Loading…
Loading…
Tender Value
₹59.4 L
Closing Date
7 Sept 2026, 3:00 pm7d left
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Revenue
TM
12 conditions · 1 needing a document upload
Offers from the OEM/their authorized dealers are only considered. In case of OEM, Tenderer should specify the same. In case of dealers, tenderer has to submit the current & valid dealership certificate from OEM/Tender specific authorization letter along with the e-bid.
I/we the tenderer (s) am/are signing this document after carefully reading the contents.
I/We the tenderer(s) also accept all the conditions of the tender and have signed all the pages in confirmation thereof.
I/we hereby declare that I/we have downloaded the tender documents from Indian Railway website www.ireps.gov.in . I/we have verified the content of the document from the website and there is no addition, no deletion or no alteration to the content of the tender document. In case of any discrepancy noticed at any stage i.e. evaluation of tenders, execution of work or final payment of the contract, the master copy available with the railway Administration shall be final and binding upon me/us.
I/we declare and certify that I/we have not made any misleading or false representation in the forms, statements and attachments in proof of the qualification requirements.
I/We also understand that my/our offer will be evaluated based on the documents/credentials submitted along with the offer and same shall be binding upon me/us.
I/We declare that the information and documents submitted along with the tender by me/us are correct and I/we are fully responsible for the correctness of the information and documents, submitted by us.
I/we certify that I/we the tenderer(s) is/are not blacklisted or debarred by Railways or any other Ministry / Department of Govt. of India from participation in tender on the date of submission of bids, either in individual capacity or as a HUF/ member of the partnership firm/LLP/JV/Society/Trust.
I/we understand that if the contents of the certificate submitted by us are found to be forged/false at any time during process for evaluation of tenders, it shall lead to forfeiture of the Bid Security and may also lead to any other action provided in the contract including banning of business for a period of upto two year. Further, I/we and all my/our constituents understand that my/our offer shall be summarily rejected.
I/we also understand that if the contents of the certificate submitted by us are found to be false/forged at any time after the award of the contract, it will lead to termination of the contract, along with forfeiture of Bid Security/Security Deposit and Performance guarantee and may also lead to any other action provided in the contract including banning of business for a period of upto two year.
I/We have read the clause regarding restriction on procurement from a bidder of a country which shares a land border with India and certify that I am/We are not from such a country or, if from such a country, have been registered with the competent Authority. I/We hereby certify that I/we fulfil all the requirements in this regard and am/are eligible to be considered (evidence of valid registration by the competent authority is enclosed)
41 conditions · 5 needing a document upload
Please submit your bank details i.e. Name of Bank along with Bank Branch Code, Accounts Number as appearing in the cheque book, IFSC Code and PAN Number, duly certified by the authorised official of the bank, to facilitate payment through ECS/NEFT/RTGS.In lieu of BankCertificate,scanned copy of a cancelled cheque may be attached for verification of the above particulars.
EMD/Security Deposit: The tenderer is exempted from depositing Earnest Money as per the provision contained in MSOP-2018, item no.31(G) of Part-A Works Matters. The bidder shall submit the bid security declaration as per the prescribed proforma of Bid Security Declaration attached to the tender schedule.
Performance Guarantee : Contractor shall have to submit a Performance Guarantee (PG) of 5% of the contract value within 30(Thirty) days from the date of issue of letter of Acceptance (LOA) .The PG has to be submitted in four separate parts of 1.25% each of the contract value. All the provisions along with Extension of time , Penalty etc as specified in clause 4.11 of GCC for Services 2018 are applicable.
Variation in Ordered Quantity: Applicable as pr GCC for Service 2018 para No 5.3.2.
Price Variation Clause: The Price Variation Clause (PVC) of General Conditions of Contract (GCC) shall not be applicable to this Annual Maintenance Contract (AMC) as per Railway Board's Letter No. 2013/CE-I/CT/O/10/PVC/Pt.1, dated 27.01.2015
Payment: Railway shall make payment through NEFT on submission of bill by the contractor, duly certified by the authorized Railway officer in-charge of the work that the work has been completed to the satisfaction of the Railway. Spare parts and components are charged during the repairing work are as per the accepted rate list, terms &conditions of the agreement. Bill paying authority will be Sr.DFM/BZA. Payment would be normally made within 30 (Thirty) days from the date of submission of bills at Dy. CE/TM/Lines/BZA, if found to be in order. While submitting the bill the Contractor should attach the following documents along with the bill in Railway format in Electronic Form. 1.Fall clause certificate 2.Copy of Delivery C h a l l a n 3.Copy of the Supply Order. 4.Copy of Invoice. 5.Documents applicable for claim of statutory duties and taxes.
Statutory Variation Clause: Statutory Variation in taxes and duties, or fresh imposition of taxes and duties by State/ Central Governments in respect of the items stipulated in the contract (and not the raw materials thereof),within the original delivery period stipulated in the contract, or last unconditionally extended delivery period shall be to Railways' account. Only such variation shall be admissible which takes place after the submission of bid. No claim on account of statutory variation in respect of existing tax/duty will be accepted unless the tenderer has clearly indicated in his offer the rate of tax/duty considered in his quoted rate. No claim on account of statutory variation shall be admissible on account of misclassification by the supplier/contractor.
Fall Clause: Fall Clause is applicable as per IRS Conditions of Contract as amended up to date. During every billing, the Contractor has to give certificate stating that no spares are supplied to other parties less than these rates.
New Impost: Any New Impost or revision in the duties, taxes, levies, etc. on finished product levied, as statutory duties during the currency of contract will be reimbursed by Railway subject to submission of documentary evidence in respect of payment made by the supplier.
TAXES & DUTIES: While quoting, the rates should clearly indicate the rate of applicable taxes. Tenderer should submit the rates duly specifying the taxes and same shall be charged at the rate applicable at the time of delivery of spares and date of servicing the machine for the Railway. The payment will be made only on production of documentary evidence. Tenderer should also furnish HSN code, GSTIN number representing the States in which they are registered for GST along with the address of registered office, place of Business in state etc.Firm should ensure that they are GST compliant and their quoted tax structure/rates are as per GST law.
The rates quoted by the contractor should not be above the rates quoted for any other other Railway/Govt Agency
The contractor has to provide Railway the services of Engineer for the purpose of carrying the checking, repairing, maintenance and overhauling of SQRS machines working in this Railway as and when called upon to do so by Railway. Charges for the same shall be paid as agreed in the contract.
This is a single tender for " Annual maintenance contract for attending services & supply of spares to SQRS cranes with OEM M/s. SIMPLEX ENGINEERING AND FOUNDRY WORKS PVT.LTD - BHILAI for two years 2026-27 & 2027-28 at a total value of Rs.59,40,821.28/-.(i.e., Rs.28,97,961.60 for 2026-27 & Rs.30,42,859.68/- for 2027-28)."So only IMPLEX ENGINEERING AND FOUNDRY WORKS PVT.LTD - BHILAI is requested to submit their offer. Offer submitted by any other firm will not be considered for evaluation and consideration.
Contract shall come into force for a period of two years from the date of issue of letter of acceptance. However the validity can be extended if mutually agreed.
Skilled and unskilled labor and small consumables like grease, oil etc. required for servicing the machines in Railway premises shall be arranged by Railways at site as per availability. However, Tools & Plants for the job shall be brought by Service Engineer himself at their cost.
During maintenance/servicing, the Service Engineer will replace spare part(s) if necessary. Such spares duly certified by the Machines In-Charge will be paid at the rates agreed. The contractor shall return the released material to the Railway. Only spares can also be ordered by Dy. CE/TM/Lines/SC(Looking after by Dy.CE/TM/HQ).
The Contractor, at the end of each deputation of Service Engineer, will raise bills directly for cost of spares used and labour charges involved for servicing various components on the Railway with a certificate from the machine-in-charge that the engineer had attended for the number of days and hours claimed and satisfactorily carried out the job.
The Contractor should submit rates for spares likely to be required along with rates for repair of sub-assemblies; components duly specify taxes, warranty, duties etc., along with the offer. Rate list should be valid for entire contract period without any change from the date of LOA.
Spares will be supplied in advance by the contractor on a formal requisition from Railways and immediately on its receipt, the Railway will make them available at site for use when the maintenance/service of the machine is undertaken. The contractor shall ensure that the spares as requisitioned by Service Engineer are available in the price list of spares in the AMC.
All the defective/unserviceable components, which are released, shall be returned to the railway by the firm and the same shall be accounted for by concerned SSE of Machine -In charge.
Only genuine spare parts are to be supplied and/or fitted. The contractor shall submit documentary proof in the form certificate for imported spares supplied from OEM.
The Contractor shall supply the spares within 30 days from the date of receipt of written requisition from Railways. The destination address for supply of spares shall be:Zonal Track Machine Depot (ZTMD/CVB), Cavalry Barracks Railway Station, Beside CTW Barracks, Near Nagamma Temple, Lal Bazar, Secunderabad - 500087.Contractor shall try to deliver the spares as early as possible. In case of delay in supply of spare parts for reasons solely attributable to supplier a penalty of 0.5 % on value of delayed spare part per day or part thereof will be levied & maximum upto 10% of the spare part value (gross value) till 21 days after given delivery period.In case Material is not received even within delivery period + grace period of 21 days, order shall be treated cancelled and a penalty of 10% of spare part value (Basic value) shall be levied as penalty from subsequent bills.
All spare parts (except wear and tear items) to be supplied under AMC are to bewarranted/guaranteed as per IRS conditions of contract.Excluded From Warranty are: - Parts subject to wear and tear, Parts that are operationally linked with parts not supplied by contractor, Parts becoming defective due to incorrect installation by the Railways orattended by outside agency.In case of any spare's rejection arises due to unsuitabilityof the spares, the same will be replaced within 10 days, otherwise penalty will be charged 0.5% of spares value per day and maximum upto 10% of the spares value.Failure of contractor to replace defective spare will be dealt as per conditions of contract.
