Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAccepted-Finance RUDRANAGAR P S SAGAR 24 PARGANAS SOUTH | L1 | Accepted-Finance Accepted-lowest | |
| 2 | L2₹2.3 L+₹2,245 (1.01%)Rejected-Finance PURBA BARDHAMAN | PURBA BARDHAMAN | WEST BENGAL | 712134 | L2 | Rejected-Finance Regretted-rate is high | |
| 3 | L3₹2.3 L+₹3,368 (1.51%)Rejected-Finance BIDHAN MARKET BARASAT | BARASAT | L3 | Rejected-Finance Regretted-rate is high | |
| 4 | Rejected-Technical NOT FOUND | - | Rejected-Technical Regretted-Insufficient documents submitted. | |
| 5 | Rejected-Technical 8D 1 RAJANI BHATTACHARJEE LANE KOLKATA 700026 | KOLKATA | WEST BENGAL | 700026 | - | Rejected-Technical Regretted- Insufficient Doc. Submitted. |
| Sl No | Description | Qty | Unit | NITESH MANAGEMENT L1 | TECHNO FAITH L3 | HAZRA ENTERPRISE L2 |
|---|---|---|---|---|---|---|
| 1.00Day-to-day operation of Pump Motor Set for every day 2 (two) shifts including all sorts of minor / normal maintenance of pump, motor, switch panel of pump etc. with lifting & lowering of submersible pump if required as per the direction of Engineer-in-Charge within the entire compound of at Presidency University Girls’ Hostel, BF-141, Salt Lake. | ||||||
| 1.01 | Profit / Service Charges
Semi-skilled Labour for operation of pump motor sets.
all Days = 365 days x 1 = 365 man days. | 365 | Man Days | 0 ₹2,23,336 Lowest | 0.01 ₹2,26,686 | 0.01 ₹2,25,569 |
| 1.02 | Overall checkup for entire pump motor set, repair work of motor starter, main switch, panel board etc. including minor repair pump motor set. at regular interval as per direction by the Engineer-in-Charge. | 12 | Month | - | 1.5 ₹18 | 1 ₹12 Lowest |
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
31 Jan 2024, 2:00 pmClosed
EE BNWD
Room No.124 1ST FLOOR PURTA BHAVAN D.F. BLOCK SECTOR I SALT LAKE KOLKATA 700 091.
Day to Day Operation of different types of Pump motor sets including minor repair works of the same at Saishali and Juvenile Court Building under Salt Lake in 1 (One) shift. during the year 2023-2024.
2024_WBPWD_649845_1
WBPWD/EE/BNWD/NIQ32e/2023-2024
Open Tender
CIVIL WORKS
Item Rate
365 days
Salt Lake
Please refer Tender documents.
4 documents required · 4 mandatory
₹6,000
Yes
9 Sept 2026
19 Jan 2024
2 Feb 2024
19 Jan 2024
31 Jan 2024
22 Jan 2024
Amount
Day-to-day operation of Pump Motor Set for every day 2 (two) shifts including all sorts of minor / normal maintenance of pump, motor, switch panel of pump etc. with lifting & lowering of submersible pump if required as per the direction of Engineer-in-Charge within the entire compound of at Presidency University Girls’ Hostel, BF-141, Salt Lake.
Profit / Service Charges Semi-skilled Labour for operation of pump motor sets. all Days = 365 days x 1 = 365 man days.
Overall checkup for entire pump motor set, repair work of motor starter, main switch, panel board etc. including minor repair pump motor set. at regular interval as per direction by the Engineer-in-Charge.
HAZRA ENTERPRISE
TECHNO FAITH
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .