| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹26.7 L+₹23.3 L (688.1%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | M. V. JOSE L1 | JORDIN K JOY L2 |
|---|---|---|---|---|---|
| 1.00WELL MAINTENANCE | |||||
| 1.00 | OD351765/2025-2026:mancoolies | 9 | each | 1,082.18 ₹9,739.62 Lowest | 4,578 ₹41,202 |
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 48 | hour | 345.54 ₹16,585.92 Lowest | 2,354 ₹1,12,992 |
| 1.00 | 5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural
sources derived from natural
sources: 3 graded stone aggregate 20 mm nominal size derived from natural
sources derived from natural
sources) | 7.69 | cum | 9,847.37 ₹75,696.73 | 3,200 ₹24,598.4 Lowest |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 491.97 | kilogram | 112.43 ₹55,311.96 Lowest | 1,978 ₹9,73,112.7 |
| 1.00 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining | 150.53 | sqm | 308.96 ₹46,508.06 Lowest | 5,478 ₹8,24,608.82 |
| 1.01 | 23.5:Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer -in- charges | 13.21 | cum | 1,633.11 ₹21,576.65 | 1,290 ₹17,043.48 Lowest |
| 1.01 | 23.6:Supplying, filling, spreading & leveling gravels of size range 5 mm to 10 mm, in the recharge pit,over the existing layer of boulders, in required thickness, for all leads & lifts, all complete as per direction of Engineer -in-Charge | 8.81 | cum | 1,641.49 ₹14,458.24 | 761 ₹6,702.89 Lowest |
| 1.01 | 50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 5.26 | cum | 7,713.54 ₹40,542.37 Lowest | 7,986 ₹41,974.42 |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 53.99 | sqm | 369.76 ₹19,963.34 Lowest | 7,792 ₹4,20,690.08 |
Tender Value
₹3.4 L
EMD Value
₹8,463
Closing Date
5 Jan 2026, 10:00 amClosed
Anju Antony
AE, LID EW, ALANGAD GP
Annual Plan-Pro No 209/26 Maintenance of Public Well-Alangad GP-General Civil Work
2025_LSGD_814165_2
209/26/AE/ALGD/7
Open Tender
Civil Works - Others
Item Rate
180 days
ALANGAD GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹750
Yes
₹8,463
Yes
10 Mar 2026
29 Dec 2025
6 Jan 2026
29 Dec 2025
5 Jan 2026
29 Dec 2025
WELL MAINTENANCE
OD351765/2025-2026:mancoolies
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural sources derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining
23.5:Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer -in- charges
23.6:Supplying, filling, spreading & leveling gravels of size range 5 mm to 10 mm, in the recharge pit,over the existing layer of boulders, in required thickness, for all leads & lifts, all complete as per direction of Engineer -in-Charge
50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tendernotice_2.pdf
PDF • 0.19 MB
Tendernotice_3.pdf
PDF • 0.19 MB
AFFIDAVIT.pdf
Tender Documents • 0.17 MB
PreliminaryAgreement.pdf
Tender Documents • 0.32 MB
viewsbdPublicWell.pdf
Tender Documents • 1.94 MB
bidsubmissionform.pdf
Tender Documents • 0.18 MB
BOQ_1381779.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .