| 1 | L-1₹1.4 LAccepted-Finance HIMACHAL PRADESH HP | KANGRA | HIMACHAL PRADESH | 176204 | L-1 | Accepted-Finance Lowest-1 | |
| 2 | L-2₹1.5 L+₹9,856 (6.88%)Rejected-Finance CHENAB VALLEY DIVISION HPPWD UDAIPUR HIMACHAL PRADESH | CHAMBA | HIMACHAL PRADESH | 176207 | L-2 | Rejected-Finance Lowest-2 | |
| 3 | L-3₹1.7 L+₹26,069.20 (18.2%)Rejected-Finance | L-3 | Rejected-Finance Lowest-3 | |
| 4 | L-4₹1.7 L+₹26,134.31 (18.2%)Rejected-Finance BANIKHET NAVEEN KUMAR BANIKHET CHAMBA HIMACHAL PRADESH 176303 | CHAMBA | HIMACHAL PRADESH | 176303 | L-4 | Rejected-Finance Lowest-4 | |
| 5 | L-5₹1.8 L+₹33,535 (23.4%)Rejected-Finance | L-5 | Rejected-Finance Lowest-5 |
| Sl No | Description | Qty | Unit | HANS RAJ L7 | LALIT KUMAR L2 | Abhishek Chauhan L6 | GEETA DEVI L10 | M/S Shivam & Shiven Contractor L5 | naveen kumar L4 | SHIVEN CHAUDHARY L3 | HEM RAJ L9 | Pankaj Chauhan Govt. Contr. L8 | LEKH RAJ L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation and trenches etc. in earth work in all kind of soils such as pick work jumper work,saturated soil including blasting soft/hard rock, chiseling soft/hard rock where blasting is prohibited in all lifts including trimming and dressing of sides, levelling of bed, stacking the excavated soil clear from the edge of excavation and then returning the excavated soil in 15cm. layers when required into plinths,side of foundations etc including consolidating each deposited layer by ramming , watering and then disposing of all surplus excavated soil as directed in all leads & lifts and shoring strutting, timbering where ever required as per direction & best satisfaction of the Engineer-in-Charge. | 6.34 | Cum | 500 ₹3,170 | 300 ₹1,902 Lowest | 500 ₹3,170 | 399 ₹2,529.66 | 450 ₹2,853 | 379 ₹2,402.86 | 380 ₹2,409.2 | 400 ₹2,536 | 415 ₹2,631.1 | 300 ₹1,902 Lowest |
| 2.00 | Providing & laying cement concrete 1:6:12 (1 cement : 6 sand : 12 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth including carriage of material with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 1.23 | Cum | 5,280 ₹6,494.4 | 4,000 ₹4,920 Lowest | 5,000 ₹6,150 | 6,000 ₹7,380 | 5,200 ₹6,396 | 4,079 ₹5,017.17 | 5,000 ₹6,150 | 5,000 ₹6,150 | 5,300 ₹6,519 | 4,000 ₹4,920 Lowest |
| 4.00Providing form work with steel plates 3.15 mm thick welded with angles iron in frame 30x30x5 mm so as to give a fair finish including centering shuttering struting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for in-situ- reinforced concrete and plain concrete:- | |||||||||||||
| 4.01 | Vertical surface such as walls (any thickness) partitions and the like including attached pillasters, buttresses, etc. plinth and string courses complete job in all respect with in all leads and lifts as per the direction and best satisfaction of Engineer-in-Charge. | 61.6 | Sqm | 410 ₹25,256 | 350 ₹21,560 | 375 ₹23,100 | 300 ₹18,480 | 380 ₹23,408 | 479 ₹29,506.4 | 360 ₹22,176 | 450 ₹27,720 | 405 ₹24,948 | 190 ₹11,704 Lowest |
| 5.00 | Providing & laying cement concrete 1:5:10 (1 cement :5 sand:10 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of centering & shuttering in in foundation and plinth including carriage of material with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 27.72 | Cum | 5,300 ₹1,46,916 | 4,500 ₹1,24,740 Lowest | 5,300 ₹1,46,916 | 6,300 ₹1,74,636 | 5,200 ₹1,44,144 | 4,779 ₹1,32,473.88 | 5,000 ₹1,38,600 | 5,500 ₹1,52,460 | 5,480 ₹1,51,905.6 | 4,500 ₹1,24,740 Lowest |
Tender Value
₹2.1 L
EMD Value
₹4,200
Closing Date
1 Jan 2026, 5:00 pmClosed
Executive Engineer
JSD Baggi
CO Retaining wall to protect the pump house RD 0-10 10 Rmt . SDF-2024-947
2025_HPIPH_124147_1
23780-829 dated 22-12-2025
Open Tender
Civil Works
Item Rate
90 days
Baggi
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
₹4,200
25 Jan 2026
22 Dec 2025
2 Jan 2026
23 Dec 2025
1 Jan 2026
23 Dec 2025
23 Dec 2025 - 1 Jan 2026
Excavation in foundation and trenches etc. in earth work in all kind of soils such as pick work jumper work,saturated soil including blasting soft/hard rock, chiseling soft/hard rock where blasting is prohibited in all lifts including trimming and dressing of sides, levelling of bed, stacking the excavated soil clear from the edge of excavation and then returning the excavated soil in 15cm. layers when required into plinths,side of foundations etc including consolidating each deposited layer by ramming , watering and then disposing of all surplus excavated soil as directed in all leads & lifts and shoring strutting, timbering where ever required as per direction & best satisfaction of the Engineer-in-Charge.
Providing & laying cement concrete 1:6:12 (1 cement : 6 sand : 12 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth including carriage of material with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge.
Providing form work with steel plates 3.15 mm thick welded with angles iron in frame 30x30x5 mm so as to give a fair finish including centering shuttering struting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for in-situ- reinforced concrete and plain concrete:-
Vertical surface such as walls (any thickness) partitions and the like including attached pillasters, buttresses, etc. plinth and string courses complete job in all respect with in all leads and lifts as per the direction and best satisfaction of Engineer-in-Charge.
Providing & laying cement concrete 1:5:10 (1 cement :5 sand:10 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of centering & shuttering in in foundation and plinth including carriage of material with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge.
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
FORM6.pdf
Tender Documents • 0.42 MB
BOQ_182452.xls
BOQ • 2.31 MB
TC.pdf
Tender Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .