Loading…
Loading…
Tender Value
₹7.6 Cr
EMD Value
₹7.6 L
Closing Date
23 Sept 2026, 6:00 pmClosed
Add. City Engineer
PROVIDING AND LAYING STORM DRAINAGE LINE & CONSTRUCTION OF R.C.C. BOX AT T.P. SCHEM NO. 15 (PAL) ON VARIOUS T.P. ROAD IN WEST ZONE (PHASE-2), SURAT.
343165
Additional City Engineer / West Zone /08/ 2026-2027 (Work No. 01)
Open
Civil Works - Others
Works
Surat
3 documents required · 3 mandatory
₹14,160
Commissioner, Surat Municipal Corporation
₹7.6 L
8 Sept 2026
8 Sept 2026
8 Sept 2026
23 Sept 2026
8 Sept 2026
PROVIDING AND LAYING STORM DRAINAGE LINE & CONSTRUCTION OF R.C.C.
BOX AT T.P. SCHEM NO. 15 (PAL) ON VARIOUS T.P. ROAD IN WEST ZONE (PHASE-2),
NAME OF WORK: PROVIDING AND LAYING STORM DRAINAGE LINE &
CONSTRUCTION OF R.C.C. BOX AT T.P. SCHEM NO. 15 (PAL) ON
VARIOUS T.P. ROAD IN WEST ZONE (PHASE-2), SURAT.
TENDER NOTICE (online) NO:
Additional City Engineer / West Zone /08/ 2026-2027
VOLUME-II: PRICE BID
Download of tender documents from website : 07/09/2026 to 23/09/2026, up to 16.00 hrs.
smctender.nprocure.com
Date of Pre-bid conference : Bidders shall have to post queries on E-mail address
[email protected]. on or before
Last date of submission of online tender : Up to 23/09/2026, up to 18.00 hrs.
Submission of tender fees, EMD and other : From 07/09/2026 To 30/09/2026 18.00 Hrs. To
documents in hard copy Chief Accountant, "Shri Tapi Bhawan - Surat
Mahanagar Seva Sadan" Gordhandas Chokhawala
Marg, Shri Tapipura, Surat, by R.P.A.D./Speed
Estimated Cost : Rs. 7,58,19,602.85/-
Earnest Money Deposit (EMD) : Rs. 7,59,000.00 /-
Document Fees + 18% GST : Rs. 14,160.00/- (Incl. 9% CGST + 9% SGST)
Opening of Tender (Online) : On 24/09/2026, 10.00 hrs.
Tender to be submitted to:
To Chief Accountant,
"Shri Tapi Bhawan - Surat Mahanagar Seva Sadan"
Gordhandas Chokhawala Marg,
Shri Tapipura, Surat –
PROVIDING AND LAYING STORM DRAINAGE LINE & CONSTRUCTION OF R.C.C.
BOX AT T.P. SCHEM NO. 15 (PAL) ON VARIOUS T.P. ROAD IN WEST ZONE (PHASE-2),
PROVIDING AND LAYING STORM DRAINAGE LINE & CONSTRUCTION OF R.C.C.
BOX AT T.P. SCHEM NO. 15 (PAL) ON VARIOUS T.P. ROAD IN WEST ZONE (PHASE-2),
1. NAME OF WORK
PROVIDING AND LAYING STORM DRAINAGE LINE & CONSTRUCTION OF R.C.C.
BOX AT T.P. SCHEM NO. 15 (PAL) ON VARIOUS T.P. ROAD IN WEST ZONE (PHASE-2),
1) ESTIMATED COST OF CAPITAL WORK: Rs. 7,58,19,602.85(Excluding GST)
(Seven Crore Fifty-Eight Lakh Nineteen Thousand Six Hundred Two Rupees and Eighty-Five
TENDERER’S BID FOR EXECUTION OF CAPITAL WORK:
PERCENTAGE HIGHER / BELOW OF Rs. 7,58,19,602.85(Excluding GST)
TENDER AMOUNT (IN FIGURES): Rs. __________________
TENDER AMOUNT (in WORDS): Rs. __________________
Rate Quoted by bidder shall be inclusive of all taxes but Excluding GST. GST shall be
paid extra as per prevailing rules.
SIGNATURE AND SEAL OF THE CONTRACTOR:
NAME AND ADDRESS:
SIGNATURE OF WITNESS:
NAME AND ADDRESS:
PROVIDING AND LAYING STORM DRAINAGE LINE & CONSTRUCTION OF R.C.C.
BOX AT T.P. SCHEM NO. 15 (PAL) ON VARIOUS T.P. ROAD IN WEST ZONE (PHASE-2),
2. SCHEDULE – B
BOQ for the Providing and Laying Storm Drainage Line T.P. Scheme No. 15 (Pal)
in West Zone (Rander), Surat
SR. RATE AMOUNT
Excavation for pipeline trenches for water
supply, sewage line Machine hole etc. all
with shoring and sturting if required as per
required gradient and line including safety
provision using site rails and stacking
excavated stuff up to a lead of 90 mts.
cleaning the site etc. complete for lifts and
strata as specified.
(A) In hard murrum, boulders & macadam
Excavation in bituminous road as per
required gradient and line including safety
provision using site rails and stacking
excavated stuff including up to all required
lead cleaning the site etc, complete for all
lift as specified.
(B) Excavation in Bituminous road 2283.00 288.65 C.M.
Excavation for pipe line trenches for water
supply, sewerage line, Machinehole etc. all
with shoring and struting if required as per
required gradient and line including safety
provisions using site rails and stacking
excavated stuff including up to all required
lead cleaning the site etc. complete for all
lifts and strata as specified.
(A) in all sorts of soil and soft murrum
(A) Upto 1.5 Mt. dpt.from G.L. 33210.00 102.35 C.M.
(C) 3.0 Mt TO 4.50 Mt depth 0.00 118.45 C.M. -
(E) 6.0 Mt TO 7.50 Mt depth 0.00 129.95 C.M. -
Providing and laying compacted granular
bedding as per drawing attached.
PROVIDING AND LAYING STORM DRAINAGE LINE & CONSTRUCTION OF R.C.C.
BOX AT T.P. SCHEM NO. 15 (PAL) ON VARIOUS T.P. ROAD IN WEST ZONE (PHASE-2),
SR. RATE AMOUNT
Providing, maintaining upto the required
period safe guarding lightening the
excavated trenches with proper
barricading, fencing with timber ballies,
bamboos, G.I. Sheetes, red flag and red
lights along with the provision of the
chowkidars as directed by Engineer-in-
Providing and supplying ISI Standard
R.C.C. pipes(of Sulphate Resisting
Cement) in standard lengths of following
class and diameter suitable for rubber ring
joints including all taxes, insurance,
transportation, freight charges, octroi,
inspection charges, loading, unloading,
conveyance to departmental stores,
stacking etc. complete (IS 458/1989)Note:
One rubber ring should be supplied with
each full length socketed pipe, cost
included in rates below.
Lowering, laying and jointing R. C. C.
pipes of following diameters in proper
position, grade and alignment at all level as
directed by Engineer-in-charge including
conveyance from stores to site of work,
labour, giving hydraulic testing as per ISI
(A2) 450 mm dia (NP3 Class) 272.00 1557.65 Rmt.
(A3) 450 mm dia (NP4 Class) 0.00 2375.65 Rmt. -
(B2) 500 mm dia (NP3 Class) 0.00 1702.35 Rmt. -
(B3) 500 mm dia (NP4 Class) 0.00 2554.35 Rmt. -
(C2) 600 mm dia (NP3 Class) 163.00 2208.20 Rmt.
(C3) 600 mm dia (NP4 Class) 0.00 3256.20 Rmt. -
(D2) 700 mm dia (NP3 Class) 235.00 3205.20 Rmt.
(D3) 700 mm dia (NP4 Class) 0.00 4208.20 Rmt. -
PROVIDING AND LAYING STORM DRAINAGE LINE & CONSTRUCTION OF R.C.C.
BOX AT T.P. SCHEM NO. 15 (PAL) ON VARIOUS T.P. ROAD IN WEST ZONE (PHASE-2),
SR. RATE AMOUNT
(E2) 800 mm dia (NP3 Class) 494.00 3522.30 Rmt.
(E3) 800 mm dia (NP4 Class) 30.00 5922.30 Rmt.
(F2) 900 mm dia (NP3 Class) 133.00 3992.00 Rmt.
(F3) 900 mm dia (NP4 Class) 0.00 7029.00 Rmt. -
(G2) 1000 mm dia (NP3 Class) 983.00 5252.25 Rmt.
(G3) 1000 mm dia (NP4 Class) 0.00 8713.25 Rmt. -
(H2) 1100 mm dia (NP3 Class) 0.00 5533.35 Rmt. -
(H3) 1100 mm dia (NP4 Class) 0.00 9141.35 Rmt. -
(I2) 1200 mm dia (NP3 Class) 191.00 6405.00 Rmt.
(I3) 1200 mm dia (NP4 Class) 0.00 10210.00 Rmt. -
(J2) 1400 mm dia (NP3 Class) 1029.00 8178.10 Rmt.
(J3) 1400 mm dia (NP4 Class) 0.00 14801.10 Rmt. -
(K2) 1600 mm dia (NP3 Class) 0.00 11830.55 Rmt. -
(K3) 1600 mm dia (NP4 Class) 0.00 18365.55 Rmt. -
(L2) 1800 mm dia (NP3 Class) 0.00 14355.50 Rmt. -
(L3) 1800 mm dia (NP4 Class) 0.00 20002.50 Rmt. -
(M2) 2000 mm dia (NP3 Class) 0.00 16880.45 Rmt. -
(M3) 2000 mm dia (NP4 Class) 0.00 21718.45 Rmt. -
(N2) 2200 mm dia (NP3 Class) 0.00 19405.40 Rmt. -
(N3) 2200 mm dia (NP4 Class) 0.00 23434.40 Rmt. -
PROVIDING AND LAYING STORM DRAINAGE LINE & CONSTRUCTION OF R.C.C.
BOX AT T.P. SCHEM NO. 15 (PAL) ON VARIOUS T.P. ROAD IN WEST ZONE (PHASE-2),
SR. RATE AMOUNT
Providing & Constructing Machine hole as
per type & design with necessary
excavation, PCC in 1:4:8, benching in 1:2:4
, brick masonary in C.M. 1:4, 12 mm th.
inside plaster in C.M. 1:3, Prov. & fixing
RCC MH frame & cover in c.c. 1:2:4, &
150 mm th. R.C.C. slab in 1:1:5:3 including
prov. fixing polypropylene steps etc. comp.
TYPE-A Upto 600 mm DIA (1200 mm
(Add or Deduct Rs.520 per
0.10 Mt. Depth increase or
TYPE- B1 Upto 1000 mm DIA (1500 mm
PROVIDING AND LAYING STORM DRAINAGE LINE & CONSTRUCTION OF R.C.C.
BOX AT T.P. SCHEM NO. 15 (PAL) ON VARIOUS T.P. ROAD IN WEST ZONE (PHASE-2),
SR. RATE AMOUNT
(Add or Deduct Rs.903.00 per
0.10 Mt. Depth increase or
TYPE- B2 Upto 1000 mm DIA (1500 mm
PROVIDING AND LAYING STORM DRAINAGE LINE & CONSTRUCTION OF R.C.C.
BOX AT T.P. SCHEM NO. 15 (PAL) ON VARIOUS T.P. ROAD IN WEST ZONE (PHASE-2),
SR. RATE AMOUNT
(Add or Deduct Rs.480.00 per
0.10 Mt. Depth increase or
TYPE- B3 Upto 1000 mm DIA (1500 mm
(Add or Deduct Rs.742.00 per
0.10 Mt. Depth increase or
PROVIDING AND LAYING STORM DRAINAGE LINE & CONSTRUCTION OF R.C.C.
BOX AT T.P. SCHEM NO. 15 (PAL) ON VARIOUS T.P. ROAD IN WEST ZONE (PHASE-2),
SR. RATE AMOUNT
TYPE- C1 Upto 1400 mm DIA (1800 mm
(Add or Deduct Rs.996.00 per
0.10 Mt. Depth increase or
TYPE- C2 Upto 1400 mm DIA (2400 mm
PROVIDING AND LAYING STORM DRAINAGE LINE & CONSTRUCTION OF R.C.C.
BOX AT T.P. SCHEM NO. 15 (PAL) ON VARIOUS T.P. ROAD IN WEST ZONE (PHASE-2),
SR. RATE AMOUNT
(Add or Deduct Rs.480.00 per
0.10 Mt. Depth increase or
TYPE- C3 Upto 1400 mm DIA (2400 mm
PROVIDING AND LAYING STORM DRAINAGE LINE & CONSTRUCTION OF R.C.C.
BOX AT T.P. SCHEM NO. 15 (PAL) ON VARIOUS T.P. ROAD IN WEST ZONE (PHASE-2),
SR. RATE AMOUNT
(Add or Deduct Rs.742.00 per
0.10 Mt. Depth increase or
TYPE- D1 Upto 1800 mm DIA (2200 mm
(Add or Deduct Rs.1108.00 per
0.10 Mt. Depth increase or
TYPE- D2 Upto 1800 mm DIA (2400 mm
PROVIDING AND LAYING STORM DRAINAGE LINE & CONSTRUCTION OF R.C.C.
BOX AT T.P. SCHEM NO. 15 (PAL) ON VARIOUS T.P. ROAD IN WEST ZONE (PHASE-2),
SR. RATE AMOUNT
(Add or Deduct Rs.480.00 per
0.10 Mt. Depth increase or
TYPE- D3 Upto 1800 mm DIA (2400 mm
PROVIDING AND LAYING STORM DRAINAGE LINE & CONSTRUCTION OF R.C.C.
BOX AT T.P. SCHEM NO. 15 (PAL) ON VARIOUS T.P. ROAD IN WEST ZONE (PHASE-2),
SR. RATE AMOUNT
(Add or Deduct Rs.742.00 per
0.10 Mt. Depth increase or
TYPE- E Upto 2000-2200 mm DIA (3000
PROVIDING AND LAYING STORM DRAINAGE LINE & CONSTRUCTION OF R.C.C.
BOX AT T.P. SCHEM NO. 15 (PAL) ON VARIOUS T.P. ROAD IN WEST ZONE (PHASE-2),
SR. RATE AMOUNT
PROVIDING AND LAYING STORM DRAINAGE LINE & CONSTRUCTION OF R.C.C.
BOX AT T.P. SCHEM NO. 15 (PAL) ON VARIOUS T.P. ROAD IN WEST ZONE (PHASE-2),
SR. RATE AMOUNT
(Add or Deduct Rs.742.00 per 0.00
0.10 Mt. Depth increase or
decrease.) 115.00
Providing constructing brick masonary
INLET CHAMBER OF 750*600*1500
mm internal dimension with necessary
excavation refilling 350 mm th Br.
masonary in C.M 1:4,150 mm th. p.c.c. &
benching in c.c. 1:2:4,12mm th. plaster in
C.M. 1:3 for inside & cement pointing in
C.M. 1:3 for o/s prov. & fixing precast
RCC frame & cover of M30 grade as per
drawing & specification. rate for 1.5 mt
Add. or ded. Rs. 571 per every 10 cm
increase or decrease in depth
Providing and cast in situ. C.C. in grade M-
25 proportions of ingredients as per mix
design by weigh batching using granite.
quartzite trap metal of size 12 mm to
mm and or 6 mm to 12 mm including
scaffolding centering formwork, needle
vibrated consolidation, curing and
hydraulic testing etc. complete (Excluding
cost of reinforcement) up to 6 meter height
/ depth Av. G.I. for all water retaining
structures. with PCC (M-15) and
reinforcement with TMT FE -
(b) RCC - for base slab 640.00 6705.00 CM
(c) RCC - for top slab 590.00 8077.00 CM
(d) RCC - for wall (Above 25cm) 980.00 7936.00 CM
(e) TMT Fe-500 Reinforcement 310.00 77504.00 MT
PROVIDING AND LAYING STORM DRAINAGE LINE & CONSTRUCTION OF R.C.C.
BOX AT T.P. SCHEM NO. 15 (PAL) ON VARIOUS T.P. ROAD IN WEST ZONE (PHASE-2),
SR. RATE AMOUNT
Providing & constructing brick masonary
ACCESS SHAFT of 850 * 850 mm
internal dimension with 350 mm th. B.B.
masonary in CM 1:4 & i/s & o/s 15 mm th.
cement plaster in CM 1:3 as per drawing &
Add. or ded. Rs. 686 per every 10 cm
increase or decrease in depth
Making connection with the Machine hole
by boring hole on the masonary of Machine
hole and jointing pipe with cement mortar
in prop. (1:2) inside as well as outside of
existing Machinehole, curing etc. complete
as directed by Engineer-in-charge.
3) more than 1600 mm 5.00 2700.00 No.
Dewatering by pumping set of required
capacity including temporary platform
carting pumping at site and fixing the same
in position including all accessories, and
fuel and labour etc. complete. pump set of
(Note :- This item shall only be executed
when bailing out of drainage/sub soil water
is more than 5 H.P.hour).
Refilling the pipeline trenches incl.
ramming, watering consolidating disposal
of surplus stuff as directed within a radius
PROVIDING AND LAYING STORM DRAINAGE LINE & CONSTRUCTION OF R.C.C.
BOX AT T.P. SCHEM NO. 15 (PAL) ON VARIOUS T.P. ROAD IN WEST ZONE (PHASE-2),
SR. RATE AMOUNT
Supplying and laying flexible gabions of
size 1mx1mx1m(mesh size
100mmx100mm) of rope 9mm dia P.P.
materials filled with 10 to 40 kg trap rubble
stone (approximate weight 1.5 tonne) as
per drawing including packing,
interlocking of stones and stitching, fusing
top of gabion and tying to each other and
laying to the required line, level, slope with
all leads and lifts as directed etc. complete.
TOTAL AMOUNT Rs.
TOTAL AMOUNT Rs.
SIGNATURE OF THE CONTRACTOR: - Executive Engineer,
ADDRESS: - West (Rander) Zone,
DATE: - Surat Municipal Corporation,
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Technical Bid_R3.pdf
Schedule-B_R3.pdf
Design Output Final TP-15 Pal w1.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .