| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.1 LAccepted-AOC | L1 | Accepted-AOC lowest | |
| 2 | L2₹17.6 L+₹50,820 (2.98%)Rejected-AOC | L2 | Rejected-AOC second lowest |
Tender Value
₹17.1 L
EMD Value
₹42,900
Closing Date
30 Dec 2019, 6:00 pmClosed
Executive Engineer
EXECUTIVE ENGINEER, MI DIVISION,CHENGANNUR.
Removing water hyacint
2019_Irrig_331043_1
T-9/EEMI/CGNR/2018-19
Open Tender
Civil Works - Others
Item Rate
90 days
Haripad
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,300
Yes
online
₹42,900
Yes
11 Feb 2020
20 Dec 2019
4 Jan 2020
20 Dec 2019
30 Dec 2019
20 Dec 2019
Amount
Scheme- 1
od37839/2019_2020/KP : Removing water hayacinth and surface excavation in or under water by mechanical means (Hydraulic excavator)/manual means over areas not exceeding 30 cm in depth, but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated materials, lead up to 50 m and lift up to 1.5 m and neatly leveled on the banks. All kinds of soil
Scheme-II
od37839/2019_2020/KP : Removing water hayacinth and surface excavation in or under water by mechanical means (Hydraulic excavator)/manual means over areas not exceeding 30 cm in depth, but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated materials, lead up to 50 m and lift up to 1.5 m and neatly leveled on the banks. All kinds of soil
Scheme III
od37839/2019_2020/KP : Removing water hayacinth and surface excavation in or under water by mechanical means (Hydraulic excavator)/manual means over areas not exceeding 30 cm in depth, but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated materials, lead up to 50 m and lift up to 1.5 m and neatly leveled on the banks. All kinds of soil
Scheme- IV
od37839/2019_2020/KP : Removing water hayacinth and surface excavation in or under water by mechanical means (Hydraulic excavator)/manual means over areas not exceeding 30 cm in depth, but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated materials, lead up to 50 m and lift up to 1.5 m and neatly leveled on the banks. All kinds of soil
Scheme - V
od37839/2019_2020/KP : Removing water hayacinth and surface excavation in or under water by mechanical means (Hydraulic excavator)/manual means over areas not exceeding 30 cm in depth, but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated materials, lead up to 50 m and lift up to 1.5 m and neatly leveled on the banks. All kinds of soil
Scheme - VI
od37839/2019_2020/KP : Removing water hayacinth and surface excavation in or under water by mechanical means (Hydraulic excavator)/manual means over areas not exceeding 30 cm in depth, but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated materials, lead up to 50 m and lift up to 1.5 m and neatly leveled on the banks. All kinds of soil
Scheme- VII
od37839/2019_2020/KP : Removing water hayacinth and surface excavation in or under water by mechanical means (Hydraulic excavator)/manual means over areas not exceeding 30 cm in depth, but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated materials, lead up to 50 m and lift up to 1.5 m and neatly leveled on the banks. All kinds of soil
Scheme - VIII
od37839/2019_2020/KP : Removing water hayacinth and surface excavation in or under water by mechanical means (Hydraulic excavator)/manual means over areas not exceeding 30 cm in depth, but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated materials, lead up to 50 m and lift up to 1.5 m and neatly leveled on the banks. All kinds of soil
Scheme -IX
od37839/2019_2020/KP : Removing water hayacinth and surface excavation in or under water by mechanical means (Hydraulic excavator)/manual means over areas not exceeding 30 cm in depth, but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated materials, lead up to 50 m and lift up to 1.5 m and neatly leveled on the banks. All kinds of soil
Scheme - X
od37839/2019_2020/KP : Removing water hayacinth and surface excavation in or under water by mechanical means (Hydraulic excavator)/manual means over areas not exceeding 30 cm in depth, but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated materials, lead up to 50 m and lift up to 1.5 m and neatly leveled on the banks. All kinds of soil
Scheme -XI
od37839/2019_2020/KP : Removing water hayacinth and surface excavation in or under water by mechanical means (Hydraulic excavator)/manual means over areas not exceeding 30 cm in depth, but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated materials, lead up to 50 m and lift up to 1.5 m and neatly leveled on the banks. All kinds of soil
Scheme- XII
od37839/2019_2020/KP : Removing water hayacinth and surface excavation in or under water by mechanical means (Hydraulic excavator)/manual means over areas not exceeding 30 cm in depth, but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated materials, lead up to 50 m and lift up to 1.5 m and neatly leveled on the banks. All kinds of soil
JOMU P JACOB
Bidder Name
SHAJAHAN E
JOMU P JACOB
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.PDF
finance_460363.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .