPPE WEAVERS COLONY NEAR GOVT PU COLLEGE VIJAY NAGAR BANGALORE 560 040 | BANGALORE | BENGALURU URBAN | KARNATAKA | 560040 | ₹2.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.8 CrRejected-Finance | ₹2.8 Cr | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical ALAPPUZHA | ALAPPUZHA | KERALA | 686534 | - | - | Rejected-Technical Documents not as per SQC |
| Sl No | Description | Qty | Unit | MEDIGAS SYSTEMS L1 | RAJEEV P I L2 |
|---|---|---|---|---|---|
| 1.00MGPS WORKS | |||||
| 1.01 | OD64907/2025-2026: OXYGEN SYSTEM: Supply, Installation, Testing and commissioning of 16 cylinder (8 + 8) Oxygen manifold supply with all necessary controls and safety fittings. | 1 | set | 80,071.61 ₹80,071.61 | 1,01,699.56 ₹1.0 L |
| 1.02 | OD64913/2025-2026:OXYGEN SYSTEM; Supply, Installation, Testing and commissioning of 1500 lpm deliver capacity manifold control panel, control panel should have all necessary controls and safety fittings. | 1 | set | 1,20,189.06 ₹1.2 L | 1,52,653.05 ₹1.5 L |
| 1.03 | OD64912/2025-2026:OXYGEN SYSTEM: Supply, Installation, Testing and commissioning of 1 x 6 cylinder Oxygen manifold supply (Emergency reserve oxygen supply) with all necessary controls and safety fittings. | 1 | set | 44,998.67 ₹44,998.67 | 57,153.16 ₹57,153.16 |
| 1.04 | OD64911/2025-2026: OXYGEN SYSTEM: Supply, Installation, Testing and commissioning of Surface mounted front loading Oxygen outlets as per HTM/ EN / NFPA (first and second fix assembly) | 104 | no | 2,206.74 ₹2.3 L | 2,802.8 ₹2.9 L |
| 1.05 | OD64914/2025-2026: NITROUS OXIDE SYSTEM; Supply, Installation, Testing and commissioning of 4 cylinder (2 + 2) Nitrous Oxide manifold supply with all necessary controls and safety fittings. | 1 | set | 35,006.62 ₹35,006.62 | 44,462.17 ₹44,462.17 |
| 1.06 | OD64922/2025-2026: NITROUS OXIDE SYSTEM: Supply, Installation, Testing and commissioning of 2 cylinder Nitrous Oxide manifold supply (Emergency reserve Nitrous Oxide supply) with all necessary controls and safety fittings. | 1 | set | 20,000.48 ₹20,000.48 | 25,402.77 ₹25,402.77 |
| 1.07 | OD64921/2025-2026: NITROUS OXIDE SYSTEM: Supply, Installation, Testing and commissioning of 500 lpm deliver capacity manifold control panel (Semi Auto Matic), control panel should have all necessary controls and safety fittings. | 1 | set | 1,05,020.31 ₹1.1 L | 1,33,387.1 ₹1.3 L |
| 1.08 | OD64920/2025-2026: NITROUS OXIDE SYSTEM: Supply, Installation, Testing and commissioning of Surface mounted front loading outlets as per HTM/ EN / NFPA (first and second fix assembly) | 7 | no | 2,206.74 ₹15,447.19 | 2,802.8 ₹19,619.60 |
| 1.09 | OD64919/2025-2026: MEDICAL AND SURGICAL AIR SYSTEM: Supply, Installation, Testing and commissioning of air cooled silenced reciprocating oil free air compressors, each with 5 hp motor capacity. Total estimated demand for the plant is 600 lpm. The compressor should have all necessary controls and safety fittings. | 2 | set | 3,25,115.17 ₹6.5 L | 4,12,931.27 ₹8.3 L |
Tender Value
₹2.3 Cr
EMD Value
₹1 L
Closing Date
23 Sept 2025, 1:00 pmClosed
PROJECT DIRECTOR
The office of The Project Director, 1st Floor, JP Krishna Building, Pallimukku, Pettah Trivandrum - 695024
Construction of Critical Care Building at GMC Kalamassery, Ernakulam- Phase 3
2025_WAPCO_791467_1
WAP/INFRA/KERALA/2025/KLSY/515
Open Tender
Miscellaneous Works
120 days
Kalamaserry
As per Tender Document
22 documents required · 22 mandatory
₹8,850
₹1 L
27 Mar 2026
26 Aug 2025
24 Sept 2025
26 Aug 2025
23 Sept 2025
9 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
DNIT.pdf
Tender Documents • 9.83 MB
BOQ_1305087.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid