Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.5 LAccepted-Finance VILLAGE THAROT PO CHARRI TEHSIL SHAHPUR DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 176001 | ₹7.5 L | L1 | Accepted-Finance Due to lowest rate |
| 2 | L2₹7.6 LRejected-Finance | ₹7.6 L | L2 | Rejected-Finance Due to highest rate |
| 3 | L3₹7.6 LRejected-Finance DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 176001 | ₹7.6 L | L3 | Rejected-Finance Due to highest rate |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-The contractor has submit an application on dated 23/03/2026 vide which he has requested to do not open his tender due to quoted some wrong rates. |
| Sl No | Description | Qty | Unit | PUNIT KUMAR L1 | SUMMY SHARMA L2 | SANJAY KUMAR L3 |
|---|---|---|---|---|---|---|
| 1.00 | Operation and Maintenance of water supply scheme as a whole including cost of all labour to be deployed i.e. Pump Operator, Assistant Pump Operator, Chowkidar, Beldar, Fitter or any other skilled/un-skilled labour contigent to the work, watch and ward of all departmental assets, treatment of water as per manual of CPHEEO/IS code and specification, maintenance of source, regarding running of pumping machinery. The job shall include cost of all major, minor repairs of pumping machinery and electrical installation such as rewinding of motors, lubrication, replacement of impeller,Kit kat, HRC fuses gland dori and other essential items required etc. required for repair during the sudden shut down of pumping machinery as per direction of Engineer-in-charge. | 1 | Job | 53,000 ₹53,000 | 55,500 ₹55,500 | 51,900 ₹51,900 |
| 1.01Pumping Machinery installed for Ph-I stage 1). | ||||||
| 1.02Pump Detail (i) Pump Make = Kirloskar set 2 x 5 = 10 HP (one act as stand by ) | ||||||
| 1.03Discharge = 8.04 LPS, Total Head 104.60 Mtrs., Rising Main 80 mm dia Pumping Hours 9 to 10 Hours | ||||||
| 1.04Pumping Machinery installed for Ph-II). | ||||||
| 1.05Pump Detail (i) Pump Make = Kirloskar set 2 x 30 = 60 HP (one act as stand by ) | ||||||
| 1.06Discharge = 8.04 LPS, Total Head 104.60 Mtrs., Rising Main 80 mm dia Pumping Hours 9 to 10 Hours | ||||||
| 1.07(Total Working HP =35 HP) | ||||||
| 2.00 | Development of Labour at pump house for oprating pumping machinery & ward and watch of pumping machinery with in 5 mtrs aroung the pump house etc Annexture Attached (A) | 1 | Job | 7,00,000 ₹7 L | 7,00,200 ₹7.0 L | 7,05,000 ₹7.0 L |
Tender Value
₹7.5 L
EMD Value
₹15,029
Closing Date
23 Mar 2026, 11:00 amClosed
Executive Engineer
Jal Shakti Division Shahpur
A/R and M/O LWSS Tharot Bhatechh in Tehsil Shahpur, Distt. Kangra, (HP)
2026_HPIPH_130935_1
EE/JSDS/NIT/2025-11140-89 dated- 09/03/2026
Open Tender
Civil Works
365 days
Shahpur
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Executive Engineer
₹15,029
9 Apr 2026
10 Mar 2026
23 Mar 2026
10 Mar 2026
23 Mar 2026
10 Mar 2026
10 Mar 2026 - 23 Mar 2026
Operation and Maintenance of water supply scheme as a whole including cost of all labour to be deployed i.e. Pump Operator, Assistant Pump Operator, Chowkidar, Beldar, Fitter or any other skilled/un-skilled labour contigent to the work, watch and ward of all departmental assets, treatment of water as per manual of CPHEEO/IS code and specification, maintenance of source, regarding running of pumping machinery. The job shall include cost of all major, minor repairs of pumping machinery and electrical installation such as rewinding of motors, lubrication, replacement of impeller,Kit kat, HRC fuses gland dori and other essential items required etc. required for repair during the sudden shut down of pumping machinery as per direction of Engineer-in-charge.
Pumping Machinery installed for Ph-I stage 1).
Pump Detail (i) Pump Make = Kirloskar set 2 x 5 = 10 HP (one act as stand by )
Discharge = 8.04 LPS, Total Head 104.60 Mtrs., Rising Main 80 mm dia Pumping Hours 9 to 10 Hours
Pumping Machinery installed for Ph-II).
Pump Detail (i) Pump Make = Kirloskar set 2 x 30 = 60 HP (one act as stand by )
Discharge = 8.04 LPS, Total Head 104.60 Mtrs., Rising Main 80 mm dia Pumping Hours 9 to 10 Hours
(Total Working HP =35 HP)
Development of Labour at pump house for oprating pumping machinery & ward and watch of pumping machinery with in 5 mtrs aroung the pump house etc Annexture Attached (A)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
technical_193603.pdf
techsummary_193603.pdf
finance_193603.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
Form6and12.pdf
Tender Documents • 1.26 MB
Termsandconditions.pdf
Tender Documents • 0.18 MB
BOQ_193603.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid