Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.7 LAdmitted-Finance H NO 246 DEULWADA BORIM PONDA GOA | PONDA | GOA | ₹10.7 L | L1 | Admitted-Finance |
| 2 | L2₹14.1 LAdmitted-Finance H NO 246 NR NAVADURGA TEMPLE DEULWADA BORIM PONDA GOA | NORTH GOA | GOA | 403001 | ₹14.1 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Shri Ramprasad G S Borkar L2 | Shanti Lawande L1 |
|---|---|---|---|---|---|
| 1.00 | Providing and erecting a "Thrie" metal beam crash barrier comprising of following three factory made unites-viz. 1) Thrie Beam 2) Spacer Block 3) Vertical Post. The Thrie beam 3mm thick cold roll formed guard rail raw material Conforming to IS-5986-2011 with minimum Grade 255 & with minimum yield stress of 255 Mpa which is fixed by bolted connection to spacer block C-channel of size 75mmx150mm & 5mm thick, 54.6cm height spaced 2meter centre to centre, fixed to Vertical Post C-channel of size 75mmx150mm &5mm thick cold roll formed section made from HR coils raw material conforming to IS-5986-2011 with minimum Grade 255 & with minimum yield stress of 255MPa, with 85cms free height above road or Ground level, and embedded to 115cms deep in cement concrete block of size 35cm*35*115cm of minimum grade M15 (1:2:4) or as directed by Engineer Incharge, assembled & fixed as per drawings of MORTH&H Circular No.RW/NH/33022/1/94-DO/III, dated 24/6/1994 & construction operation as per 811 or relevant MORT&H specifications for Roads & Bridge Works (latest edition). All fittings (bolts,nuts,fasteners,washers etc.) shall be conforming to IS:1367 & IS:1364 & galvanished by hot dip zinc coated process @0.55kg/m2 conforming to relevent IS specifications all etc.complete | 180 | RM | 6,611.22 ₹14.0 L | 5,037.6 ₹10.7 L |
| 2.00 | providing and fixing reflective tape by preparing the surface from all dirt / dust and as directed by the Engineer in charge. Complete. | 3.6 | Sqm | 329.66 ₹1,400.40 | 251.26 ₹1,067.36 |
| 3.00 | Clearing jungle including up rooting of rank vegetation grass bush wood trees and sapling of girth upto 30 cm. measured at a height of 1 m above ground level & removal of rubbish upto a distance of 50 mt. outside the periphery of the area cleared. (if however, only grass is met with the area will be measured and paid for under item 4001). | 180 | Sqm | 10.49 ₹2,228.08 | 8 ₹1,699.20 |
Tender Value
₹13.4 L
EMD Value
₹26,820
Closing Date
27 Jan 2026, 5:00 pmClosed
EE II
aquem baixo
Providing and erecting safety crash barriers along the I.P. at Ch. 0.00 km to Ch. 0.030 kms, Ch. 0.790 km to Ch. 0.820 kms, Ch. 1.410 kms to Ch. 1.530 kms of the Paroda Canal at Paroda, Salcete Taluka.
2026_WRD_27198_1
WDII/TECH/F17/29e/2025-26/SN3
Open Tender
Miscellaneous Works
30 days
Rawanfond
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹26,820
2 Feb 2026
13 Jan 2026
28 Jan 2026
13 Jan 2026
27 Jan 2026
13 Jan 2026
Providing and erecting a "Thrie" metal beam crash barrier comprising of following three factory made unites-viz. 1) Thrie Beam 2) Spacer Block 3) Vertical Post. The Thrie beam 3mm thick cold roll formed guard rail raw material Conforming to IS-5986-2011 with minimum Grade 255 & with minimum yield stress of 255 Mpa which is fixed by bolted connection to spacer block C-channel of size 75mmx150mm & 5mm thick, 54.6cm height spaced 2meter centre to centre, fixed to Vertical Post C-channel of size 75mmx150mm &5mm thick cold roll formed section made from HR coils raw material conforming to IS-5986-2011 with minimum Grade 255 & with minimum yield stress of 255MPa, with 85cms free height above road or Ground level, and embedded to 115cms deep in cement concrete block of size 35cm*35*115cm of minimum grade M15 (1:2:4) or as directed by Engineer Incharge, assembled & fixed as per drawings of MORTH&H Circular No.RW/NH/33022/1/94-DO/III, dated 24/6/1994 & construction operation as per 811 or relevant MORT&H specifications for Roads & Bridge Works (latest edition). All fittings (bolts,nuts,fasteners,washers etc.) shall be conforming to IS:1367 & IS:1364 & galvanished by hot dip zinc coated process @0.55kg/m2 conforming to relevent IS specifications all etc.complete
providing and fixing reflective tape by preparing the surface from all dirt / dust and as directed by the Engineer in charge. Complete.
Clearing jungle including up rooting of rank vegetation grass bush wood trees and sapling of girth upto 30 cm. measured at a height of 1 m above ground level & removal of rubbish upto a distance of 50 mt. outside the periphery of the area cleared. (if however, only grass is met with the area will be measured and paid for under item 4001).
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
Tendernotice_2.pdf
PDF • 0.14 MB
BOQ_27631.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid