Loading…
Loading…
Tender Value
₹5.6 L
EMD Value
₹11,200
Closing Date
29 Aug 2026, 4:00 pm5d left
Executive Engineer RnB Division Tangmarg
Executive Engineer RnB Division Tangmarg
Re-Location of existing Boiler (Central Heating) installed in VIP Huts at Gulmarg
2026_PWDJK_321713_1
NIT No. 57/RnB/Tangmarg of 2026-27
Open Tender
Civil Works
Percentage
25 days
Tangmarg
Please refer Tender documents.
3 documents required · 3 mandatory
₹300
Executive Engineer RnB Division Tangmarg
₹11,200
20 Aug 2026
20 Aug 2026
31 Aug 2026
21 Aug 2026
29 Aug 2026
21 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches forfoundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil :1m leadl : | 10.19 | cum | 479.3 | ₹4,884.07 |
| 2 | Providing and laying in position dry Nallah soling / Boulder filling with hand packing including carriage by Mechanical Transport / Manual Head Load (if any). Complete job | 5.1 | cum | 1,100 | ₹5,610 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:4:8 Mix (1 cement : 4 coarse sand : 8 graded stone aggregate 20 mm nominal size) exncluding carriage of ingrediants (mechanical / manual). Complete Job | 2.43 | cum | 5,202.9 | ₹12,643.05 |
| 4 | P/L in position cement concrete of specified grade excl. the cost of centering and shuttering: 1:2:4 (1 cement 2: coarse sand :4 graded stone crushed agg.20mm nominal size). Incl. all carriages of material involved | 9.05 | cum | 6,591.25 | ₹59,650.81 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. Allworks upto plinth level.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 3.4 | cum | 7,788.4 | ₹26,480.56 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with
1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.7 | CUM | 9,821.85 | ₹16,697.15 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing | 433.5 | kg | 123.2 | ₹53,407.2 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. | 47.7 | sqm | 628.95 | ₹30,000.92 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platforms. | 11.15 | sqm | 718.2 | ₹8,007.93 |
| 10 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in
foundation and plinth including curing in : | 4.61 | cum | 7,877.4 | ₹36,314.81 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
BOQ_1075318.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].