Contract shall provide warranty of 6 months for the services of various component/ sub-assemblies
During the subsistence of this contract, this agreement may be terminated by the Railways by giving fifteen days' notice
Penalty Clause: In case the Service Engineer is not deputed within 7 days after receipt of any Telephonic/Fax/Written message from the Railway for routine inspection and within 48 hrs. in case of emergency, the service charges of the service engineer would be reduced by 25% per day for the number of days delayed beyond the above stipulated period with a condition that the machine will be made available by the Railway, at a place confirmed to the firm during the intimation of complaint.
In the event of failure on account of bad workmanship/ non adherence to quality norms as required, a token of penalty of Rs. 5000/- (Rs. Five Thousand) shall be imposed on per occasion & no payment will be made for attending the same
A request for supply of spares or deputation of service engineer shall be honored till last date of currency of the AMC. Execution of such request will be obviously after expiry of AMC and delivery date or deputation period will go beyond it depending upon the terms of delivery/deputation stipulated in the AMC. No additional extension of validity for such cases is required and bills for such work/supplies will be honored by Railways as per the delivery schedule for spares mentioned in the agreement.
Arbitration : In the event of any dispute, differences etc, in interpreting the various clauses of the agreement or in actual working of the contract, the same will be referred to by either of the parties to the General Manager, South Central Railway or to any one specially nominated by him on his behalf for arbitration and his award is binding on both the contractor and the Railways. The Arbitration and Conciliation Act 1996 and rules there under and any statutory modification thereof shall apply to the Arbitration proceedings under this clause.
The Contractor shall not be entitled to be provided with any facilities byway of accommodation, free passes or material or transport. The arrangements for stay and lodging of the staff of the Contractor shall be the responsibility of the Contractor.
Contractor shall be wholly responsible for the statutory observations performing to his staff viz PF, ESI, WCA etc and he will be responsible for the maintenance of necessary records in this connection and also comply with all statutory requirements in force from time to time. The Contractor shall pay minimum wages to his staff as fixed from time to time under the laws in force.
The rates for spares will remain firm only during the validity of contract. If it is found that at any stage that the rates charged to South Central Railway are higher than those charged from any other Railway suitable recovery from the contractor shall be made.
Force Majeure Clause: Railway's Standard Force Majeure Clause shall only be applicable which is as follows: "In the event of any unforeseen event directly interfering with the supply of stores arising during the currency of the contract such as war, insurrection, restraint imposed by the Govt. act of legislature or other disorganization of labour, acts, of public enemy, acts of God, Sabotage, etc. The contractor shall within a week from the commencement there of notify the same in writing to the purchaser with reasonable evidence thereof. If the Force Majeure Clause mentioned above has in force for a period of 90 days of commencement of such force majeure, the same should be brought to notice of the purchase by giving 14 days' notice in writing. In case of such terminations no damages shall be claimed by either party against the others are except those which had accrued under any clause of this agreement prior to such terminations".
Sometimes the delivery of all the spares an order is not possible in a single lot due to any reason, in such cases part suppliers must be accepted and the payment should be affected for spares supplied.
The contractor has to submit the requisite documents regarding the establishment of firm as per Annexure-II(Bid Form -Second sheet) point no.17.2 of GCC for services 2018.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The contract will be governed by Indian Railways Standard General Conditions of Services-2018 with up to date correction slips in accordance with GFR 2017, IRS Conditions of Contract and Terms and conditions of this contract & special conditions of contract to the extent applicable & accepted.
Annual Maintenance Contract for attending services & supply of spares to SQRS Cranes working over SCR for two years 2026-27 & 2027-28 at a total value of Rs.59,40,821.28/-(in which Rs.28,97,961.60 for 2026-27 & Rs.30,42,859.68 for 2027-28).
TM-SimplexAMC-26-28~SCR
TM-SimplexAMC-26-28
Single
Service - General
24 Months
Unknown (Unspecified Location)
₹0
Exempted
14 Aug 2026
14 Aug 2026
24 Aug 2026
6 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 28,97,961 | ||
| — | — | — | 28,97,961 | ||
| SCR Charges to | — | Maintenance Contract for for the year 2026-27.Total The tenderer shall not quote for the same shall be charges in Annexure - A and be filled, signed and uploaded tender document, special | of spares to to Rs.28,97,961.60 than the NOTE: 1. The are attached 2. Tenderer attached to the |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
AnnexA.pdf
ATTACHMENT
BidSecurityDeclarationForm.pdf Bid Declaration
ATTACHMENT
DetailsoftheTenderer.pdf
ATTACHMENT
MandateForm.pdf
ATTACHMENT
GCCServices2018.pdf
ATTACHMENT
IRSconditions.pdf
ATTACHMENT
BidSecurityDeclarationForm.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].