| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹418.93Accepted-AOC | ₹418.93 Quoted ₹4.2 Cr | L1 | Accepted-AOC Bid is responsive |
| 2 | L2₹4.3 Cr+₹8.7 L (2.07%)Rejected-Finance 12 SADAR BAZAR CHAKRATA DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | ₹4.3 Cr+₹8.7 L (2.07%) | L2 | Rejected-Finance Bid is non responsive |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not Responsive |
| 4 | Rejected-Technical C O HOTEL VASUNDHARA PLACE KAILASH GATE MUNIKI RETI TEHRI GARHWAL | TEHRI GARHWAL | UTTARAKHAND | - | - | Rejected-Technical Not Responsive |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not Responsive |
Tender Value
₹4.3 Cr
EMD Value
₹8.6 L
Closing Date
8 Oct 2020, 1:00 pmClosed
CE URRDA
Chief Engineer, URRDA, First Floor in Directorate Panchyati Raj, Opposite IT Park, Shastradhara Road, Dehradun,
CONSTRUCTION OF PAWN TO SIRGA MOTOR ROAD UNDER PMGSY LENGTH 8.300 KM STAGE I WORK
2020_CCUK_98891_1
UT1395
National Competitive Bid
Civil Works - Roads
Item Rate
455 days
PUROLA
Refer as per Technical Bid
4 documents required · 4 mandatory
₹5,900
CE URRDA
₹8.6 L
Mussoorie
10 Dec 2020
4 Sept 2020
8 Oct 2020
8 Sept 2020
8 Oct 2020
9 Sept 2020
8 Sept 2020
Amount
Earth work in hill road (hill side cutting/ filling):- Excavation in hilly area for construction of raod in all type of soils& rocks as met at site, true to lines as per Plan, L section, cross slopes, superelevation as required, also including uprooting & cutting of bushes, dressing of road surface to the required level and slopes with all lead, lift and safe disposal of surplus excavated material at suitable dumping places indicated in drawings by mechenical means/manual means without damaging forest, forest land, utility and private properities, including slip clearance till the completion of work as per "SPECIAL CONDITION FOR HILL ROAD CUTTING AND MUCK DISPOSAL IN LUMP SUMP JOB " mentioned in SBD clause 9 of Section 4 (Part-II) Special condition of contract as per directed by Engineer-In-Charge as per MORD Specification clause 1601, 1602 &1603, Note : Above Lump-sump job include 9894.33 cum minimum quantity for Muck disposal. If after the measurement [as mentioned in special condition of contract clause 9.1 (g) of SBD Section 4 (part-II) dumped quantity is found less then above mentioned quantity deduction @ Rs. 92.13 per cum shall made for lump sum job amount.
MAINTENANCE DURING CONSTRUCTION Running Slip Clearance & land slides in soil and ordinary rock during rainy seasons at Construction time of Stage -II, by a bull-dozer D 80 A-12, 180 HP including supply of all materials, labour, T&P etc required for proper completion of the work. 15 % of total length
Excavation for Structures:- Excavation in foundation for cross drainage structures, Retaining walls, brest walls, breast walls and other similar structure in all types of soils and rocks as met at site with all leads, lift and disposal of surplus earth as directed by Engineer - in - Charge also including supply of all materials, labour, T&P etc required for proper completion of work.
Random rubble stone masonry for structures laid dry by locally available approved stone ncluding supply of all materials, labour, T&P etc required for proper completion of work as per Drawing and MORD specification for , retaining walls, brest walls & other smimilar structures etc as per direction of Engineer-in-charge..
Random rubble stone masonry for structures laid in 1:5 cement & sand mortar by locally available approved stone and sand from approved quarry including supply of all materials, labour, T&P etc required for proper completion of work as per Drawing and MORD specification for cross drainage structures, retaining walls, brest walls & other smimilar structures etc as per direction of Engineer-in-charge..
HP stone filling in back of walls including supply of all material,labour, T&P etc. required for proper completion of the work.
Plaster 1:4 in cement & sand mortor including supply of all materia, labour, T&P etc required for proper completeion of work
Making of 100 mmx100mm size as weep hole in full depth of pucca wall including supply of all material, labour, T&P etc required for proper completeion of work asper directed by Engineer-in-charge (Rate including in R.R. Pucca wall)
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS: 4826 in 100 mm x 100 mm mesh (woven diagonally) including 10% extra for laps and joints laid with stone boulders weighting not less than 25 Kg each as per drawing and technical specification of MORD and as directed by Engineer-in-charge
Cement plum masonry with 40% plum & 60% 1:3:7 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work.(As per PWD Uttarakhand specifications)
Providing edge stone on valley side of formation as per drawing and Technical specification Clause 1608.2.6 as per MORD spec. 1600 Sr. No. 8.9 (0.49mtr @ 247.00/ mtr =121.03)
Flush Pointing(1 : 3) front
White wash (fornt, back and side)
Construction of Trapazoidal kutcha drain (0.60 m x 0.45 m) size as per drawing excluding gapes for C/D structures including excavation in all type of soil and rocks as met at site including supply of all materials, labour, T&P lead, lifts, disposal of excavated materials etc as per direction of Engineer-in-charge
Providing and laying plain cement concerte (M-10) in 1:3:6 ( 1 cement, 3 coarse sand,6 40mm stone ballast & 20mm stone ballast)
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 (M25 grade)
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202. (The reinforcement steel shall be procured from original (primary) steel producers as per clause no. 2011.3.1 of MORD specifications (First Revision'2014) and IS 1786:2008 clause no. 1.6)
Plain / reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, (M-25)
RR Dry stone masonary in Kharanja bottom of Catchpit
Providing and fixing of kilometer stone as per standard drawing made of precast R:C:C 1:2:4 fixed with C.C 1:3:6 including excavation of pit, painting and printing letters on kilometer stone with two coat of approved synthetic enamel paint of approved .
Same as above item No. but for 200 meter stone
Same as above item No. but for 5th Km. stone
Providing and fixing of PMGSY Logo board at starting point, as per attached standard drawing duly painted and writen as per MORD specification and direction by Engineer in charge
Providing and fixing of PMGSY Logo board at end point and every 2 Km, as per attached standard drawing duly painted and writen as per MORD specification and direction by Engineer in charge
Providing and fixing of Title Information Board with PMGSY Logo at suitable place in the starting of the road as per attached standard drawing duly painted and writen as per MORD specification and direction by Engineer in charge
Providing and fixing of Citizen information board with PMGSY Logo at at starting and prominent location (where maximum no. of fitizens can view the detail of the road)as per attached standard drawing duly painted and writen as per MORD specification and direction by Engineer in charge
Providing and fixing of Trafic Sign Boards )Cautionary, mandatory & infomatory( as per attached drawing duly painted and writen as per MORD specification and direction by Engineer in charge
Providing and fixing of semi reflective Direction and Place identification sign boards up to 0.90 sqm as per attached drawing and direction by Engineer in charge
Providing and fixing of semi reflective Direction and Place identification sign boards more then 0.90 sqm as per attached drawing and direction by Engineer in charge
Providing and fixing of Maintenance board( as per attached drawing duly painted and writen as per MORD specification and direction by Engineer in charge
Emergency Maintenance
Deploying Hydraulic Excavators of 0.90 cum Bucket for opening of Road with required slip clearance in all type of Soil, Rock and Boulders including its Operator, Fuel, all other charge and taxes required for proper completion of work.
Ist Year
2nd Year
Clearance of land slides (Slip Clearance) Clearance of Major Slip land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side complete as directed by the Engineer-in-charge.
Ist Year
2nd Year
Construction of Coolie Walling including supply of all material, labour, T&P etc. required for proper completion of the work as per direction of Engineerin-in-charge. (As per PWD Uttarakhand specifications)
Ist Year
2nd Year
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire (@ 32 Kg/ 10 Sqm) conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing
Ist Year
2nd Year
Maintainance Activities:PBMC
Maintenance under PBMC for 1] Trimming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations as per technical specifications Clause 1914. 2] Maintenance of road side Drains including minor slip clearence , reshaping ,deepening and ,regrading ,as well as catch water drains as per technical specification Clause 1907. 3]Maintenance of shoulders to the required level by filling/cutting the soil and its compacting including disposal of the surplus material in approved muck disposal points as per specification clause 1903 . 4] Maintenance of scuppers & Culverts by way of clearing, Cleaning, Erosion repair, repairs to cracks, parapet walls and Protection works as per drawing and technical specification Clasue 1908. 5] Maintenance of Causeway by way of minor Surface repairs, replacing Guide Posts, repair of flood gauges, removal of debris, providing boulders and protection work and painting as per technical specification Clause 1909. 6] Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as per drawings and technical specification Clause 1910. 7] Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912. 8] Two coat white washing on parapet walls of CD work ,edge stones, tree truncks, and prominent rock patches on hill sides including preparation of surface by cleaning scraping etc. as per technical specifications Clause 191.
Ist Year
2nd Year
Amit Joshi
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .