Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 12 106 LAXMINAGAR GOPALAPATNAM GOPALAPATNAM VISAKHAPATNAM ANDHRA PRADESH 530027 | VISAKHAPATANAM | ANDHRA PRADESH | 530027 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance 1 7 80 TO 87 MITHONA TOWERS 1 PRENDERGHAST ROAD SECUNDERABAD HYDERABAD TELANGANA 500003 | HYDERABAD | TELANGANA | 500003 | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
17 Aug 2021, 2:00 pmClosed
As per LIB
As per LIB
EPCC_3 PACKAGE PPU AND WAREHOUSE FOR PETROCHEMICAL AND LUBE INTEGRATION PROJECT_LUPECH _J18 AT IOCL GUJARAT REFINERY VADODARA GUJARAT INDIA
2021_REFHQ_136302_1
077154C/T/ LuPech(J18)/LSTK-3
Limited
Lump Sum TurnKey
Lump-sum
900 days
Vadodara
As per LIB
5 documents required · 5 mandatory
Exempted
Online
6 Sept 2021
5 Jun 2021
18 Aug 2021
5 Jun 2021
17 Aug 2021
7 Aug 2021
5 Jun 2021 - 25 Jun 2021
28 Jun 2021
Amount
Residual Process Engineering, Detailed Design Engineering including HAZOP/HAZID/SIL Study & Other Safety Studies as mentioned in Bidding Documents, Project Management, Site enabling jobs, Topography Survey and Soil Investigation, Demolition/ Dismantling works mentioned in the tender document, Total Procurement (including chemicals, catalysts, first fill, consumables, special tools and tackles, Pre-Commissioning Spares, Commissioning Spares, Start-up spares & Mandatory spares), Fabrication, Manufacturing, Quality Assurance, Inspection & Expediting, Third Party Inspection, Supplies, Transportation, Insurance, Handling & Storage of all Equipment, Materials, items and other Construction Materials at yard/site, Fabrication, Assembly, Construction, Erection, Installation of all plant machinery including civil, Structural, Mechanical, Piping, Electrical and Instrumentation including tie-ins, Testing, Insulation, Painting, First fill of chemicals and lubricants, Obtaining all Statutory Approvals (except for Environment Clearance), Precommissioning & Mechanical Completion of Plant, Preparation of plant specific operating manuals, Start-up, Commissioning and Performance Guarantee Test Runs (PGTR), Training of Owner’s O&M personnel, consumables (Chemicals & Lubricants) for 6 (six) months operation, Contract closure activities of (Poly Propylene Unit + WAREHOUSE), Dispatch facilities, Laboratory, Substation and interconnection systems as detailed in Bid Document and interconnection systems as per tender documents, Final invoice/billing & document hand over and handing over of the facilities with Final and “As Built” documentation, supply of all Spares with necessary support during defect liability period and supply of Chemicals, Catalysts (other than free issue), Tool & Tackles, Consumables, Lubricants, Refrigerants, etc. for initial charge and replenishment of any loss of these during commissioning up to handing over after successful PGTR of the facilities.
FOREIGN CURRENCY PART
INDIAN CURRENCY PART
Description of Work / Item(s)
Amount
Lumpsum Price for Supply portion for completion of Scope of Work as per Bidding Document
IN FOREIGN CURRENCY
IN INDIAN CURRENCY
Description of Work / Item(s)
Amount
ENGINEERING PRICE (RESIDUAL PROCESS DESIGN AND DETAIL ENGINEERING AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF BIDDING DOCUMENT
IN FOREIGN CURRENCY
IN INDIAN CURRENCY PART
LUMPSUM PRICE FOR CONSTRUCTION PORTION AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF THE BIDDING DOCUMENT
IN FOREIGN CURRENCY
IN INDIAN CURRENCY
TOTAL OF ENGINEERING AND CONSTRUCTION PRICE [1 + 2]
IN FOREIGN CURRENCY
IN INDIAN CURRENCY
Description of Work / Item(s)
Amount
GST ON SUPPLY OF INDIGENOUS GOODS (PART BREAK-UP OF SP-1 )
Basic Customs Duty & other import duties on Supply of Imported Goods other than those mentioned below (Foreign Component of SP-1)
SWS on Duties quoted at S.no. 2.1
IGST / (CGST+SGST) on (Foreign component of SP-1 + (Duties at Sr. 2.1 and 2.2 above)
GST on supply of services offered by Indian Bidder/Indian Member of Consortium/JV, quoted in Indian Currency and Foreign Currency (part- breakup of SP-2 calculated based on percentage quoted in SP-5
Description of Work / Item(s)
Amount
AMOUNT OF FOREIGN COMPONENT
AMOUNT OF INDIAN COMPONENT
Description of Work / Item(s)
Amount
Annual charges for Post Warranty maintenance for AC UPS as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for DC BATTERY CHARGER as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for VFD as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for HEATER CONTROL PANEL as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for HVAC / PRESSURIZATION System as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for PACKAGE PLC as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for ANALYSER and ANALYSER SHELTER as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for MMS / CMS as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for CCTV SYSTEM FOR WAREHOUSE as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for ANTI-SURGE CONTROLLER as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Description of Work / Item(s)
Amount
GUARANTEED UTILITY CONSUMPTION FOR EPCC-03 PACKAGE AS PER BIDDING DOCUMENT
GUARANTEED POWER CONSUMPTION FOR EPCC-03 PACKAGE
GUARANTEED COOLING WATER CONSUMPTION FOR EPCC-03 PACKAGE
L & T HYDROCARBON ENGINEERING LIMITED
Tata Projects Limited
Petrofac International (UAE) LLC
Tecnimont S.p.A.
L & T HYDROCARBON ENGINEERING LIMITED
Tata Projects Limited
Petrofac International (UAE) LLC
Tecnimont S.p.A.
L & T HYDROCARBON ENGINEERING LIMITED
Tata Projects Limited
Petrofac International (UAE) LLC
Tecnimont S.p.A.
Petrofac International (UAE) LLC
Tecnimont S.p.A.
L & T HYDROCARBON ENGINEERING LIMITED
Megha engineering and Infrastructures Limited
Tata Projects Limited
Petrofac International (UAE) LLC
Megha engineering and Infrastructures Limited
Tecnimont S.p.A.
Tecnimont S.p.A.
L & T HYDROCARBON ENGINEERING LIMITED
Petrofac International (UAE) LLC
L & T HYDROCARBON ENGINEERING LIMITED
Tecnimont S.p.A.
Petrofac International (UAE) LLC
US Dollar
European Euro
Japanese yen
Portion of Quoted Rate in Currency
European Euro
European Euro
US Dollar
European Euro
European Euro
European Euro
US Dollar
European Euro
US Dollar
European Euro
European Euro
European Euro
US Dollar
European Euro
European Euro
European Euro
European Euro
European Euro
European Euro
US Dollar
European Euro
European Euro
European Euro
European Euro
European Euro
European Euro
European Euro
European Euro
European Euro
European Euro
European Euro
European Euro
European Euro
European Euro
European Euro
European Euro
European Euro
European Euro
European Euro
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .