| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.9 LAccepted-Finance | ₹20.9 L | L1 | Accepted-Finance L1 |
| 2 | L2₹20.9 LAccepted-Finance | ₹20.9 L | L2 | Accepted-Finance L2 |
| Sl No | Description | Qty | Unit | SHABEER K.K. L2 | P P SUBAIR L1 |
|---|---|---|---|---|---|
| 1.00Detailed estimate | |||||
| 1.00 | 3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m) | 142.28 | cum | 65.43 ₹9,309.05 | 65.28 ₹9,287.71 |
| 1.00 | 2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means | 1.6 | cum | 795.73 ₹1,273.17 | 794.03 ₹1,270.45 |
| 1.00 | 2.4.4.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Rubble stone masonry in cement mortar. | 9.6 | cum | 803.76 ₹7,716.10 | 802.04 ₹7,699.58 |
| 1.00 | 3.8.B:Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal within all lifts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. Manual Method | 2.79 | cum | 3,261.06 ₹9,098.36 | 3,254.11 ₹9,078.97 |
| 1.00 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 92.69 | cum | 7,300.54 ₹6.8 L | 7,284.99 ₹6.8 L |
| 1.01 | 12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15 | 71.82 | cum | 8,447.94 ₹6.1 L | 8,429.95 ₹6.1 L |
| 1.01 | 12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer | 23.5 | cum | 9,175.14 ₹2.2 L | 9,155.6 ₹2.2 L |
| 1.01 | 12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork) | 23.5 | cum | 8,822.26 ₹2.1 L | 8,803.47 ₹2.1 L |
| 1.01 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications | 2.96 | MT | 99,876.55 ₹3.0 L | 99,663.85 ₹3.0 L |
Tender Value
₹19.4 L
EMD Value
₹48,482
Closing Date
27 Feb 2026, 2:00 pmClosed
Executive Engineer
Executive Engineer,PWD Roads Division Manjeri
GENERAL-Flood damage 2022-23 Reconstruction of damaged culvert and drainage work at 8/300 of Omanoor Kuzhimanna road -Civil work-General Civil Work-1
2026_PWD_830931_2
D5/PWD/RB/TR/14898/2025
Open Tender
Civil Works - Roads
120 days
Kondotty
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹48,482
Yes
5 Mar 2026
20 Feb 2026
2 Mar 2026
20 Feb 2026
27 Feb 2026
20 Feb 2026
Detailed estimate
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means
2.4.4.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Rubble stone masonry in cement mortar.
3.8.B:Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal within all lifts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. Manual Method
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
13.9.A:Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Granular material
8.8:Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
55.10.1:Providing and erecting retro-reflectorised Object Hazard Marker 300mm x 900mm Providing and erecting retro-reflectorised Object Hazard Marker sign with 07 years warranty, manufactured as per IRC 67 USING Type IV ASTM D 4956-09 micro prismatic retro reflective sheeting fixed over aluminium sheetig, 2 mm thick / aluminium composit material sheeting 4 mm thick with suitable back support frame and supported on a mild steel angle iron post 75mmx75mmx6mm, firmly fixed 30cm above ground level by means of properly designed foundation with M 15 grade cement concrete 30cmx30x45cm, 45cm below ground level including painting all non-reflective faces with epoxy paint 2 coats over epoxy primer as per approved drawing and clause 801.300 mm x 900 mm
OD107397/2022-2023:PVC WEEP HOLES- providing weep holes using 75 mm dia. PVC pipes working pressure 4 kg/s
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1412427.xls
BOQ • 0.31 MB
RetenderNIT.pdf
Tender Documents • 0.03 MB
viewsbdmerge.pdf
Tender Documents • 1.77 MB
Eeep.pdf
Tender Documents • 0.06 MB
PreAgmntFormat_New.pdf
Tender Documents • 0.30 MB
integrity_pact.pdf
Tender Documents • 0.05 MB
form_of_tender.pdf
Tender Documents • 0.18 MB
Download all tender documents and submit your bid