Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical | - | Rejected-Technical 858975.90 |
| Sl No | Description | Qty | Unit | AZEEZ E.K. L1 | N. ABDUL RASHEED L2 |
|---|---|---|---|---|---|
| 1.00Appendix A | |||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 8.69 | cum | 236.63 ₹2,056.31 Lowest | 240 ₹2,085.6 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1.74 | cum | 7,286.51 ₹12,663.95 Lowest | 7,300 ₹12,687.4 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 6.95 | cum | 9,634.13 ₹66,976.47 Lowest | 9,700 ₹67,434.4 |
| 1.00 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 39.82 | cum | 11,731.49 ₹4,67,101.01 Lowest | 11,800 ₹4,69,828.8 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 2,218.32 | kilogram | 103.26 ₹2,29,063.72 Lowest | 110 ₹2,44,015.2 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 6.32 | sqm | 354.69 ₹2,241.64 Lowest | 355 ₹2,243.6 |
| 1.01 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 77.28 | sqm | 771.19 ₹59,597.56 Lowest | 780 ₹60,278.4 |
| 1.01 | OD10057/2025-2026:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg
/sq.cm including cost of materials, conveyance, labour charges etc. complete. | 3.5 | metre | 112.86 ₹395.01 Lowest | 115 ₹402.5 |
Tender Value
₹8.4 L
EMD Value
₹21,002
Closing Date
8 Aug 2025, 2:00 pmClosed
ASSISTANT ENGINEER
MALAPPURAM MUNICIPAL OFFICE
GENERAL-Malappuram Municipality Annual Plan 2023-2024 Construction of Retaining wall for Anganavadi Centre 147 Building in ward no 36 project No 867/24-Malappuram Municipality-General Civil Work
2025_LSGD_780898_16
AE/LID-EW/MLPM/03/2025-26
Open Tender
Civil Works - Roads
Item Rate
MALPPURAM
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,855
Yes
₹21,002
Yes
13 Nov 2025
31 Jul 2025
11 Aug 2025
31 Jul 2025
8 Aug 2025
31 Jul 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .