Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹84,722.11Accepted-AOC | ₹84,722.11 | L1 | Accepted-AOC Accepted Vide Resolution No.3(1) dtd.07-05-2026 of CHUNGATHARA GP |
| 2 | L2₹1.0 LRejected-AOC | ₹1.0 L | L2 | Rejected-AOC Second bidder. Kept in abeyance till the execution of agmnt by the First Bidder |
Tender Value
₹84,722
EMD Value
₹2,118
Closing Date
4 Mar 2026, 6:00 pmClosed
Assistant Engineer
Office of the Assistant Engineer LID EW Section Chungathara Grama Panchayat
Annual Plan 2025 26 Chungathara Gp Proj No 368/26 PERUMBILAD PUBLIC WELL REPAIR 368/26General Civil Work
2026_LSGD_839220_9
09/AE/CKTA/2025-26
Open Tender
Civil Works - Water Works
360 days
Chungathara GP
Please refer Tender documents.
9 documents required · 9 mandatory
₹555
Yes
₹2,118
Yes
27 Jun 2026
23 Feb 2026
6 Mar 2026
23 Feb 2026
4 Mar 2026
23 Feb 2026
Well Repair
15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix)
5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural sources derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources derived from natural sources)
OD439871/2025-2026:Engaging man mazdoor for cleaning works
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
51.2.3:Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
50.6.7.1:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc.
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.55 MB
Tendernotice_2.pdf
PDF • 0.13 MB
Tendernotice_3.pdf
PDF • 0.12 MB
BOQ_1414043.xls
BOQ • 0.23 MB
368.rar
Tender Documents • 2.88 MB
Download all tender documents and submit your bid