| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC BAKOLA JAMUGURIHAT SONITPUR ASSAM PIN 784182 | SONITPUR | ASSAM | 784182 | ₹1.6 Cr | L1 | Accepted-AOC PROPER |
| 2 | L2₹1.6 Cr+₹46.08 (<0.01%)Rejected-AOC | ₹1.6 Cr+₹46.08 (<0.01%) | L2 | Rejected-AOC Not Qualified for AOC |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.6 Cr
EMD Value
₹3.2 L
Closing Date
14 Jul 2020, 2:00 pmClosed
Chief Engineer,W.R.Deptt
O/O Chief Engineer Water Resources Department Chandmari
Immediate measures for restoration of breach like damages at Bojargaon and its adjoining areas by the river Jia Bharali on L/B under SDRF for 2019-20.
2020_DoWR_18040_1
TEZPUR/2019-20/SDRF-II/III
Open Tender
Civil Works
Works
60 days
TEZPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,000
The Executive Engineer, Tezpur W R Division
₹3.2 L
Yes
28 Dec 2020
24 Jun 2020
15 Jul 2020
24 Jun 2020
14 Jul 2020
26 Jun 2020
Amount
Medium Jungles: Clearing medium jungles and trees upto 15 cm. girth including cutting, uprooting roots and stumps, removing them from the site of the work, etc. complete as directed. (When 30% to 60 % of the area is covered by shrubs, trees etc).
Cutting bamboo , uprooting roots & stumps including removing them from the site of work, etc. complete as directed.
Construction of whole Bholuka Bamboo Screen with matured Bholuka Bamboo stacks 75mm to 100mm dia, placed at 30 cm clear apart( i.e. 40 cm C/C) driven 4.00 m to 4.50m below ground and 3.0m to 3.50m above ground with hydraulic driving equipments including hire charge of equipment, cost of P.O.L. etc. and providing with 1 (one) row of horizontal half Jati bamboo kamies tied with galvanized wire of 16 G to 18 G etc complete as directed.(Using Bhaluka Bamboo at the rate of 240.00 nos/ Rm & Jati Bamboo at the rate of 9.60 nos / Rm).
Supply of Ordinary Labour inclusive of all taxes.
Earth work in embankment by Tractor-trailer carriage in locally available ordinary soil excluding rocky soil free from roots & vegetation and filling in uniform layers not exceeding 22 cm. thick including ploughing or roughening or benching the seats, removing all debries, breaking clods up to 2.5 cm cube, dressing as per design section including payment of forest royalty if any, etc. complete as directed. (10% deduction will be made from the section measured quantities of the completed and compacted earth work on account of shrinkage).
Turfing with grass sods of largest possible rectangles of 12 cm. minimum thickness placed closely including dressing earth pagging with Jati bamboo split, watering till the grass grows for a lead up to 90m and all lifts.
Construction of temporrary shed of two roof with mud plinth of 0.45 m height above ground level with Bhaluka bamboo post 1.5 m apart driven at atleast 0.75 m below ground and height above plint 2.5m. Split Jatti bamboo wall mud plastering white washing 2 coats, 10 cm thick touch roofing over bamboo rua frame placing at 0.15 m clear apart fitted with bamboo kamies from binding doors and windows with Bamboo Chattai strengthening with Bamboo frame binding with wire etc compple as directed. (Using Bhaluka Bamboo at the rate of 6.00 nos/ Rm & Jati Bamboo at the rate of 61.00nos / Rm).
Supply of R.C.C. Porcupine member of size 0.10m × 0.10m × 3.00m with cement concrete proportion 1 :2:4, reinforced by 4 Nos. of 8mm dia TMT bar. and 4mm dia (8G) wire stirrups at 15cm. C/C with 2 (two) nos of holes of 20mm dia at 50 cm inside from both sides in the same face and in the other face of member another 2 (two) nos. of holes of size 20mm dia at 65 cm inside from both ends including properly curing for 28 days and supply at specified stackyard complete as directed.
Carriage of Porcupine members by 40 HP Tractor -trailor including local carriage of porcupine members from stack yard to loading site up to a lead of 150m, loading , un loading at river bank near work site etc. complete as directed. (For lead beyond 2 KM and up to 5.00 Km and for all lift).
Labour charge for launching of R.C.C. / PSC Porcupine including carriage of R.C.C./ PSC porcupine members of size 0.10m × 0.10m × 3.00m from the stack yard to the place of launching ,erection of the Porcupine with 6 (six) members properly, supply & fitting/fixing with 12 mm dia 25 Cm long M.S. Nuts and bolts and launching the porcupine properly as directed. (Lead up to 150 m). Launching without boat
Labour charge for launching of R.C.C. / PSC Porcupine including carriage of R.C.C./ PSC porcupine members of size 0.10m × 0.10m × 3.00m from the stack yard to the place of launching ,erection of the Porcupine with 6 (six) members properly, supply & fitting/fixing with 12 mm dia 25 Cm long M.S. Nuts and bolts and launching the porcupine properly as directed. (Lead up to 150 m). Launching by boat
Earth work in embankment by Tractor carraige in ordinary/normal soil excluding sandy and rocky soil free from roots & vegetation and stacking in regular measurable stacks at suitable places including clearing and levelling the stacking site, breaking clods up to 2.5cm cube, payment of forest royalty if any, etc. (12.50 % deduction will be made from measured quantities on account of shrinkage) For initial Lead beyond 1/2 Km and upto 2.00 km for all lifts.
Spreading of earth stacks over the crest and slope of embankment and places as directed in uniform layer of 22 cm. thick including breaking clods, dressing, ramming etc. complete where necessary including dressing the embankment before complete as directed.
Construction of leets fencing weth 75 mm to 100 mm dia matured jati bamboo stacks placed 150mm clear a part and 1.2 m to 1.8 m above ground and 1.00 m to 1.2 m below ground level. (Using Jati Bamboo at the rate of 8.67 nos / Rm).
MD KHURSIDUL ISLAM
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .