Loading…
Loading…
Tender Value
₹2.0 L
EMD Value
₹3,920
Closing Date
30 Jul 2026, 6:00 pm5d left
Executive Engineer
Executive Engineer
aS BOQ
2026_RDPR_316483_3
23 REW Samba of 2026-27 Dated-16-07-2026
Open Tender
Civil Works
Percentage
30 days
Bari Brahmana
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executve Engineer Rew Samba
₹3,920
17 Jul 2026
17 Jul 2026
31 Jul 2026
17 Jul 2026
30 Jul 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | 16.98 | cum | 479.3 | ₹8,138.51 |
| 2 | Providing and Laying in position cement concrete of specified grade excluding the cost of centring and shuttering – All work upto plinth level 1: 5: 10: ( 1: cement 5: coarse sand : 10 graded | 4.25 | cum | 4,826.5 | ₹20,512.63 |
| 3 | Providing and Laying in position cement concrete of specified grade excluding the cost of centring and shuttering – All work upto plinth level 1: 3: 6: ( 1: cement 3: coarse sand : 6 graded crushed stone aggregate 20mm nominal size,20% boulders | 10.87 | cum | 5,733.6 | ₹62,324.23 |
| 4 | Dumping of stone | 2.72 | cum | 700 | ₹1,904 |
| 5 | Centring and shuttering including strutting, propping etc. and removal of form work for:-a) Foundation, footings, bases of columns. | 66.89 | sqm | 286.35 | ₹19,153.95 |
| 6 | P/L of Bed flooring 40mm thk 1:2:4 mix | 18.58 | sqm | 346.7 | ₹6,441.69 |
| 7 | P/L of 12mm thk c.sand plaster 1:6 mix | 44.59 | sqm | 266.2 | ₹11,869.86 |
| 8 | P/L of c.conc. Mix 1:1.5:3 in RCC slab | 3.48 | cum | 7,788.4 | ₹27,103.63 |
| 9 | Reinforcement cement conc. Work incl. bending, cutting, placing | 2.16 | qtl | 12,320 | ₹26,611.2 |
| 10 | Rehandling of available Earth | 15.28 | cum | 218.4 | ₹3,337.15 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.98 MB
BOQ_1031901.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].