| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
17 Jun 2024, 4:00 pmClosed
HOD (MKTG AND PPC)
KEL MAMALA KOCHI
SMART CITY - UPGRADATION OF AZHANKAL WALKWAY- HANGING BRIDGE IN THIRUVANANTHAPURAM-Civil Works
2024_KEL_674173_1
KRO/BDC/1633A/2024
Open Tender
Civil Works - Bridges
Item Rate
300 days
KEL MAMALA
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,950
₹50,000
Yes
19 Jun 2024
4 Jun 2024
18 Jun 2024
4 Jun 2024
17 Jun 2024
4 Jun 2024
4 Jun 2024 - 17 Jun 2024
Amount
Civil works
Conducting Soil Investigation, Detailed Report and connected works, etc. at 2 banks of the river
Dismantling of existing steps and levelling the ground for providing pile and pile cap (As per actuals)
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
Making bund by using coconut piles and sheets and filling with contractor's own earth fit for the pile driving with all accessories including material and labour etc complete (As per actual material and Labour Supplied).
Making a platform by filling with contractor's own earth fit for placing tripod with all accessories including material and labour etc complete
Providing, driving and installing driven cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of shoe and the length of pile to be embedded in the pile cap etc. all complete. (Length of pile for payment shall be measured from top of shoe to the bottom of pile cap): 600 mm dia piles
Pile Socketing 600mm dia for a min. of 600mm depth
Supply of MS plates confirming to IS 2062GrB including cost of conveyance charges
Fabrication, erection and commissioning of Structural steel Embedded parts in IS2062 Grade and accessories as per approved specifications, drawings and directions of deptl officer at site including cost of labour , machinery , incidental and handling charges etc complete but excluding cost of material already supplied
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in -charge. Note:- Cement content considered in this item is @330 kg/cum. Excess /less cement used as per design mix is payable/recoverable separately. All work upto plinth level
Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in -charge. Note:- Cement content considered in this item is @330 kg/cum. Excess /less cement used as per design mix is payable/recoverable separately. All work above plinth level upto floor V level
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo - Mechanically Treated bars of grade Fe-500D or more
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo - Mechanically Treated bars of grade Fe-500D or more
Centering and shuttering including strutting, etc. and removal of form for: Foundations, footings, bases of columns, etc for mass concrete
Centering and shuttering including strutting, etc. and removal of form for: Columns, Pillars, Piers, Abutments, Posts and Struts
Centering and shuttering including strutting, etc. and removal of form for: Lintels, beams, plinth beams, girders bressumers and cantilevers
Centering and shuttering including strutting, etc. and removal of form for: Stairs, (excluding landings ) except spiral - staircases)
12 mm cement plaster of mix: 1:4 ( 1 cement : 4 fine sand)
Finishing walls with Acrylic Smooth exterior paint of required shade: New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
Supplying and Fixing of 2nos Inaugural Stone and 2 Nos. Name board as directed by the engineer in charge
EXCLUSIVE OF GST
Note :1 All materials, Items, Equipment shall be best branded items with IS and approved by client/KEL
2:Rate should be inclusive of Insurance,Transportation, delivery and installation cost for all items
3.Rate should be Exclusive of GST.
4.Work should be executed as per DSR/PWD specification and direction of Engineer at site.
5.CEMENT: Make use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference.
6.RCC: (Assessment of strength of concrete by Cube testing at Approved Govt labs as per IS) Cement make: Use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference.
7.STEEL REINFORCEMENT: Make: Tata,Vaishak, SAIL, JSW or eq primary make in the order of preference
8.CENTERING & SHUTTERING: (Centering and shuttering for different category of work may be considered separately.)
9. ACRYLIC SMOOTH EXTERIOR PAINT/ SYNTHETIC ENAMEL PAINT/WHITE CEMENT BASED PUTTY/ CEMENT PRIMER: Make: Asian, Berger, Nerolas or eq. in the order of pref.
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .