Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹30 L
EMD Value
₹30,000
Closing Date
29 Jan 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Manager (North West Zone)
Providing , Supplying and Laying Wetmix at Drainage line & Water line Exacavation Area And Labour work of laying Hotmix Material Patch work at TP Area And Other Area in Ghatlodia ward North West Zone. (A.R.C.)
267571
345-7/2025-26
Open
Civil Works
Works
Ahmedabad
3 documents required · 3 mandatory
₹1,500
Yes
Municipal Commissioner, Ahmedabad
₹30,000
Yes
21 Jan 2026
21 Jan 2026
21 Jan 2026
29 Jan 2026
21 Jan 2026
Name of Work :- Providing , Supplying & Laying Wetmix at Drainage line & Water line
Exacavation Area And Labour work of laying Hotmix Material Patch work at TP Area And
Other Area in Ghatlodia ward North West Zone. (A.R.C.)
Sr. Quantity Item Description Rate Per Amount
Extra Rate Over Item of Excavation of Earth for
excavation of asphalt pavement / RCC of thickness up
1 to 0.20 meter including demolishing the asphalt
carpet, metal,s oiling/cutting Reinforcement etc.comp.
with stacking the material as directed. (Based on
Previously approved rate by C E sir )
a 15.00 up to 0.20 meter thickness (By Manual) 71.10 Smt
0.20 to 0.30 meter (By any type of Breaker Machine
b 150.00 or R.C.C.Cutter machine including cost of operator, 177.76 Smt
fuel, & transportation etc complete.
0.30 meter & above (By any type of Breaker Machine
c 10.60 or R.C.C.Cutter machine including cost of operator, 311.08 Smt
fuel, & transportation etc complete.
Barricading the entire break down or excavated area
on rental basis using wooden ballies / M.S.angles at max.
2.00 meter centre to centre, C.G.I. Sheet, reflective paint /
Board out side to avoid accident & for smooth traffic
2 70.00 diversion & movement including cautionary board etc. 79.99 Rmt
Item also includes for making temporary sufficient nos
of lighting arrangement through out the work with
necessary required arrangement. The same shall be
removed after completion of work.
Box cutting the road surface to proper slope and camber
for making a base for road work including removing
the excavated stuff and depositing on the road side
slope as directed upto 200 Mt.lead
Conveyance charge of earth, lime, murrum, building
rubbish, manure, garbage, sludge, excavated rock, fly ash,
aggregates of any kind executed outside the road
site. Rate also includes spreading & levelling etc
complete. Internal conveyance above 50 mt done
within the work site is not payable.
a 10.00 Lead Up to 1 KM 256.16 Cmt
b 10.00 Lead Up to 1.5 KM 268.12 Cmt
c 10.00 Lead Up to 2 KM 278.18 Cmt
d 10.00 Lead Up to 2.5 KM 287.46 Cmt
e 1080.00 Lead Up to 3 KM 296.43 Cmt
Rolling of Earth Work in layers with power roller including
5 405.00 spreading of earthwork and filling in depressions which 13.27 Cmt
occurs during the process. SOR 23-24 IT NO 26002A
6 405.00 Watering of Earth as Directed. SOR 23-24 IT NO 26003 8.99 Cmt
Construction of granular Sub base using crusher run,
spreading in uniform layers with motor grader on
prepared surface mixing by mix in place method with front
end loader at OMC and compacting with vibratory roller to
achieve the desired density, complete as per tender
specification. For all grade.
a 405.00 Production & Supply of GSB (Crusher Run) 1763.00 Cmt
b 405.00 Laying of GSB (Crusher Run) 30.00 Cmt
Providing, laying, spreading and compacting graded stone
aggregate to wet mix macadam specification including
premixing the Material with water at OMC in mechanical
8 mix plant carriage of mixed Material by tipper to site, 2010.00
laying in uniform layers in sub- base / base course on well
prepared surface and compacting with vibratory roller to
achieve the desired density as per Codal Provision.
a 675.00 Production & Supply of WMM 1975.00 Cmt
b 675.00 Laying of WMM 35.00 Cmt
Providing and applying Primer Coat with cationic
bitumen emulsion SS1 grade conforming to ASTM
GRADE on prepared surface of wet mix macadam
including clearing of Wet mix macadam surface with air
compressor to remove all loose material other foreign
material. The primer shall be sprayed uniformly at the
rate of 0.70-1.0 kg/sqm. It shall be applied by a self-
propelled or towed bitumen pressure sprayer,
equipped for spraying the material uniformly at a
specified rate. No dilution or heating at site of SS1
bitumen emulsion shall be permitted. (As Per Road
Labour charges for hand laying hotmix material
DBM/BC on the road surface in line & level incl.
cleaning the surface with Air Compressor and if require re
carting material by JCB at necessory place of work
10 324.00 also rolling with 8-10 Tonnes Vibratory Roller and Dust 449.68 MT
spreading on BC after rolling, rate also includes re-
carting of Hotmix material from place of Work/AMC store
to Location of laying having narrow width like chawls,
poles, gamtal roads etc. complete. (As Per Road Tender)
Hiring of Tractor with trolley considering 8 Hrs. As
11 8.00 working Day hours inclu. Driver (GWSSB SOR-2022-23 2104.09 Day
Section-2E- Miscellenous Item No.7)
Providing and supplying of labour for necessary
manual excavation, cleaning, Shifting of Material Or any
other, or for any other work as directed by Engineer In
charge. The Rate includes Handcart with Mazdoor
32.00 Labour charges - Mazdoor 500.50 EACH
8.00 Labour charges - Supervision for Machinery 711.00 EACH
Providing & Supplying JCB Machine on rental basis
in case of emergency situation and break down type
work & also during unavoidable condition as per
13 24.00 instruction of Engg. In Charge, rate includes all nece. 600.00 Hour
Shifting, fuel and operating charges and stacking of
useful & non-useful materials separately up to store.
(As per previous tender Rates)
Bitumen Cutting Labour charge of cutting in
bituminous pavement. Cutting to be done with heavy
duty tandom cutting machine consist of diamond blade.
Minimum cutting depth shall be 75 mm from the finished
level. Cutting shall be perfeclty in line. The width and
depth of the removal of asphalt towards kerb stone
shall be as per the drawing. Bitumen shall be carefully
removed so that the the cutting edge towards the road
should not be disturbed. The work of removal of the
asphalt will be considered in this item as running
meter of the cutting done by machine. One cutting line
will be considered per length of the kerb stone. Bitumen
and other debris shall be disposed within 10.0 km. as per
the instruction of the engineer in charge. Surroundings
shall be cleaned to the satisfaction of the engineer in
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
T.No.345 Tender PDF.pdf
T.No.345 Abstract pdf.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .