| Sl No | Description | Qty | Unit | SEA BLUE SHIPYARD LIMITED L1 |
|---|---|---|---|---|
| 1.00 | Preparation of docking plan for Pearl of Periyar barge. | 1 | LS | 40,000 ₹40,000 Lowest |
| 2.00 | Dry Docking of Pearl of Periyar barge as per the approved docking plan. | 1 | NO | 8,50,000 ₹8,50,000 Lowest |
| 3.00 | Dock Hire charges of the Yard. Charges shall be inclusive of gangway rent charges | 34 | D | 14,500 ₹4,93,000 Lowest |
| 4.00 | Wharfage charges of the yard. Charges shall be inclusive of gangway rent charges. | 6 | D | 11,500 ₹69,000 Lowest |
| 5.00 | Undocking of Pearl of Periyar barge from contractor's Yard after completion
of the repair works | 1 | NO | 6,45,000 ₹6,45,000 Lowest |
| 6.00 | Shore Power Supply-3 Phase,415V, 50Hz | 860 | KWH | 75 ₹64,500 Lowest |
| 7.00 | Emptying Diesel & Oil tanks in the barge. Providing closed containers and space in the yard for storing the drained diesel & oil from the tanks in the barge. Refilling diesel to the barge after completion of repair works.
Note: Entire materials, machinery & manpower required for emptying, storing & refilling of Diesel & oil tanks in the barge are under the scope of contractor. | 1 | LS | 55,600 ₹55,600 Lowest |
| 8.00 | Gas free certification of the diesel tanks by Yard. | 1 | LS | 34,500 ₹34,500 Lowest |
| 9.00 | High pressure water jet cleaning of all external portions of the hull & weather deck of the barge after dry docking:
All accessible spaces of the barge shall be cleaned by using high pressure water cleaning. External surfaces shall be free of dirt, marine growths,
barnacles etc..
Note: Entire materials, machinery and manpower required for cleaning of the barge are under the scope of contractor. | 1 | LS | 3,75,000 ₹3,75,000 Lowest |
| 10.00 | Performing Ultrasound Thickness Gauging(UTG) at areas recommended by the surveyor. Rate to be quoted per point gauging by Ultrasound thickness guage.
Note: Entire materials, equipment(Ultrasound thickness guage) & manpower required for performing the thickness measurement are under the scope of contractor. | 1,500 | NO | 38 ₹57,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
14 Oct 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AGM(Mat)C
Contracts Dept. Corporate Materials FACT Udyogamandal
Dry Docking of Pearl of Periyar Barge-2023, as per tender documents.
2023_FACT_774206_1
06075/2023-2024/E28212
Open Tender
Miscellaneous Works
Item Rate
40 days
FEW, Palluruthy
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹1 L
Yes
25 Oct 2023
30 Sept 2023
16 Oct 2023
30 Sept 2023
14 Oct 2023
30 Sept 2023
Amount
Preparation of docking plan for Pearl of Periyar barge.
Dry Docking of Pearl of Periyar barge as per the approved docking plan.
Dock Hire charges of the Yard. Charges shall be inclusive of gangway rent charges
Wharfage charges of the yard. Charges shall be inclusive of gangway rent charges.
Undocking of Pearl of Periyar barge from contractor's Yard after completion of the repair works
Shore Power Supply-3 Phase,415V, 50Hz
Emptying Diesel & Oil tanks in the barge. Providing closed containers and space in the yard for storing the drained diesel & oil from the tanks in the barge. Refilling diesel to the barge after completion of repair works. Note: Entire materials, machinery & manpower required for emptying, storing & refilling of Diesel & oil tanks in the barge are under the scope of contractor.
Gas free certification of the diesel tanks by Yard.
High pressure water jet cleaning of all external portions of the hull & weather deck of the barge after dry docking: All accessible spaces of the barge shall be cleaned by using high pressure water cleaning. External surfaces shall be free of dirt, marine growths, barnacles etc.. Note: Entire materials, machinery and manpower required for cleaning of the barge are under the scope of contractor.
Performing Ultrasound Thickness Gauging(UTG) at areas recommended by the surveyor. Rate to be quoted per point gauging by Ultrasound thickness guage. Note: Entire materials, equipment(Ultrasound thickness guage) & manpower required for performing the thickness measurement are under the scope of contractor.
Fore peak space cleaning: Fore peak space shall be cleaned and made ready for Classification agency/KIV inspection. Sludge, muck, debris & mud in the fore peak space shall be cleared and disposed off to shore. Note: Entire materials, machinery & manpower required for the cleaning of Forepeak space shall be under the scope of contractor.
Cargo Hold cleaning: Cargo Hold shall be cleaned and made ready for Classification agency/KIV inspection. Sludge, muck, debris & mud in the cargo hold shall be cleared and disposed off to shore. Note: Entire materials, machinery & manpower required for the cleaning of Cargo Hold shall be under the scope of contractor.
Ballast Tank cleaning: Ballast Tank shall be cleaned and made ready for Classification agency/KIV inspection. Sludge, muck, debris & mud in ballast tanks shall be cleared and disposed off to shore. Note: Entire materials, machinery & manpower required for the cleaning of ballast tanks shall be under the scope of contractor.
Chain Locker & Store space cleaning: Chain Locker & Store space space shall be cleaned and made ready for Classification agency/KIV inspection. Sludge, muck, debris & mud in chain locker & store space shall be cleared and disposed off to shore. Note: Entire materials, machinery & manpower required for the cleaning of chain locker & store space shall be under the scope of contractor.
Fresh water Tanks Cleaning: Fresh water tanks shall be cleaned and made ready for Classification agency/KIV inspection. Sludge, muck, debris & mud in fresh water tanks shall be cleared and disposed off to shore. Note: Entire materials, machinery & manpower required for the cleaning of fresh water tanks shall be under the scope of contractor.
Fuel Oil Tanks Cleaning: Fuel Oil tanks shall be cleaned and made ready for Classification agency/KIV inspection. Sludge & muck in the fuel tanks shall be cleared and disposed off to shore. Note: Entire materials, machinery & manpower required for the cleaning of fuel oil tanks shall be under the scope of contractor.
Engine Room Cleaning: Engine rooms shall be cleaned and made ready for Classification agency/KIV inspection. Sludge & muck in the engine room shall be cleared and disposed off to shore. Note: Entire materials, machinery & manpower required for the cleaning of engine room shall be under the scope of contractor.
Wing Tanks & Double Bottom region(Void spce): Wing Tanks & Double Bottom(Void space) shall be cleaned and made ready for Classification agency/KIV inspection. Sludge & muck in the wing tanks & double bottom regions (Void space) shall be cleared and disposed off to shore. Note: Entire materials, machinery & manpower required for the cleaning of wing tanks & double bottom region shall be under the scope of contractor.
Steel Plate Renewal- Steel Plate renewal includes renewal of damaged shell plates. Area that are marked by Classification society/KIV/FACT for steel renewal shall be repaired by Contractor. All materials used for the steel renewal works shall be confirming to IRS Grade A. Only welders who have qualified the WQT shall be assigned for the repair works. NST tests like RT,UT, DP,MPI etc.. if required after carrying out the repair works shall be under the scope of contractor. Note: Entire materials, machinery & manpower required for the steel plate renewal works of the barge are under the scope of contractor.
Steel Plate Renewal- Steel Plate renewal includes renewal of damaged web plates, floor plates, girder, keelson, stringer plates and similar structural members. Area that are marked by Classification society/KIV/FACT for steel renewal shall be repaired by Contractor. All materials used for the steel renewal works shall be confirming to IRS Grade A. Only welders who have qualified the WQT shall be assigned for the repair works. NST tests like RT,UT, DP,MPI etc.. if required after carrying out the repair works shall be under the scope of contractor. Note: Entire materials, machinery & manpower required for the steel plate renewal works of the barge are under the scope of contractor.
Renewal of Anodes: All Type A( 8 Kg) zinc anodes on the barge shall be replced. Replaced anodes shall be of class approved and shall contain zinc content of atleast 98%. Note: Entire materials, machinery & manpower required for replacing Type A zinc anode are under the scope of contractor.
Renewal of Anodes: All Type B( 5 Kg) zinc anodes on the barge shall be replced. Replaced anodes shall be of class approved and shall contain zinc content of atleast 98%. Note: Entire materials, machinery & manpower required for replacing Type B zinc anode are under the scope of contractor.
Renewal of Anodes: All Type C( 3 Kg) zinc anodes on the barge shall be replced. Replaced anodes shall be of class approved and shall contain zinc content of atleast 98%. Note: Entire materials, machinery & manpower required for replacing Type C zinc anode are under the scope of contractor.
Ovehauling of Sea suction Valves -125 NB(Gate Valve) Scope of work includes removal of valves from pipe lines, complete dismantling, cleaning, replacement of all gaskets (eg: body-bonnet gasket, Flange gasket etc…), Lapping of Valve seats, replacement of gland packing, hydrotesting of the valves & refixing of the valves to the pipe lines after completion of overhauling works. Note: Entire materials, machinery & manpower required for the overhauling works of 125NB sea suction valves (as mentioned above) are under the scope of contractor.
Ovehauling of Intermediate Valves -125 NB(Gate Valve) Scope of work includes removal of valves from pipe lines, complete dismantling, cleaning, replacement of all gaskets (eg: body-bonnet gasket, Flange gasket etc…), Lapping of Valve seats, replacement of gland packing, hydrotesting of the valves & refixing of the valves to the pipe lines after completion of overhauling works. Note: Entire materials, machinery & manpower required for the overhauling works of 125NB intermediate (as mentioned above) are under the scope of contractor.
Ovehauling of Overboard Valves -65 NB(SDNR Valve) Scope of work includes removal of valves from pipe lines, complete dismantling, cleaning, replacement of all gaskets(eg: body-bonnet gasket, Flange gasket etc…), Lapping of Valve seats, replacement of gland packing, hydrotesting of the valves & refixing of the valves to the pipe lines after completion of overhauling works. Note: Entire materials, machinery & manpower required for the overhauling works of 65NB overboard valves (as mentioned above) are under the scope of contractor.
Chemical Cleaning, repairing & hydrotesting of sea suction lines connected till 125 NB intermediate Valve. Scope of work includes removing sea suction lines connected till 125 NB intermediate valve, chemical cleaning of pipelines using acid solution, carrying our repair works if leaks are found, hydrotesting, painting of sea suction lines and refixing of the sea suction lines with flange gaskets Note: Entire materials,machinery & manpower required for the work shall be under the scope of contractor.
Cleaning of 50 NB Foot Valve with Strainer: Scope of work includes complete dismantling of foot valve with strainer, cleaning & refixing of foot valve and strainer Note: Entire materials, machinery & manpower required for the cleaning of 50 NB foot valve with strainer shall be under the scope of contractor.
Cleaning of 40 NB Foot Valve with Strainer: Scope of work includes complete dismantling of foot valve with strainer, cleaning & refixing of foot valve and strainer Note: Entire materials, machinery & manpower required for the cleaning of 40 NB foot valve with strainer shall be under the scope of contractor.
Strum Boxes 65 NB Scope of work includes complete dismantling of the strum boxes, cleaning, replacement of all gaskets, painting & refixing of strum box. Note: Entire materials, machinery & manpower required for the overhauling works(as mentioned above) for the 65 NB strum box are under the scope of contractor.
Strum boxes 50 NB Scope of work includes complete dismantling of the strum boxes, cleaning, replacement of all gaskets, painting & refixing of strum box. Note: Entire materials, machinery & manpower required for the overhauling works(as mentioned above) for the 50 NB strum box are under the scope of contractor.
Strum box 40 NB Scope of work includes complete dismantling of strum boxes,cleaning, replacement of all gaskets, painting & refixing of strum box. Note: Entire materials, machinery & manpower required for the overhauling works(as mentioned above) for the 40 NB strum box are under the scope of contractor.
Strainer 125 NB Scope of work includes complete dismantling of 125 NB strainer, cleaning, replacement of all gaskets, painting & refixing of strainer. Note: Entire materials, machinery & manpower required for the overhauling works(as mentioned above) for the 125 NB strainer are under the scope of contractor.
Scope of work includes complete dismantling of 65 NB strainer, cleaning, replacement of all gaskets, painting & refixing of strainer. Note: Entire materials, machinery & manpower required for the overhauling works(as mentioned above) for the 65 NB strainer are under the scope of contractor.
Replacement of damaged 'D' type hollow fenders (Base : 150 mm x 150 mm) on the barge. Damaged fasteners of 'D' type hollow fenders shall also be replaced by contractor. Note: Entire materials, machinery & manpower required for the replacement of D-fender are under the scope of contractor.
Replacement of damaged Tyre fenders on the barge. Tyre, Chain, Hooks and necessary welding works for fixing the tyre fenders shall be done by contractor Note: Entire materials, machinery & manpower required for the replacement of tyre fenders are under the scope of contractor.
Replacement of hardened rubber beading in water tight doors and windows. Rubber beads procured by the contractor shall be of class approved.
Repairing broken exhaust line of emergency bilge pump in store space. Providing suitable insulation & cladding on exhaust line of emergency bilge pump after repair works.
Inspection & testing of fire sensors/alarm smoke sensor & bilge sensor/alarm: The sensors and alarms shall be inspected for proper working condition. If sensors/alarms are found to be not operating, same shall be repaired or replaced with new sensors/alarms, if needed to be replaced on recommendation from classification agency. Payment for the procurement of the sensor/alarm shall be paid extra against document evidence. Note: Entire materials and manpower required for the inspection, repair works (as mentioned above) & testing of the sensors/alarm are under the scope of contractor.
Supply of Starboard & portside propellers as per drg no:ACR/SPAB/18 Material of Construction: Magenese Bronze Grade Cu-1 Propellers supplied shall be of class approved
Refitment of propellers: Removal of existing damaged propellers of the barge from the propeller shaft. Replacing it with new propellers. Fasteners & Gaskets used in the hub and sealing flange to be replaced with new ones. Note: Entire materials, machinery and manpower required for the refitment of the propellers are under the scope of contractor.
Supply of starboard side & portside propeller shafts as per the drawing ACR/SPAB/16 MOC: AISI 316L Propeller shafts supplied shall be of class approved
Refitment of damaged propeller shaft: Removal of existing damaged propellers shaft of the barge from the propeller shaft. Replacing it with new propeller shafts Fasteners used in coupling side of the propeller shafts shall be of new ones. Rudders if required to be removed/refixed during the refitment of propeller shaft shall also be done by contractor. No additional payment shall be made in this regard Note: Entire materials, machinery and manpower required for the refitment of the propellers are under the scope of contractor.
Supply of new propeller shaft bushes(Forward and aft) including gland for both port side and starboard side propeller shafts as per drg No: ACR/SPAB/16 Material of Construction : GM with cutlass rubber lining Bushes supplied shall be of Class approved
Refitment of Propeller shaft bushes: Removal of existing damaged propellers shaft bushes of the barge. Replacing it with new bushes with adequate gland packing. Note: Entire materials, machinery and manpower required for the refitment of the propellers shaft bushes are under the scope of contractor.
Overhauling of hydraulic cylinder in steering system: Hydraulic cylinder for actuating the rudder shall be overhauled. All seals (Piston seals, Piston rod seals, Cushion seals, Cylinder Head seals etc..) & wear strips/rings shall be replaced. Piston rod, piston, tie rods, barrel & heads shall be inspected for any damage. Hydraulic cylinder shall be pressure tested after the required repair works and same shall fixed back. Top up of hydraulic oil shall be done and any air trapped inside the hydraulic system shall be vented. Note: Entire materials and manpower required for the overhauling works(as mentioned above) of the steering system are under the scope of contractor.
Electrical system: Main switch board, all junction box circuit breakers, control panels of equipment on deck, wheel house and engine room to be thoroughly examined. Damaged cables to be repaired and replaced. Payment for the cables & other electrical spares procured shall be paid extra against the document evidence. Safety measures in the electrical system like overload trip, reverse current trip, low voltage trip and interlock between the breaker are to be shown to the surveyor. Note: Entire materials, machinery and manpower required for the inspection, repair works(as mentioned above) & testing of the electrical system are under the scope of contractor.
Scope of work includes surface preparation by grit blasting (SA 2.5) and application of full scheme paint as per the specification attached. Note: All materials, machinery and manpower required for the painting are under the scope of contractor. Payment shall be made as per actual area of completion of the work.
Painting of Keel to Water line Surface preparation by chipping, scrapping, wire brush cleaning & buffing. Application of two coats of anti fouling paint as per the specification attached. Note: All materials, machinery and manpower required for the painting are under the scope of contractor. Payment shall be made as per actual area of completion of the work.
Painting of Water line to Deck Scope of work includes surface preparation by grit blasting (SA 2.5) and application of full scheme paint as per the specification attached. Note: All materials, machinery and manpower required for the painting are under the scope of contractor. Payment shall be made as per actual area of completion of the work
Painting of Water line to Deck Surface preparation by chipping, scrapping, wire brush cleaning & buffing. Application of two coats of anti fouling paint as per the specification attached. Note: All materials, machinery and manpower required for the painting are under the scope of contractor. Payment shall be made as per actual area of completion of the work.
Painting of Cargo Hold Surface preparation by chipping, scrapping, wire brush cleaning & buffing. Application of two coats of finish paint as per the specification attached. Note: All materials, machinery and manpower required for the painting are under the scope of contractor. Payment shall be made as per actual area of completion of the work.
Painting of Double bottom & Wing Tanks Surface preparation by chipping, scrapping, wire brush cleaning & buffing. Application of two coats of finish paint as per the specification attached. Note: All materials, machinery and manpower required for the painting are under the scope of contractor. Payment shall be made as per actual area of completion of the work.
Painting of Weather Deck Surface preparation by chipping, scrapping, wire brush cleaning & buffing. Application of two coats of finish paint as per the specification attached. Note: All materials, machinery and manpower required for the painting are under the scope of contractor. Payment shall be made as per actual area of completion of the work.
Painting of Superstructure, Mast, Funnel, Deck fittings & Machineries Surface preparation by chipping, scrapping, wire brush cleaning & buffing. Application of two coats of finish paint as per the specification attached. Note: All materials, machinery and manpower required for the painting are under the scope of contractor. Payment shall be made as per actual area of completion of the work.
Painting of Engine room: Surface preparation by chipping, scrapping, wire brush cleaning & buffing . Application of two coats of coal tar epoxy paint till floor height. Note: All materials, machinery and manpower required for the painting are under the scope of contractor. Payment shall be made as per actual area of completion of the work.
Painting of Ballast Tanks, Fore Peak, Chain locker, Coffer dams, void spaces: Surface preparation by chipping, scrapping, wire brush cleaning & buffing . Application of one coat of finish paint as per the specification attached. Note: All materials, machinery and manpower required for the painting are under the scope of contractor. Payment shall be made as per actual area of completion of the work.
Painting of Other floors: Surface preparation by chipping, scrapping, wire brush cleaning & buffing . Application of full scheme paint as per the specification attached. Note: All materials, machinery and manpower required for the painting are under the scope of contractor. Payment shall be made as per actual area of completion of the work.
Painting of anchor chain & anchor: Surface preparation by chipping, scrapping, wire brush cleaning & buffing . Application of full scheme paint as per the specification attached. Note: All materials, machinery and manpower required for the painting are under the scope of contractor. Payment shall be made as per actual area of completion of the work.
Painting of miscellaneous items: Scope of work includes repainting of barge name, Classification agency notation, KIV registration, plimsoll mark, load line & other similar markings for identification of the parts in the barge. Note: All materials, machinery and manpower required for the painting of miscellaneous items (as mentioned above) are under the scope of contractor.
Removal & Refixing of Anchor chain: Scope of work includes removal of anchor chain from windlass for painting & refixing of the same in windlass after completion of painting. Crane & required manpower for removing the anchor & anchor chain are under the scope of contractor.
Supply of Fresh Water
Sea Chest: Sea Chest to be opened and cleaned. Mud, muck & sludge to be removed from the sea chest and disposed ashore. Gratings to be inspected and cleaned. All fasteners of the gratings to be replaced. Note: Entire materials, machinery & manpower required for the cleaning & repair works in sea chest shall be under the scope of contractor.
Repair of damaged propellers Scope of work includes carrying out the repair works of the existing damaged propellers of the barge as per the recommendations of Classification agency/ KIV/FACT. Propellers shall be balanced after carrying out the required repair work. Entire repair works and balancing of the propellers shall be done by IRS works approved agencies or parties. Note: All materials, machinery and manpower required for the repair works of the propeller are under the scope of contractor.
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .