Loading…
Loading…
Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹98.3 LAccepted-AOC BB 52 SECTOR 1 SALT LAKE CITY KOLKATA 700 064 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700064 | L1 | Accepted-AOC 1st lowest bidder | |
| 2 | L2₹99.0 L+₹78,639.74 (0.80%)Rejected-Finance | L2 | Rejected-Finance 2nd lowest bidder | |
| 3 | L3₹99.2 L+₹93,384.70 (0.95%)Rejected-Finance | L3 | Rejected-Finance 3rd lowest bidder |
Tender Value
₹98.3 L
EMD Value
₹2.0 L
Closing Date
24 Feb 2026, 3:00 pmClosed
Executive Engineer
Bidhannagar Municipal Corporation
Construction of Dropping Pumping Station on the Drainage Main Line Outfall at FD Block of Canal Side Under Bmc.
2026_MAD_1003439_1
NIT NO. 2199/PWD(BMC), DTD. 10.02.2026
Open Tender
CIVIL WORKS
Percentage
120 days
Bidhannagar Municipal Corporation
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹2.0 L
7 Apr 2026
10 Feb 2026
26 Feb 2026
10 Feb 2026
24 Feb 2026
10 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
(a) Depth of excavation not exceeding 1,500 mm. | 109.73 | %m3 | 11,927 | ₹13,08,749.71 |
| 1.01 | (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring. | 109.73 | %m3 | 19,238 | ₹21,10,985.74 |
| 1.02 | (c) Depth of excavation for additional depth beyond 3000 mm. excluding cost of shoring as necessary. | 66.23 | %m3 | 23,470 | ₹15,54,418.1 |
| 1.03 | (a) Beyond 4000 mm to 6000 mm below G.L. | 66.23 | %m3 | 27,702 | ₹18,34,703.46 |
| 2 | Hire and Labour charges for shoring with sheet pile (8mm thick) & ISMB – 250 runner struts, anchor tie etc. complete, Beam section confirming to IS-226 IS: 808 & SP(6)- 1964 including cutting to requisite length, fabrication with necessary welding confirming to IS: 816-1956 & IS: 1995 etc. for overall depth of excavation from GL.
i) For Construction of U.G S.W. line place etc.
a) 4.0 M to below 5.0 M. | 188.63 | m2 | 9,396 | ₹17,72,367.48 |
| 2.01 | b) 5.0 M to below 6.0 M | 94.2 | m2 | 10,940 | ₹10,30,548 |
| 3 | (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | 21.95 | %m3 | 93,621 | ₹20,54,980.95 |
| 4 | Supplying ready mixed concrete of M 25 Grade with well graded stone chips of 20 mm nominal size containing designed quantity of cement per Cu.m of wet concrete produced in computerised batching plant under controlled condition using approved super plastisizer, designing concrete mix following I.S. 10262 and I.S. 456, transporting the mix with agitation in transit mixer to work site depositing the mix on a platform erected for the purpose at required levels of concreting and then placing the mix in its final location of form work compacting and curing the same complete as per specification & direction of the Engineer-in-charge including computerised batching plant transit mixer with all accessories vibrators etc. inclusive of all other incidental charges in this connection complete but excluding cost of hire charge of platform and its supporting staging which would be paid through separate item. [cement to be supplied by the Manufacturer/ supplier]
In Ground Floor & Foundation. :
(i) With approved concrete pump. | 97.68 | m3 | 7,617 | ₹7,44,028.56 |
| 5 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. | 13.03 | MT | 60,580 | ₹7,89,357.4 |
| 6 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. | 454.32 | m2 | 335 | ₹1,52,197.2 |
stage.html
html • 0.05 MB
technical_2459693.pdf
techsummary_2459693.pdf
finance_2459693.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BOQ_2459693.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .