| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.0 LAdmitted-Fee/PreQual/Technical/Finance | ₹20.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹20.3 L+₹25,737.98 (1.29%)Admitted-Fee/PreQual/Technical/Finance | ₹20.3 L+₹25,737.98 (1.29%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | NAVAS V L1 | KALLYADAN CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00BUILDING PROPER | |||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 3.38 | cum | 227.95 ₹770.47 Lowest | 230.88 ₹780.37 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 4.86 | cum | 7,019.02 ₹34,105.42 Lowest | 7,109.35 ₹34,544.33 |
| 1.00 | OD148611/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. .All work upto plinth level | 1.28 | cum | 9,635.08 ₹12,313.63 Lowest | 9,759.08 ₹12,472.1 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 127.8 | kilogram | 99.47 ₹12,712.27 Lowest | 100.75 ₹12,875.85 |
| 1.00 | OD148607/2025-2026:Laterate masonry with neatly dressed laterate stone of size 35x20x20cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc. | 27.92 | cum | 7,229.69 ₹2,01,881.86 Lowest | 7,322.73 ₹2,04,479.91 |
| 1.01 | OD148609/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. . All work above plinth level upto floor V level | 19.61 | cum | 11,435.2 ₹2,24,244.27 Lowest | 11,582.36 ₹2,27,130.08 |
| 1.01 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 2,353.2 | kg | 99.47 ₹2,34,072.8 Lowest | 100.75 ₹2,37,084.9 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 3.6 | sqm | 341.67 ₹1,230.01 Lowest | 346.07 ₹1,245.85 |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 6 | sqm | 892.36 ₹5,354.16 Lowest | 903.85 ₹5,423.1 |
Tender Value
₹21.1 L
EMD Value
₹50,000
Closing Date
14 Aug 2026, 5:00 pmClosed
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER PWD BUILDINGS DIVISION, THALASSERY
LAC-ADS-MLA ADS 2025-26 AZHIKODE LAC CONSTRUCTION OF EK NAYANAR SMARAKA VAYANASALA AND GRANDALAYAM-CONSTRUCTION OF EK NAYANAR SMARAKA VAYANASALA AND GRANDHALAYAM IN RS NO 48/144, WARD NO 9,AT VARAM KADAV , MATHODAM, NARATH GRAMA PANCHAYATH-General Ci
2026_PWD_850269_3
1/2026-27
Open Tender
Civil Works - Buildings
Item Rate
MATHODAM
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
17 Aug 2026
6 Aug 2026
17 Aug 2026
6 Aug 2026
14 Aug 2026
6 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1BUILDING PROPER | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 1 | cum | - | - |
| 1.002 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.003 | OD148611/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. .All work upto plinth level | - | cum | - | - |
| 1.004 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1 | kilogram | - | - |
| 1.005 | OD148607/2025-2026:Laterate masonry with neatly dressed laterate stone of size 35x20x20cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc. | 1 | cum | - | - |
| 1.006 | OD148609/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. . All work above plinth level upto floor V level | 1 | cum | - | - |
| 1.007 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 1 | kg | - | - |
| 1.008 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | - | sqm | - | - |
| 1.009 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | - | sqm | - | - |
stage.html
html • 0.02 MB
finance_1462950.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.04 MB
NIT.pdf
Tender Documents • 0.02 MB
BOQ_1462950.xls
BOQ • 0.35 MB
SBD.pdf
Tender Documents • 1.64 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .