Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.0 LAdmitted-Fee/PreQual/Technical/Finance AT WARD 10 PO BIRAMITRAPUR DIST SUNDARGARH ODISHA | BIRAMITRAPUR | SUNDARGARH | ODISHA | +0.00% | ₹6.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹6.0 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹6.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L1₹6.0 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹6.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L1₹6.0 LAdmitted-Fee/PreQual/Technical/Finance AT WARD NO 03 BHATTI ROAD P O P S BIRAMITRAPUR DIST SUNDARGARH PIN 770033 | BIRAMITRAPUR | SUNDARGARH | ODISHA | 770033 | +0.00% | ₹6.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L1₹6.0 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹6.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹6.0 L
EMD Value
₹6,185
Closing Date
15 Jun 2026, 5:00 pmClosed
EXECUTIVE OFFICER, BIRMITRAPUR MUNICIPALITY
EXECUTIVE OFFICER, BIRMITRAPUR MUNICIPALITY
construction of BT road from Raju baghuwar towards tunguri tola school.
2026_ORULB_130676_20
EO/BRMP/02/2026-27
Open Tender
Civil Works - Others
Percentage
60 days
BIRMITRAPUR MUNICIPALITY
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
₹6,185
Yes
20 Jun 2026
4 Jun 2026
17 Jun 2026
4 Jun 2026
15 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and applying tack coat with bitumen on prepared surface including cleaning of road surface and spraying bitumen at the rate of 0.20Kg/M2 using mechanical means as per clause 502 of MoSRT&H specification for road & bridge work (4th revision) (Data for 3500M2) AR2006,p-168,item 44 | 430.5 | sqm | 19.77 | ₹8,510.99 |
| 2 | Providind and laying "BITUMINOUS MACADAM" with hot mix plant using crushed aggregates of specified grading premixed with Bituminous binder of 60/70 penetration grade of bitumen transportred to site laid over a previously prepared surface with a hydrostatic paver finisher with mechanical control to the required grade level and alignment and rolling with smooth wheeled vibrating and tandem rollers to achieve the desired compaction as per clause 504 of MoSRT&H specification for Road & Bridge works. Data for 205 Cum (450 Tonne) | 22.17 | cum | 10,606.56 | ₹2,35,147.44 |
| 3 | Providing and laying semi dense bituminous concrete with batch type hot mix plant using crushed aggregates of specified grading premixed with bituminous binder of 60/70 penetration grade of bitumen transporting the hot mix to work site laying with a hydro static paver finisher with mechanical control to the required grade, level and alignment rolling with smooth wheeled vibratory and tendem rollers to achieve the desired compaction as per clause 508 of MoSRT&H specification for road & bridge work. (Data for 195 Cum (450T) | 10.76 | cum | 14,818.51 | ₹1,59,447.17 |
| 4 | Providing and laying of hot applied thermoplastic compound 2.5mm thick including rafleat rising glass beads @ 250gms per sqmt area thickness of 2.5mm is exclusive of surface applied glass beads as per IRC-35. The finished surface to be level, uniform and free from streaks and holes etc complete. | 24.6 | sqm | 392.04 | ₹9,644.18 |
| 5 | Earth work in excavation of foundation in hard soil with initial lead and lift including rough dressing and leveling the bed and depositing the soil away as directed by E.I.C . | 12 | cum | 282.88 | ₹3,394.56 |
| 6 | Sand filling with filling sand inside F and P including watering and ramming, cost of material, labour, conveyance all taxes T and P etc. complete. | 4 | cum | 738.69 | ₹2,954.76 |
| 7 | Metal concrete (1:3:6) using 40mm size CBG metal with all cost of material, labour, conveyance, royalty, taxes T and P etc. complete. | 4 | cum | 6,182.65 | ₹24,730.6 |
| 8 | C. C (1:2:4) using 12mm size CBG chips chips including compacting, curing, all cost of material, labour, conveyance, royalty, taxes T and P etc. complete excluding centering and shuttering. | 14.63 | cum | 7,757.3 | ₹1,13,489.3 |
| 9 | Rigid smooth centering and shuttering to C.C. work including false work and dismantling them after casting complete in Ground Floor. | 130 | sqm | 249.82 | ₹32,476.6 |
| 10 | Towards Photograph of project, display board & other unforseen items | 1 | Nos | 10,000 | ₹10,000 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
BOQ_594274.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .