| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAccepted-AOC | ₹5.7 L | L1 | Accepted-AOC approved |
| 2 | L1₹5.7 LRejected-AOC | ₹5.7 L | L1 | Rejected-AOC approved |
| 3 | L2₹6.3 L+₹60,185.28 (10.6%)Rejected-AOC AT P O TOPE P S ATTABIRA DIST BARGARH | BARGARH | ODISHA | 768027 | ₹6.3 L+₹60,185.28 (10.6%) | L2 | Rejected-AOC approved |
| 4 | l3₹6.3 L+₹60,253.05 (10.6%)Rejected-AOC | ₹6.3 L+₹60,253.05 (10.6%) | l3 | Rejected-AOC approved |
Tender Value
₹6.8 L
EMD Value
₹6,778
Closing Date
18 Apr 2026, 3:00 pmClosed
EXECUTIVE OFFICER
ATTABIRA NAC
boundary wall
2026_ORULB_127958_12
01/2026-27
Open Tender
Civil Works - Roads
Percentage
2 days
ATTABIRA NAC
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,000
₹6,778
Yes
9 Aug 2026
9 Apr 2026
20 Apr 2026
9 Apr 2026
18 Apr 2026
9 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in hard soil or gravelly soil within 50M initial lead and 1.5M initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3M in depth and as per the direction of the Engineer-in-charge. | - | Per cum | 1 | - |
| 2 | Supplying, filling in foundation and plinth with sand in 22.5 cm (9”) thick layers including watering and ramming with cost, conveyance, royalties and taxes of sand with labour and T&P required for the work etc. complete (Measurement will be taken on finished compacted section only). | - | Per cum | - | - |
| 3 | Cement concrete of proportion (1:4:8) in foundation and floors using 4cm (1 ½”) size clean hard black Crusher broken granite stone metal of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers not exceeding 15 cm. (6”) thick to the required level ramming, watering, curing etc. complete including cost, conveyance, royalties and taxes of all materials with all labour, cess and T&P etc. all cost comp. | 1 | Per cum | 1 | ₹1 |
| 4 | R.C.C. work of M-20 Grade with 20mm and down graded b.h.c.b.g. chips including hoisting and laying. | - | Per cum | 1 | - |
| 5 | Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete . | - | Per Sqm | 1 | - |
| 6 | Supplying ,fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification | - | Per Qntl | 1 | - |
| 7 | Earth work in oridinary soil within 50m initial lead and 1.5m initial lift including Transportation with in 5km including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge | - | Per cum | - | - |
| 8 | Cement concrete of proportion (1:3:6) in foundation and floors using 4cm (1 ½”) size clean hard black Crusher broken granite stone metal of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers not exceeding 15 cm. (6”) thick to the required level ramming, watering, curing etc. complete including cost, conveyance, royalties and taxes of all materials with all labour, cess and T&P etc. all cost comp. | - | Per cum | 1 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_587417.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
Tendernotice_2.pdf
PDF • 0.73 MB
BOQ_587417.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .