The Executive Engineer (O&M), DGVCL Piplod Division Office, Surat.
Tender for works of maintenance of transformers center on ARC basis & supply Installation, Testing & commissioning earthing system for transformer centers with Maintenance Free, Ready Capsules ,Pipe in cage (PIC) type Earthing for Piplod sub division and All sub division under Piplod Division.
367439
DGVCLDPPL/0228/11/2026 Approved Date: 19-11-2026
Open
Electrical
Works
Surat
1 document required · 1 mandatory
₹1,180
SURAT DGVCL
₹24,000
19 Nov 2026
19 Nov 2026
19 Nov 2026
7 Dec 2026
19 Nov 2026
180 days
3 Estimated Cost Rs.
4 Tender Fees (Non Refundable) with 18% GST Rs. 1000+180 (18 %GST)=1180.00
5 Earnest Money Deposit Rs.24,000.00( 1 % of Tender Amount)
Last Date of On Line (E-Tendering) submission of Date :__________ on
Tender ( Between > 7 to 21 days) Time : Up to 18.00 Hrs.
Date :___________ on
7 Last Date of submission of Tender Fee & EMD
Time : Up to 11.00 Hrs.
Date of opening of Preliminary Stage (Tender Fee & Date : __________ on
EMD) Time : Up to 11.00 Hrs.
Tentative Date of opening of Technical Bid
Time : Up to 14:00 Hrs.
Date : __________ on
10 Tentative Date of On line Opening of Price Bid
Time : Up to 16.00 Hrs.
11 Validity of Tender Maximum period of 180 Days
12 Work Completion Period / Time Limit 12 Months (As per quantum of work)
DGVCL GSTIN No. is ______________________.
Every Bidder has to inform their GSTIN No. at the time of payment of applicable fees.
a. Interested Bidders can view these tender documents online. The bidders who are interested in bidding in these
tenders can download tender documents from website https://tender.nprocure.com .
Bidders, who wish to participate in this tender, will have to register on www.nprocure.com. Further, Bidders who wish
to participate in online tenders will have to procure Digital Certificate as per Information Technology Act-2000 using
which they can sign, their electronic bids. Bidders can procure the same from GNFC, Ahmedabad, who are licensed
certifying authority by Government of India and they will assist them in procuring the same as below mentioned
address. Bidders who already have a valid Digital Certificate need not procure a new Digital Certificate.
n) Code solutions-A PIPLOD DIVISION of GNFC Ltd.,
301, GNFC Info tower, S.G. Road, Bodakdev
Ahmedabad – 380054 (Gujarat)
Email: [email protected]
b. However, no physical documents required if payment of tender Fee and EMD made through, RTGS &
NEFT(upload receipt online on https://tender.nprocure.com ).
c. Further bidders are requested to submit price bid (Schedule: B) on-line only and not to submit the price bid in physical
File No: DGVCLDPPL/OTH/e-file/4456/2026/7107/CFC TECHNICAL
Approved By: Executive Engineer,Technical,DGVCLDPPL
Letter No: DGVCLDPPL/0228/11/2026 Approved Date: 19-11-2026 10:27
form. This is mandatory. If price bid is submitted in physical form, such offer shall be out rightly rejected.
d. It is mandatory for all the bidders to submit their tender documents with all relevant documents as desired in
participation of this bid through on-line (e-tendering) in schedule time. If tender documents with all relevant documents
submitted in physical form, in that case the online submitted documents shall be considered.
e. Bidders should be in touch with websites https://tender.nprocure.com for intimation regarding
revision/corrigendum/Amendment in tender till due date of online submission and thereafter. No separate information
shall be sent in this regards and also not publish in newspaper. The directives and amendments issued
by DGVCL will have superseding effect to relevant section and specifications.
f. Any technical questions, information & clarification that may be required pertaining to this inquiry should be referredto
Executive Engineer PIPLOD DIVISION Office, “ Dakshin Gujarat Vij Company Limited”
g. DGVCL reserves the right to reject any OR all tenders without assigning any reasons thereof.
h. Bank Details:
Name of Bank: Bank of Baroda
Account Number:
Branch Name: Piplod
Type of Account: Non Operative
IFSC Code: BARB0PIPLSU
Executive Engineer
DGVCL, PIPLOD DIVISION
DAKSHIN GUJARAT VIJ CO LTD.
Division OFFICE.
1st floor, t.p-13, f.p.-12, opp. E-space, new VIP road,
Bhagvan Mahavir collage char Rasta, Vesu Bhrathana,
TENDER NOTICE NO.
Tender No.: PIPD/O&M/Tender/26/ Dtd:
Invitation Sub: - Tender for works of maintenance of transformers center on ARC basis Piplod sub division and All sub division under
Piplod Division.
Pre-Qualification clause:
1.) Party shall have to submit their experiences / satisfactory performance certificate of jobs executed for similar works of similar
value at other Discom / DGVCL / NTPC and other power utility for issue of tender.
2.) They should have completed at least 3 orders of equal value of similar type jobs in the last three years satisfactorily directly
without giving the sub-contract.
3.) The contractor should have minimum permanent staff of five Laborers out of which there should be one persons holding
supervisor license, one persons wiremen license & three persons apprentice license issued by Electrical Inspector, Surat
4.) The Bidder should have separate Pan no & P.F. Code No. from the RPFC. The contractor who is not having separate P.F. Code
No. shall not be considered for acceptance of the Tender. In support of PF account he shall submit online along with Technical Bid
the copy of challan of preceding two months paid to PF treasury. (If applicable)
5.) The contractor should be holding GOG approved Electrical contractor License. He shall submit online along with technical bid the
authentic copy of this license, zerox of staff register and Solvency Certificate.
6) Above all document attached online.
Name of Contractor __________________________
File No: DGVCLDPPL/OTH/e-file/4456/2026/7107/CFC TECHNICAL
Approved By: Executive Engineer,Technical,DGVCLDPPL
Letter No: DGVCLDPPL/0228/11/2026 Approved Date: 19-11-2026 10:27
01 Should the tender be accepted I / We hereby agree to abide by and fulfill all the terms and conditions
of the tender as applicable and in default thereof to forfeit and pay to the DGVCL the sum of money
02 The full value of the Earnest money deposit paid herewith should absolutely be forfeited to the
DGVCL if I / WE not deposit the full amount of security deposit in time.
03 I / we understand and agree that canvassing in any form will disqualify me / us.
Date: Sign. & Seal of contractor
Executive Engineer (O&M),
DGVCL, Piplod Division
Name of work: Tender for works of maintenance of transformers center on ARC basis Piplod sub division and All sub division under Piplod
Description Page No.
01 Section-A: Letter of Invitation of Tender & instructions to the Bidder. 4 to
02 Section-B: 11 to
Section-C, Schedule-B: Schedule of price.
04 Section-D : Special Conditions 17 to
05 Section-E: General Terms & conditions of contract applicable to works. 22 to
06 Section-F : Labour Laws and Safety Rule
Qualification Criteria
Tender fee and EMD should be paid, otherwise tender will not be considered. Copy of Transaction
acknowledgement to be compulsorily emailed at [email protected] besides uploading the
same online Banks Detail as under:
Sr.no Name Account no. IFSC Code MICR Code
1 Daksin Gujarat Vij 31530200000249 BARB0PIPLSU
1. The bidder has to pay Tender fee.
2. The bidder has to pay EMD.
3. The average annual turnover during last 3 years, ending 31st March of the previous financial year of the applicant should be
at least 30% of the estimated cost ( i.e 2024-25,2023-2024,2022-2023). Contractor should produce the Audited Balance
sheet with profit and loss account of last 3 Years (i.e 2024-25,2023-2024,2022-2023) or C.A Certificate.
4. Contractor should produce evidence of experience of having successfully completed similar works during the last Seven years
ending last day of month previous to the one in which applications are invited should be either of the following in Govt., /Semi
Govt., along with certified copies of documentary evidence, preferably photo copy of orders secured from
DGVCL/MGVCL/UGVCL/PGVCL/GSECL/GETCO/DISCOMs/GEB/Central/State Government/ Semi-Government and
File No: DGVCLDPPL/OTH/e-file/4456/2026/7107/CFC TECHNICAL
Approved By: Executive Engineer,Technical,DGVCLDPPL
Letter No: DGVCLDPPL/0228/11/2026 Approved Date: 19-11-2026 10:27
satisfactory completion certificate from respective department thereof:-
a) Three similar completed works costing not less than the amount equal to 40% of the estimated cost.
b) Two similar completed works costing not less than the amount equal to 50% of the estimated cost.
c) One similar completed works costing not less than the amount equal to 80% of the estimated cost.
The DGVCL may verify the above certificates / documents from respective department, if necessary.
5. Bidder must have following documents
PF registration certificate.
6. Duly signed tender document.
7. The bidder has to submit the copy of latest solvency certificate issued by any nationalized/schedule bank amounting 20% of
estimated cost. The solvency certificate should not be issued before 1 year from the scheduled date of opening of technical
8. Criteria stated at clause no. 3 & 4 shall not be applicable for New Bidders.
9. QUANTITY DISTRIBUTION
The total quantity distribution to the new bidders will be restricted up to 25% of the estimated amount in case of new
bidders stands L-1. However, if the quoted price of new bidders is higher than regular bidders, then there will be no any
quantity distribution is allowed to new bidders.
The New Bidder is to be asked to match the L-1 price of the New Bidder only and the Regular Bidder has to match
the L-1 price of the Regular Bidder.
10. For quantity distribution among regular bidders at DGVCL’s sole discretion; higher weightage will be given to L1
bidder and DGVCL may allotted quantity to L-1, L-2 and so on, if bidder consented.
Above mentioned documents needs to be submitted along with the tender documents compulsory.
INVITATION OF TENDER & INSTRUCTIONS TO THE BIDDERS
File No: DGVCLDPPL/OTH/e-file/4456/2026/7107/CFC TECHNICAL
Approved By: Executive Engineer,Technical,DGVCLDPPL
Letter No: DGVCLDPPL/0228/11/2026 Approved Date: 19-11-2026 10:27
SUB: Tenders for works of maintenance of transformers center on ARC basis Piplod sub division and All sub divisionunder Piplod Division.
1. Tenders for the said works are invited in accordance with the following:
a) Section-A-This letter regarding invitation to tender and instructions to Bidder.
b) Section-B Technical specifications and scope of work as per attached.
c) Section-C-Cost of equipment and other charges as per schedules B. (-C)
d) Section-D-Sp. Conditions.
e) Section E- General Terms & condition of contracts applicable to work Contract.
Section-G-1& Section-G-2
f) Section-F- Terms and conditions regarding Labour laws and other related matters attached. (Applicable for erection/works to be carried
g) Conditions mentioned in This Invitation of Tender & Instructions to the Bidders shall over ride similar conditions mentioned in the “General
terms and conditions of contracts enclosed as Section-E. If you are in a position to quote, your tender should be submitted to this office
on or before due date.
h) In this offer the word “DGVCL” means DGVCL, Surat having its corporate Office at Nana Varachha Road, Kapodra, Surat .Printed terms
& conditions of the Bidder will not be considered as forming part of the tender.
j) Bidder must indicate the official designation and authority of the individual signing the tender.
The Bidder shall submit their P.F. code no. allotted to them by Regional P.F. Commissioner and copy of chalan through which PF deposit in
provident office. Failure to do so is likely to result in the offer being ignored.
The tender will be opened on the date and time specified as above in office of the Ex. Engineer (O&M), DGVCL, Piplod , Surat in presence of the
authorized representatives of the Bidder, who wish to remain present at the time of bid opening.
Bidder is responsible for ensuring that the bids are actually received well in time and at the place mentioned above only. DGVCL shall be neither
responsible for late
Tender neither receipt nor shall entertain Tenders received after due time and date.
3. INFORMATION:
Tender Fee & Earnest Money Deposit Paid Online.
4. OFFER TO BE MADE ACCORDING TO TENDER DOCUMENTS:
The EMD will be released in accordance with the following conditions.
a) In the case of the successful Bidder, the EMD will be refunded after the Bidder has furnished fully security deposit in accordance with
clause 10 below.
b) In the case of unsuccessful Bidder, the EMD will be refunded after the execution of a contract with the successful Bidder or “after the
validity of his” tender expires, whichever is earlier.
If the successful Bidder withdraws his tender within the validity date or fails to give the required security deposit within the time specified in
General Terms and Conditions, he shall be liable for any difference by which the cost of procuring the supplies/works exceeds the amount of his
tender and the EMD shall be adjusted towards off-setting such difference. Firms being SSI and registered with NSIC are exempted from payment
of EMD against submission of validity certificate.
6.00A1 SECURITY DEPOSIT:
Successful Bidder shall pay security deposit equivalent to 5% of the order value within a week from the date of issue of letter of Intent. The
Security Deposit shall be paid by Crossed demand draft drawn on Bank of Baroda, Surat in favour of “Dakshin Gujarat Vij
Co. Ltd”, this security deposit will be valid till work completed satisfactorily and final bill is paid.
6.00A2 This Security Deposit is for the due performance of contract and the same is liable to be forfeited by the DGVCL in event of non-fulfillment of the
terms & conditions of this contract by the contractor.
6.00A3 Refund of S.D. will only be made on return of the original money receipt given by the DGVCL or in case of loss of the receipt the contractor shall
furnish an indemnity Bond duly stamped under the Bombay stamps act.
7.1 The Bidder shall quote firm prices only. The prices quoted will not be subject to any escalation till completion of work except of statutory
variation taxes.
The tender shall remain open for acceptance for a period of One hundred Eighty (180) days from the date of price bid opening. The
DGVCL will intimate the date and time for opening of price bids, after receipt and scrutiny of Technical bids.
Any further extension of validity, if and when requested, shall be given without changing prices, terms and conditions. Also the validity of
EMD shall be extended accordingly.
The Bidder shall have to furnish attested copy of Registration Certificate issued by GST Deptt. Mentioning GST Tax Registration No. and
the same is to be shown in each invoice.
8.1. INCOME TAX:
Deduction of Income Tax from the bill shall be made as per Income Tax Rules prevalent at the time of payment.
File No: DGVCLDPPL/OTH/e-file/4456/2026/7107/CFC TECHNICAL
Approved By: Executive Engineer,Technical,DGVCLDPPL
Letter No: DGVCLDPPL/0228/11/2026 Approved Date: 19-11-2026 10:27
9. PAYMENT TERMS:
9.1 No advance payment shall be made.
(i) 100% Bill amount to be paid on successfully completion of work. Bills for this purpose to be raised on basis of actual work
10. PENALTY FOR DELAYS:
The delivery, erection and commissioning periods (as applicable) shall be guaranteed under penalty clause mentioned below.
Any delay that may take place in erection and commissioning activities beyond contractual cut of date shall be subject to penalty at the rate
of 1/2% of the sub contract value (of delayed materials/works) per week or part thereof subject to a maximum of 10% of the total order value.
INSURANCE ERECTION AT SITE:
This is entirely in the scope of the Bidder; the bidder will have to make their own arrangements for insuring the all materials and
equipments possessed by him and also for Laborers etc. The DGVCL will not be responsible for any loss or damage either to Bidder’s personnel
or to the equipment/materials.
12. PRINTED TERMS & CONDITIONS WILL NOT BE CONSIDERED:
Printed terms & conditions of the Bidder will not be considered as forming part of the tender.
13. DESIGNATION & AUTHORITY OF THE PERSONS SIGNING THE TENDER:
Bidder must indicate the official designation and the authority of the individual signing the tender.
14. BIDDERS TO ENSURE RECEIPT OF THE OFFERS BY EXECUTIVE ENGINEER (O & M), DGVCL, Piplod Division, Surat.
Bidder is responsible for ensuring that their tenders are actually received in time and the place mentioned above.
15. CANVASSING NOT PERMITTED:
Bidder should not canvass their offer personally or otherwise by approaching to any Officers of the DGVCL. If any Bidder wants to make any
representation regarding his offer, he should write to undersigned, but personal oral representation is not permitted.
Inspite of the above clear instructions, if any Bidder is found to canvass his offer or against his competitor’s offer through personal approach to
officers of the DGVCL, his offer will be rejected without assigning any reason and the firm may even be blacklisted.
16. CLARIFICATIONS REQUIRED BY BIDDER:
If any Bidder require any information and/or clarification on any point of technical or commercial nature pertaining to this tender enquiry or on any
of the conditions or requirements indicated in the tender documents, the same should be given in writing in duplicate to the under mentioned
Executive Engineer (O&M), D.G.V.C.L., Piplod Division, Surat
TIME LIMIT:- The time limit of the tender is 12 Month .
17. ARBITRATION CLAUSE:
All questions, disputes or differences what so ever which may at any time rise between the parties to this agreement touching the agreement or
subject matter thereof, arising out of or in relation thereto and whether as to construction or otherwise shall be referred to the decision of the sole
Arbitrator, appointed by the chairman, DGVCL for that purpose, who shall be a retired High Court Judge or a retired District and sessions Judge
and the decision of the said, Arbitrator shall be final and binding upon the parties. Reference to the Arbitrator shall be governed by the provision
of Indian Arbitration & Conciliation Act, 1996 as amended from time to time and the rules made there under. The arbitration proceedings shall be
conducted at Chief Engineer (O&M), DGVCL, Corporate Office, Surat or at such places as the sole Arbitrator may determine. The award of sole
arbitrator shall be final and binding upon the parties. The arbitrator shall pass reasoned award.
Necessary contract agreement shall have to be executed in prescribed format by successful bidder on a stamp paper of appropriate value of Rs.
300/- at their own cost. The agreement is to be executed for the complete work referring to this work order and shall be signed by an authorized
person of your company with seal of the bidder. For this purpose, their authorized signatory shall have to visit this office on any working day, as
some of the documents have to be signed in presence of DGVCL’s officials.
19. TERMINATION:
The DGVCL may terminate the contract at any time by giving a written notice of 30 days for any case if your performance as a whole OR part, is
found unsatisfactory. Whether terminated for a cause of convenience, payment to the actual work done and the calculated pro-rata and not to
lump sum amount payable under the normal conditions for the successful completion of the entire work. In addition in case of contract is
terminated for convenience and though no fault of you. You shall be paid also for commitments, which cannot be terminated and paid at the time
of termination. Upon receipt of written notice, you shall attempt to terminate all commitments and otherwise minimize all costs.
To order that the work of the contractor be measured up and to take such part thereof, as shall be unexecuted, out of his heads and to give it to
another contractor to complete, in which case, any expenses, which may be incurred in excess of the sum, which would have been paid to the
original contractor, if the whole work had been executed by him (as to the amount of which excess expenses the certificate in writing of the
Engineer-in-charge shall be final, conclusive and shall be borne and shall be paid by the original contractors and shall be deducted from any
money due to him by the DGVCL under the contract or otherwise from his security deposit of the proceeds sale thereof or a sufficient part thereof.
20. FORCE MAJEURE:
File No: DGVCLDPPL/OTH/e-file/4456/2026/7107/CFC TECHNICAL
Approved By: Executive Engineer,Technical,DGVCLDPPL
Letter No: DGVCLDPPL/0228/11/2026 Approved Date: 19-11-2026 10:27
Force majeure is herein defined as
(1) Any cause which is beyond control of a Seller or The DGVCL as the case may be
(2) Natural phenomena including but not limited to weather condition, floods, droughts, earthquakes and epidemics
(3) Acts of any Governmental authority domestic or foreign including but not limited to war, declared or undeclared, priorities, quarantine,
embargoes, licensing control or production or distribution restrictions
(4) Accidents and disruptions including but not limited to fires, explosions, breakdowns, of essential machinery or equipment and power
(5) Transportation delay due to force majeure or accidents:
(6) Strikes, slowdown, lockouts and sabotage
(7) Failure or delay in the Seller’s source of supply due to foregoing force majeure causes and
(8) Failure to reach agreements as set forth below.
(a) The Seller shall not be liable for delays in performing his obligation resulting directly or indirectly from any Force Majeure cause as
referred to and defined in paragraph (a) above.
(b) The Seller shall within 10 days from the beginning of any such delay notify the DGVCL in writing of the cause of delay.
(c) The DGVCL shall ascertain the facts and the delivery period shall subject as hereinafter provided, be extended for a period equal
to the time lost by reason of any such cause even though such cause may occur after the Seller’s performance of his obligation has
been delayed for other causes. If such delay lasts for more than 6 months, the DGVCL and Seller shall immediately consult each
other for purpose of agreeing upon a reasonable basis on which the contractor shall resume production of the unfinished equipment
and if the parties do not agree upon a solution of the problems involved, including adjustment of the price, such price adjustment
being both upwards and downwards depending on the variation in the base indicates of materials and labour (Provided however if
complete dispatch is made within 12 months from the commencement of delay there shall be no price adjustment) then either party
may, by written notice, cancel that portion of the equipment which is delayed. In the event of cancellation, the parties shall endeavor
to agree on the amount of reasonable and proper cancellation charges, if any, if they fail to reach an agreement within 90 days after
the date of cancellation, either party may refer the matter to arbitration pursuant to Article 40. All the provisions clause shall apply
whether the disruption caused is total or partial in its effect upon the ability of the Seller to perform.
21. If you are in a position to quote, your tender in quadruplicate should be submitted to this office on or before due date. If the Bidder wishes, he may
familiarize himself with the site conditions by visiting plant / site office.
Any representation at a letter date in this regard shall not be entertained. On production of proof of purchase of the tender documents, the site
officers will permit for site visit.
The DGVCL reserves the right to accept any tender and or to reject any or all tenders without assigning any reason thereof. No correspondence
shall be entertained in this regard.
Yours faithfully,
Enclosure: As Above.
Executive Engineer (O & M),
DGVCL, Piplod Division, Surat.
TECHNICAL SCOP OF WORK
2. The work entrusted as per the contract should be soundly constructed in accordance with the best practice and should present a neat
appearance when complete. All the works have to be carried out accordingly to the drawing and specifications and as per the instruction
of Engineer-in-charge. There should not be any damage or injury to material of other’s property during transport or erection.
3. Before commencing erection of items, the contrctor will be provided, with the pole Schedule and lay our map which gives the type of the
support number of guys, earthing etc. are every one of the location market in the layout map.
4. Marshy or water logged locations must be avoided as far as possible. If it becomes inevitable to locate poles at such points special pre-
cautions about foundation will have to be taken and work carried out as per instruction of Engineer-in-charge.
5. The spans shall be specified in the pole schedule in the minimum spacing between the power conductors and neutral shall be as shown
in approved drawings.
2. SUPPLY OF MATERIALS :-
All materials such as LT cable, transformer Dist. Box, Kit-Kat fuse, fuse elements, breather, insulated conductor, earthing plate etc. required
File No: DGVCLDPPL/OTH/e-file/4456/2026/7107/CFC TECHNICAL
Approved By: Executive Engineer,Technical,DGVCLDPPL
Letter No: DGVCLDPPL/0228/11/2026 Approved Date: 19-11-2026 10:27
for erection will be supplied at the Company Stores at Piplod Store only the rates quoted should be inclusive of transportation to site from the above
stores and erection work. The conductors will be supplied in coils or in drums as per standard packing received from suppliers. The crates should be
returned to the stores and stacked at the directed place.
The earthing device shall be of the pipe /coil / G.I. strip type as indicated in the pole schedule. The work of earthing must be carried out as per
drawing and at the places selected by the field Engineer. Coke or Charcoal powder & salt will have to be procured by the contrctor Erection of earthing
should be carried out under the supervision of the representative of the Engineer-in-charge. No. amount will be paid if the work is not done in accordance
with their instructions. Contractor has to submit photographic evidence with clear visibility of earthing pit, salt coal, GI Strip, transformation location
number in soft copy with file name.
A soft copy of photograph in CD/DVD taken by camera, not than 2 MP (1600 X 1200 pixel) with necessary content and visibility as above shall be
submitted with final bill at the cost of contractor.
Water should be poured in the earth pit.
The earth resistance of transformer natural & body should be tested by an earth magger & it should be not be more than 2 Ohms after earthing.
The contractor should measured value of earthing after work carried out and shall submit written work completion in prescribed format.
Sr.No. Name of feeder Date of execution T/C location & Before earthing After earthing
7. GENERAL CONDITION OF CONTRACTOR:-
1. All single pole structures, special strucial; structures & fitting of cross arms, earthing etc. should be carried out according to standard drawings
available or reference in the Company’s Divisional Office.
2. Quantities: - The quantities mentioned in the accompanying schedule are only approximate, Actual quantities may increase or decrease
according to the local conditions. The company reserves the right or revising or deleting any of the quantities to be erected by during the
execution of the contractor and the final quantities actually erected by the contractor will be calculated and paid for at the rates given in the
contractor schedule of rates.
(a) Whenever there is an excess work carried out by a contractor beyond the technically sanctioned amount against the work order, the
approval for the excess quantity of work done should be obtained from the competent authority as per Company’s rules.
3. Dakshin Gujarat Vij Co. Ltd. Does not bind itself to accept the lowest or any tender.
(a) Closing down and recommencement of works at all stages must be intimated by the contractor to Engineer-in-charge or Vice-versa in
writing with reasons if any failing which their claims for extension of time will not be entertained.
4. The work will have to be carried out as per programmed fixed out by the Company and the contractor should employ proper and competent
supervisors who should thoroughly supervise the execution of work by being on present on the work site through out.
5. No tools will be supplied except jointing dies by the Company and the Contractor should make his own arrangement to get adequate quantities
of all other tools in order to complete the job within the prescribed period jointing dies will be supplied free of charge.
6. The contractor shall be responsible for breakage, loss, theft of materials during transit or erection issued to him from stores till the time, the
work is handed over to and taken over by the Company.
7. Starting of work and commenced period: the erection work should be commenced within 7 days from the date specified in the order issued by
the Executive Engineer and should be completed within the prescribed period for each work.
8. Minimum period of Guarantee if during 12 calendar months from the date of handling over charge after completion of work the erected lines
are found defective in any way, the same should be rectified by the Contractor.
9. All the general conditions of contract to the company will be applicable to this order. An agreement is to be sighed in the prescribed form.
10. R.A. Bills – Bills will be prepared once a month looking to the progress of the work and payment will be as under.
a) Running bills may be paid on the works carried out after measurements are recorded upto 80 % and on submission of material account by
the contractor.
b) Final bill for the contract will be paid after completion of work recording measurement and after submission of materials account by the
11. No material of the company’s should be left on the lines without supervision.
12. Contractor must get the requisition, three days before he requires the materials on site from the Engineer-in-charge.
13. The payment through R.A. Bill shall be made only to extent of 80% of the total value of the work done. The amount so with held will be
released on furnishing by the contractor the material account statement of the relative R.A. bIll.
14. The contrctor after completion of the work shall prepare & tender the final detailed materials account of the materials received by him from the
Company’s stores within one month from the date of completion of work,if,however the contrctor does not tender the material account a
Register A.D. Notice will be issued to him, if within ten days from the date of issue of such notice there is no replay from the contrctor, the
material account will be finalized and recoveries made as per the Company’s account which Shall have to be account which shall to be
accepted by the contractor. Disputes if any raised later shall not be entertained.
15. The contrctor is bound to complete the work within the specified period for each work, given by the Executive Engineer.
16. The Contrctor will remain in force for the period of 12 Month from ______________________________ to ___________________________.
17. Priority of work would be decided by the Executive Engineer and contractor shall carry out the work within the stipulated period for the order
issued by the Executive Engineer.
18. The contrctor must have adequate resources and gang of unskilled and skilled persons to under-take the work at different place.
19. The contrctor will be given separate order for each work on the basis of the rate contract order, the date of commencement and date of
completion of work will be stipulated in order which the contractor has to agree otherwise the penalty will be livable for the completion of work
as per Company’s standard condition.
20. The soil may be hard or normal the tender should fill in the rate after seeing the site.
21. The contractor shall be responsible for returning the residual materials after completion of the contract and if he fails to return the balance
material supplied to him by the
22. Company, the cost of the residual materials will be recovered from the contrctor at material account plus 15% It is certified by the contrctor
1. Should this tender be accepted I/We hereby agree to abide by and fulfill all the terms and provision of the ‘’ The Tender and contract
File No: DGVCLDPPL/OTH/e-file/4456/2026/7107/CFC TECHNICAL
Approved By: Executive Engineer,Technical,DGVCLDPPL
Letter No: DGVCLDPPL/0228/11/2026 Approved Date: 19-11-2026 10:27
for work’’ as applicable and in default there of to forfeit and pay to the Company sum of money as become due.
2. The full value of the ‘’Earnest Money Deposit’’ paid herewith shall be absolutely forfeited to the Company should I/We not deposit
the amount of specified security deposit-in-time.
3. The competent can delete any time in Schedule ‘’B’’ in the tender.
4. I have filled in rates after visiting the site of work personally.
Date: Signature of Contractor
Name of Work: - Tender for works of maintenance of transformers center on ARC basis Piplod sub division and All sub division under
Piplod Division.
Time Limit: -.One Year
Sr.No. Description QTY Unit RATE Lab.chrg Total
Labour charqe for providing of HT/LT bushing goti if required
1.1 Replacement of LT bushing Goti/Rubber washer No. 40
1.2 Replacement of HT bushing goti/Rubber washer No. 40
Providing of half stud on LT side up to 1OO KVA TR, if
Providing of AL. Patta on LT side up to 200KVA TR if
3 required No. 140 5
Providing of AL. Patta on LT side up to 500 KVA TR if
Check and Tight earth conneclion, if required provide lugs
5 & nut-bolt to the neutral terminal of TRF and to the body No. L.S. 50
terminnl of TRF and dist box earth
Replacement of damage LT cable with new one of right
capacity(cable to be provided by DGVCL)
Providing a new termination in form of R,Y,B and N
core including PVC Tape(Lug Make 3D/Hex)
Termination of 25/50/70 Sq mm cable
Termination of 300 Sq mm cable
Termination of 150 Sq mm cable
Termination of 185 Sq mm cable
Termination of 240 Sq. mm cable
8 Measurement of Voltage and Ampere during maximum load Per No. 150
period minimum 10 nos of T/C per day.
Check Oil leakage from drain off valve/gasket/tank leak
etc.and if leakage found at attend by providing adhesive
material, m-seal and give detail of leakage and Topping of oil
9 to maintain proper oil level (oil to be provided by DGVCL) No. 150
Checking and Replacement of LT Dist Box if required (Dist.
10 Box to be provided by DGVCL) No. 100
Fixing of new dist. Box with complete wiring including
clamps, nut bolts etc. (Suitable for kit kat fuse/HRC
fuse)LT distribution box must be of SMC material
(GTP/SPECS. to be submitted of OEM)and to be
10.1 supplied from register vender of GUVNL and their No. 3150 628
subsidary company.all the testing norms will
be applicable to this material
File No: DGVCLDPPL/OTH/e-file/4456/2026/7107/CFC TECHNICAL
Approved By: Executive Engineer,Technical,DGVCLDPPL
Letter No: DGVCLDPPL/0228/11/2026 Approved Date: 19-11-2026 10:27
Replacement of detoriarated/providing LT dist. Box
with new up to 100 KVA capacity & crediting it to
store.(Suitable for kit kat fuse/HRC fuse)LT
distribution box must be of SMC material
(GTP/SPECS. to be submitted of OEM)and to be
supplied from register vender of GUVNL and their
subsidary company.all the testing norms will
be applicable to this material
Replacement of detoriarated/providing LT dist. Box
with new above 100 KVA capacity & crediting it to
store.(Suitable for kit kat fuse/HRC fuse)LT
distribution box must be of SMC material
10.3 (GTP/SPECS. to be submitted of OEM)and to be No. 3150 2084
supplied from register vender of GUVNL and their
subsidary company.all the testing norms will
be applicable to this material
Checking and Replacement of Kit-Ket fuse if required.
(Kit-Ket fuse to be provided by DGVCL)
11.1 100 amp Kit-Ket fuse No. 20
11.2 200 amp Kit-Ket fuse No. 20
Checking and Replacement of HRC fuse base if required.
12 (HRC fuse base to be provided by contractor of std. make
with type test certificate required)
12.1 630 amp HRC fuse base 682 50
12.2 400 amp HRC fuse base 525 50
12.3 250 amp HRC fuse base 370 50
Checking and Replacement of HRC fuse bridge if
13 required. (HRC fuse bridge to be provided by contractor
with type test certificate required)
13.1 630 amp HRC fuse No. 690
13.2 400 amp HRC fuse No. 490
13.3 250 amp HRC fuse No. 352
Providing of proper size of fuse element on HT side (on D.O.
fuse with cleaning of horns)
Providing and replacement of sundry Items like nut,bolt,
washer etc. of appropriate size
General Condition
clean off all dirt etc. from the body of the transformer and
tighten all nut-bolt etc.
Clamping of LT cable as per instruction of in charge
Cleaning of surrounding area nearby transformer center,
treeming of tree branches, removing of crimpers etc
Submission of the all activity done at location wise in
prescribed proforma format with signature of in charge of
16 supervisor and contractor JOB 150
Providing of Breather if not available with transformer
(Breather to be Provided by DGVCL)
Providing of Insulated jumper at HT side from D.O. fuse
outside to TC .all 3 nos. (Jumper wire will be Provided by
Meggar value taken (1) HV TO BODY (2) LV TO BODY (3) HV
TC Maintenance digital data submitted as per instruction of
Engineer incharge
Supply, Installation, Testing and Commissioning of
Maintenance Free, Ready Capsule, Pipe-In-Cage
(Pic) Type, Earth Electrodes for HT Feeder Pole
Having 3000 mm Electrode Length as per the Tender No. 5450
Specifications And Drawing. (All Materials Will Be
Supplied By Agency)
File No: DGVCLDPPL/OTH/e-file/4456/2026/7107/CFC TECHNICAL
Approved By: Executive Engineer,Technical,DGVCLDPPL
Letter No: DGVCLDPPL/0228/11/2026 Approved Date: 19-11-2026 10:27
Supply, Installation, Testing and Commissioning of
Maintenance Free, Ready Capsule, Pipe-In-Cage
(Pic) Type, Earth Electrodes for HT Feeder Pole
Having 2000 mm Electrode Length as per the Tender No. 4150
Specifications And Drawing. (All Materials Will Be
Supplied By Agency)
Supply and Installation of 25 X 3 mm GI Strip having
hot dip- galvanized-zinc coating of 80-100 microns
without any joints or welding. Both the end of the GI
strip should be connected with GI nut bolts and
required fabrication work for giving separate earthing
(1) Neutral of the transformer
(2) MS structures of the transformer center
(Approximately 25 meter GI strip per transformer
- as per requirement and instruction of
Engineer in- charge) (All Materials will be supplied
Supply and Installation of uPVC standard make Pipe
of 1.25" diameter for covering GI strip with UV
protected Cable Ties of 550 X 7.6 mm size to bind
20 with pole face(Approximately 25 meter uPVC pipe for MTR 85
GI strip covering per transformer centre -as per
requirement and instruction of Engineer in-charge.
LT Side Brass half stud with 2 no brass nut & washer
22.1 of size 12 mm NO. 158 18
LT Side Brass half stud with 2 no brass nut & washer
22.2 of size 20 mm NO 300 18
LT Side Brass Nuts and washer
12 mm Brass LT side nuts
20 mm Brass LT side nuts
30 mm Brass LT side nuts
12 mm Brass LT side washer
20 mm Brass LT side washer
30 mm Brass LT side washer
Breather plastic transparent body cast metal cap and
bottom, 1/2'' thread pipe,250 grams.( Dry gel weight
Breather plastic transparent body cast metal cap and
bottom, 1/2'' thread pipe,500 grams.( Dry gel weight
Total 2400000/-
Remarks: before commencement of work you shoud take approval of Aluminum Lug and HRC Fuse and Base (Type test required) ,SMC
fuse box (Type test required) and chemical earthing (Type test required)
File No: DGVCLDPPL/OTH/e-file/4456/2026/7107/CFC TECHNICAL
Approved By: Executive Engineer,Technical,DGVCLDPPL
Letter No: DGVCLDPPL/0228/11/2026 Approved Date: 19-11-2026 10:27
Executive Engineer (O&M)
DGVCL, Piplod Division
NOTES TO THE PRICE BID
Above rates shall be exclusive of all taxes/duties/levies etc.
Bidders shall have to furnish relevant documents for payment of work contractor tax / GST as per applicable along with each R.A. Bill.
The work shall be executed by successful bidder within the over all tender /work order value.
Individual quantities may vary with actual execution of work. The same shall be accepted within the overall value.
Cast Iron/GI plate, 1-Ph service wire, egg areal insulator, will be issued by the DGVCL. The same shall have to be drawn from respective RSO/Division
Office Store and all other material required to complete the work shall be arranged by the bidder.
The bidder shall have to keep the tender valid for 180 days from the returnable date of the contractor.
The work shall not be sub let to any other contractor.
SPECIAL INSTRUCTION TO THE TENDERER
1 Tender fee is non refundable.
2 The tenderers shall specifically note that the Tenders are invited on percentage basis only.
4 The Tenderers shall specifically note that the quantities mentioned in the Tender are likely to vary as per the actual requirement / work involved.
As such, the successful Tenderer shall have to execute the work at the same rates of the order for the changed / increased quantities, if any,
without any extra compensation whatsoever.
5 The Tenderers will ensure submission of the Tenders duly filled in before the due date and time on tender.nprocure.com.
6 IF TENDERER HAVE PAID TENDER FEE BEFORE OPENING OF THE TENDER. THE COPY OF tender fee and EMD online payment receipt
attached in preliminary stage with all relevant document of tender.
7 Tendered is not allowed to transfer their offer to other firm who have not purchased the tender document nor to the firms who have purchased the
tender document.
8. 25% quantity distribution to New bidder.
NOTE: - if you are the lowest than , You had to pay SD, Execute the agreement, Indemnity Bond, P.F., License Copy, Original solvency
Certificate, PAN Card No., GST Registration No , PF Registration ,Bank Account No, Bank Name & Address, Contact No of the Branch, IFSC No, Sub
order may be issue after complete the above official tender formalities.]
(To be furnished with Technical Bid)
SCHEDULE OF GENERAL PARTICULARS.
1.00 Name of Bidders. :
2.00 Address of Bidders. :
3.00 Telegraphic/Telex Address of the Bidders. :
4.00 Bidder’s proposal no. and Date: - :
5.00 Bid validity period (not less than four months). :
6.00 All schedules filled in - yes/no. :
7.00 All deviations brought out in the schedule of deviations. :
8.00 Is the Bidder agreeable to under take this contract if the :
Deviations stipulated by him are not acceptable to the purchaser.
9.00 Whether earnest money furnished as specified and details. :
10.00 Current registration no. with DGTD if any. :
11.00 Place of manufacture (equipment-wise). :
12.00 Service facilities. :
13.00 Name of Bidder’s officer to whom reference may be made :
For expeditions co-ordination.
14.00 Is Bidder agreeable to pay in Cash or in the form of an :
Acceptable bank Guarantee for security Deposit &
Performance Guarantee.
15.00 Price Quoted are firm as required :
(Firm prices are only acceptable).
16.00 Warranty period from take over of plant/ :
17.00 Whether terms of payment is stipulated in bid document :
18.00 Guaranteed completion for
a) Design & Engineering. :
b) Supply of all equipment parts :
c) Erection work
d) Total completion period :
19.00 Are the completion periods as above guaranteed under :
File No: DGVCLDPPL/OTH/e-file/4456/2026/7107/CFC TECHNICAL
Approved By: Executive Engineer,Technical,DGVCLDPPL
Letter No: DGVCLDPPL/0228/11/2026 Approved Date: 19-11-2026 10:27
20.00 Are the equipment guaranteed as per various :
Guarantee clauses of bid documents?
Name of the firm………………………………………..
Signature………………………………………………..
Designation…………………………………………….
DAKSHIN GUJARAT VIJ COMPANAY LTD.
1. The Tenderer should clearly give certificate along with the Technical Bid:
“This is to confirm and certify that the offer submitted by me is strictly in accordance with DGVCL Tender specifications, Guaranteed Technical P
articulars and drawing as mentioned in the Tender Specifications. There is no commercial or Technical deviation (except the deviations shown in
Annexure of Technical Deviations) in the offer from DGVCL Tender Specification. I undertake to
abide by DGVCL Technical specification / Guaranteed Technical Particulars / Drawing, I undertake to supply materials strictly as per DGVCL Te
chnical specification / Guaranteed Technical Particulars / Drawing, even if any
technical deviations are mentioned by me. I also undertake to abide by all commercial conditions of DGVCL, including delivery schedule.”
(Signature of the Tenderer)
2. Any offer without above certificate will not be considered and the tender will be out rightly ignored in the absence of above certificate.
3. After opening of the Tender, if it is found that the offer given by the Tenderer is not according to DGVCL specifications, Guaranteed Technical Spe
cifications, Drawing and commercial terms a n d conditions and false certificate is given
by the Tenderer, then DGVCL will not deal with the firm for the
present Tender. It is, therefore requested that the Tenderer should take care in giving their offer a n d submission
of documents, including Type Test certificate.
4. The conditional tenders will not be accepted.
SCHEDULE FOR DEVIATIONS FROM TECHNICAL SPECIFICATIONS
(To be furnished with Technical Bid)
All deviations from the specification shall be filled in by the Bidder in the schedule.
sl. Reference Deviations Justifications
It is hereby certified that the above mentioned are the only deviations from technical specification of the inquiry.
Seal of Company. Name of the Firm:
File No: DGVCLDPPL/OTH/e-file/4456/2026/7107/CFC TECHNICAL
Approved By: Executive Engineer,Technical,DGVCLDPPL
Letter No: DGVCLDPPL/0228/11/2026 Approved Date: 19-11-2026 10:27
SCHEDULE FOR DEVIATIONS FROM GENERAL TERMS & CONDITIONS OF THE CONTRACT
(To be furnished with Technical Bid)
All deviations from the General Terms & conditions shall be filled in by the Bidder in this schedule.
Section Specification No. Clause No. Deviations
It is hereby certified that the above mentioned are the only deviations from General Terms & conditions of the contract.
Seal of Company. Name of the Firm:
Bidder’s experience
The bidder should furnish here a list of similar jobs executed by him to whom a reference may be made by the purchaser in case of the
purchaser considers such a reference necessary.
Sr. Name & Description Value of work Period of Client with Person to whom
No of work Construction and detailed reference to be made.
File No: DGVCLDPPL/OTH/e-file/4456/2026/7107/CFC TECHNICAL
Approved By: Executive Engineer,Technical,DGVCLDPPL
Letter No: DGVCLDPPL/0228/11/2026 Approved Date: 19-11-2026 10:27
Seal of Company. Name of the Firm
E OTHER CONDITION OF SUPPLY:
The Company’s General Conditions of contract will apply to all contracts and supplier will be deemed to be fully aware of the Company’s general
conditions of contract for the supply of plant equipment and materials except the conditions modified in this commercial terms and conditions and any
ignorance of these Conditions, will not exempt supplier from their liability to abide by the same. Copies are available from the Division Office.
2. Although the materials have to be supplied as per ISS and or as per the tender specifications, the Company will take random samples from the
materials supplied and subject them to tests according to ISS in approved laboratories. The materials should stand these tests and if the materials do not
stand these tests, they will be summarily rejected and the supplier should make immediate arrangement to replace them with standard materials and after
getting them duly inspected and approved.
3. If in any company, the interest of any employee of the DGVCL or his relative as defined in Section VI of the Company’s Act. 1956, is 10% or
more, DGVCL will not deal with such company at all. Tenderer therefore, must specifically disclose this fact in his technical Bid. Non-disclosure of such
facts would disqualify the Tenderer for further dealing with DGVCL.
4. JURISDICTION:
All questions, disputes or differences arising under out of or in connection with the Tender / Contract if concluded shall be subject to the exclusive
jurisdiction of the
Court under whose jurisdiction the place from which the tender / Acceptance of tender is issued, is situated i.e. DGVCL, CORPORATE OFFICE; SURAT.
Tenderers are submitting their offers with the conditions of advance payment along with the order; such conditions are not acceptable by the Company.
5. The Tenderer if being an agent, who submits its offer to Company, will have to give information and declare the name of the principle from which he
will procure the materials and supply to Company along with company’s written confirmation about quality and backup performance guarantee. Only on
getting complete information from Agent, such offer if found suitable shall be taken in consideration.
6. Company reserves the right to cancel any or all the offers / bids or to accept any offer without assigning any reasons. Also in case Company finds
that there is an attempt of cartel in the prices, Company reserves the right to consider or reject any or all the parties offers without assigning any reasons
7. Company reserves the right to increase or decrease the quantity against each item/s while placing the order.
8. All the suppliers / manufacturers should possess high quality ISO 9001 / ISO 9002 Certificate within 2 years. Other things being equal the
company possessing the ISO 9001 / ISO 9002 license will be given preference if other requirements match.
9. The tenderers are required to furnish the technical information and the guaranteed technical particulars (GTP) along with company seal and
signature of the Tenderer on each and every page / papers of the tender documents.
10. All the costs of the stamp papers are to be borne by you as per the Govt. Of India’s latest guidelines.
11. Tenderer should invariably fill up all the details of all the Annexure including the prices in the Price Bid Annexure of this tender document. This is
File No: DGVCLDPPL/OTH/e-file/4456/2026/7107/CFC TECHNICAL
Approved By: Executive Engineer,Technical,DGVCLDPPL
Letter No: DGVCLDPPL/0228/11/2026 Approved Date: 19-11-2026 10:27
mandatory. Also all the Annexure should be duly signed by authorized signatories with their rubber stamp and along with Company’s Rubber (Round)
seal / stamp affixed on each paper.
12. If the Tenderer fails to pay the Security Deposit or defaults in execution of the order placed or if Company suffers any financial loss due to this,
then Company will be at liberty to adjust the amount from other orders of the same firm or by enchasing the Bank Guarantee.
13. LABOUR LAWS:-
Persons below the age of 18 years shall not be employed for the work. No female workers shall be employed in the night shift between 07.00 P.M. and
6.00 .A.M. next day.
Contractor shall maintain a valid labour license under the Contract Labor
(Regulation and abolition) Act for employing necessary manpower required by him. In the absence of such a licensee, the contract shall be liable to be
terminated without assigning any reason thereof. Contractor should also employ qualified and experiences persons as per requirement of Electricity Act
and rules for carrying out supply and erection work under this contract.
The Contractor shall at his own expenses comply with all labour laws and keep the DGVCL indemnified in respect thereof. Some of the major liabilities
under various labour and industrial laws which the Contractor shall comply which are as under:
Payment of contribution by way of Employer’s Contribution towards Provident Fund. Family Pension Scheme Deposit Linked Insurance Scheme,
Administrative charges etc. at the rates made applicable from time to time by the Government of Gujarat / Government of India or others Statuary /
Payment of Deposit in respect of each contract labour with the Office of Commissioner of Labour as per the Contract Lab our (Regulation and Abolition)
License fee as prescribed under the Contract Labour (Regulation and Abolition) Act and Rules framed there under depending upon the number of
Paid leave facility and wages as per the provision of the Factories Act., at the rate of one day for every 20 days of working. Identify Cards as prescribed
under the Factories Act., with photo affixed thereto for identification.
Payment of retrenchment compensation, Notice Pay and other liabilities as per Industrial Dispute Act., Any payment to the Contractor’s employee arising
out of any claim of dispute under the Industrial Disputes Act,1947 or any other Labor Laws.
Payment of compensation in case of accidental injury.
Provision of crèche if the female laborers employees are more then
Maternity leave as per the provisions of the Maternity Benefit Act.
The above are some of the major liabilities of the Contractor in addition to other liabilities prescribed under the various labor laws, in force from time to
time, from Statutory Authorities like State Government / Government of India, which the Contractor shall have to comply with.
The Contractor has to pay 1% Labour welfare Cess of order value to the concern Government Department. The rates shall be inclusive of the same.” The
proof of 1% Workers Welfare Cess payment made by the contractor to the appropriate department shall be submitted to DGVCL along with bill, falling
which appropriate amount shall be deducted from the bill and deposited to the respective government department by DGVCL.
14. PROVIDENT FUND AND FAMILIY PENSION SCHEME :
The Contractor shall submit along with his bills (Month wise) a Statement regarding deduction against employees Provident Fund and Family Pension
Scheme in respect of each concerned employees. The contractor’s contribution and the workers’ contribution towards Provident Fund and Family
Pension Scheme shall be done at the rate made applicable by the Government from time to time and deposited by the contractor with Regional Provident
Fund Commissioner Surat.
15. DEPOSIT LINKED INSURANCE SCHEME:-
The contractor shall have to deposit 1.2% of the wages in respect of employees who are members of the Provident Fund as the contribution to the Deposit
Linked Insurance Scheme with Regional Provident Fund Commissioner, Surat.
16. ADMINISTRATIVE CHARGES:-
Administrative charges for maintaining Provident Fund Account shall be deposited by the Contactor with Regional Provident Fund Commissioner, SURAT
at the rates applicable.
17. PAID LEAVE FACILITY:-
Paid Leave Facility at the rate of one day for every twenty days worked by the Contract Labour shall be provided by the Contractor to his workers. He shall
maintain Leave Records, Leave cards for individual labourer which shall be duly verified approved and certified by the authorized Officer of the DGVCL.
18. WORKMEN’S COMPENSATION ACT AND EMPLOYER’S LIABILITY INSURANCE:
The Contractor shall cover all his employees under workmen’s compensation act and under its liability insurance. The DGVCL shall not be responsible for
any payments of compensation to the workers / supervisor of the contractor for fatal or non fatal accidents during the tendency of the contract.
The contractor shall employee adequate number of qualified and experienced staff at site for daily supervision and for maintenance of various registers
and records rejected under the law and contract. No payment for supervision shall be admissible. The list of names of such persons with their qualification
and experience should be furnished with the tender.
19. CONTRACTOR TO INDEMIFY THE DGVCL:-
The Contractor shall indemnify the DGVCL and every officer and employees of the DGVCL including, Engineer – In-charge and his staff against all
actions, proceedings, claims, demands, cost and expenses whatever, arising out of or in connection with the matter referred herein above and elsewhere
and against all actions, proceedings, claims demands, cost and expenses which may be made against the DGVCL or Government for or in respect of
performance of the obligation under the contract documents. The DGVCL shall not be liable for or in respect of or in consequence of any accident or
injury to any workman or other person in the employment of the contractor or his sub-contractor and the contractor shall indemnify and keep indemnified
File No: DGVCLDPPL/OTH/e-file/4456/2026/7107/CFC TECHNICAL
Approved By: Executive Engineer,Technical,DGVCLDPPL
Letter No: DGVCLDPPL/0228/11/2026 Approved Date: 19-11-2026 10:27
the DGVCL against all claims, demands, proceedings, cost, charges and expenses whatever in respect thereof or in relation thereto.
20. WORKMEN’S COMENSATION AND EMPLOYEES LIABILITY INSURANCE
Insurance shall be effected for all the Contractor’s employees engaged in the performance of this contract. If any of the work of subject matter, the
Contractor shall require the Sub-Contractor to provide workmen’s employers liability insurance for the latter’s employees and ensure that such employees
are covered under the Contractor’s Insurance.
21. WAGES TO BE PAID & TIME OF PAYMENT ETC. BY THE CONTRACTOR:-
The Contractor shall pay minimum wages per day to his Labours / Workers as per rates fixed under the minimum wages Act. The wages of every Contract
Labour employed by him under this contract shall also be paid by him before the expiry of 7th day from the last day of the month in respect of which the
wages are payable ( i.e. wages of a month have to be paid by him in the first week of the next month).
Any default will result in cancellation of contract work with or else the Contractor shall be punishable to the extent of Rs. 100/- for each day of default.
The Contractor shall give his Addresses, Telephone Number and etc. to the DGVCL, so that, in case of labour trouble etc. the Contractor can be
contacted. The Contractor shall arrange to have his office within working area and the contractor keep himself present throughout the working hours.
The contractor who are having separate P.F. Code No. from RPFC, it should be ensured that all the contract labourers are covered under the Provident
Fund scheme, and employees’ pension scheme and their contributions are remitted regularly to the concerned Xerox copies of the challans in this regard
be collected from the concerned contractor and kept in the file of the concern contractor.
22. INCOME TAX:-
Income-tax at source at the prevailing rate will be deducted from your bill in accordance with the provision of Income-Tax Law sand to that effect a
certificate will be issued to the contractor.
As the material is to be procured by the successful bidder, the contractor shall make its own arrangement to avoid breakage, losses and wastages of
material etc. And no wastage on this account shall be considered payable by the DGVCL.
DGVCL reserve the right to check all the activities carried out by the successful bidder at each stage or during execution to see that the work is executed
as per the various drawings, standards, norms, rules and the regulations of the DGVCL.
24. PRESENTATION OF BILLS:-
The bills for the work executed including cost of material consumed is to be prepared in Quadruplicate and submitted 03 copies to the above mention
Sub- Division in Charge of the work who will in turn process the same and for necessary payment. These bills shall be serially numbered.
The contractor may note that no payment shall be released for the additional quality supplied which is not required for completion of line.
The Contractor has to submit the final bill along with the material consumption statement along with other required data’s of the work carried within
months from the date of completion of work.
For non-submission of part submission of above information, no bills shall be processed.
25. WAY LEAVE /ACCESS TO LOCATION / RIGHT OF WAY:-
DGVCL will assist to get the permission from various government agencies for carrying out the underground cable laying work i.e. Municipal Corporation/
Nagarpalika /B&C/ PWD/ Forest etc. If require DGVCL shall issue letter of permission on its letter pad. The successful bidder shall have to cut tree
branches/tree at his cost. In case of delay due to procedure in obtaining permission from authorities then respective time delay will not be considered for
time period of the sub order.
It will be the contractor’s sole responsibility to take the materials up to the location. Any path way, temporary road, temporary bridge required will have to
be provided by the contractor at his cost. If for any reasons, the above is not feasible, the contractor at his own cost shall have to arrange transportation by
The contractor will be deemed to be very well familiar with the route of the Distribution line before giving the offer. Not withstanding the difficulties of
terrain location approaches way leave and other obstructions the price quoted for all the items of erection I the Schedule of Section shall not undergo or
any change at any stage or granted by DGVCL for any special rates / consideration.
26. The enclosed List of Annexure and Documents should be invariably submitted along with the tender:
1) Technical Bid should be submitted separately with all Annexure and all relevant papers as asked in tender. On envelope mention “TECHNICAL
BID ONLY”. Mentioning the TENDER NO.
2) Schedule–“B” Price Bid to be submitted in the Separate Price Bid cover super scribed “PRICE BID COVER ONLY” mentioning the TENDER NO.
3) Technical Specifications with Guaranteed Technical Particulars.
All the above documents should be duly filled in, signed & stamped with company’s seal should be submitted along with the Technical Bids and
Schedule–“B” to be kept in the Price bid cover.
27. Please note that any additional conditions / deviations, if any, found in the Commercial terms & conditions then the Price Bids of such tenderers
will not be opened and no further correspondences in the matter will be allowed.
28. All the tenderers must ensure that all the relevant documents / papers submitted with the tender should be serially numbered, properly bounded /
tied together and properly documented. This must be adhered to.
29. All the above points should be complied by the Tenderers. If not, tenders are likely to be ignored without making any further reference.
File No: DGVCLDPPL/OTH/e-file/4456/2026/7107/CFC TECHNICAL
Approved By: Executive Engineer,Technical,DGVCLDPPL
Letter No: DGVCLDPPL/0228/11/2026 Approved Date: 19-11-2026 10:27
Signature of Contractor EXECUTIVE ENGINEER (O&M)
DGVCL, Piplod Division
COMMERCIAL TERMS & CONDITION FOR Tender for ARC works of maintenance of distribution transformer center at ALL, Sub division and if required
at other Sub division Under jurisdiction of Piplod Division.
1. TENDER SPECIFICATIONS:
All technical specification should be ISS/ISI/BIS. Specification framed out by the Company is separately brought out in the tender documents. No
deviation in specification shall be allowed and Company’s decision shall be final. The Company also desires that all the suppliers should possess high
quality ISO 9001 / ISO 9002 certificate within 2 years from 1/1/2001 and other things being equal, suppliers who possess ISO 9001 / ISO 9002 certificate
will be given preference in quantity distribution. The technical scrutiny committee of the Company shall evaluate the techno-commercial view of the
tender. Tender should be in two bids.
a) Techno – Commercial Bid and b) Price Bid.
LATE / DELYAED TENDER SHALL NOT BE CONSIDERED.
Incomplete bids and amendments and additions to bids after opening of the bids will be ignored out rightly.
The price bid of those who are techno-commercially qualified shall be opened. After technical bid is opened, for modification, if any, all shall be given
2. The Tenderer must give in his offer, the full name and address with phone, Fax & mobile numbers of the Representative who has been authorized
by the Tenderer to do work with the Corporation on their behalf.
3. The tenderers should invariably write the name and address of the Company, both on sealed covers of EMD, Technical & Price Bids. Otherwise
the tender covers without the name and address will not be opened which may please be noted.
THE TENDER SHOULD BE SENT BY R.P.A.D. ONLY AND ADDRESSED TO
The EXECUTIVE ENGINEER (O&M), DGVCL, Piplod Division Office.
(NO COURIER SERVICE WILL BE ACCEPTED). HAND DELIVERY OF TENDERS WILL NOT BE ACCEPTED.
4 DELAYED AND LATE TENDERS:
TENDER SHALL BE ACCEPTED online.
5. Tender fee (Non-refundable) as notified in the tender notice should invariably be paid by the tenderers in CASH (at DGVCL, Corporate Office;
SURAT) and enclose the zerox Money receipt in the EMD cover.
6. EARNEST MONEY DEPOSIT:
E.M.D. at the rate of 1% of the value of the Tender is payable. The EMD is payable by Online of The Dakshin Gujarat Vij Company Ltd. It can also
be furnished by way of an irrecoverable Bank Guarantee from any nationalized Bank in a standard format prescribed by DGVCL.
7. SECURITY DEPOSIT:
Security Deposit should be paid within one week after receipt of the LOI. The successful tenderers will be required to pay an amount equivalent to 5 % of
the value of the order as a Security Deposit for satisfactory execution of the contract. Such Security Deposit will be payable in Cash / D.D./Bank/Online
guarantee of any nationalized or Schedule Bank. If the full Security Deposit amount is not paid within one week after the receipt of the LOI, then the
Tender will be out rightly cancelled at the risk & cost of the Tenderer (at the discretion of the Company) and without entering into any correspondences
and this will be binding to the Tenderer.
Prices quoted should be FIRM and Exclusive of all taxes.
12. VALIDITY OF THE OFFER:
The offer will have to be kept valid for a period of 180 days from the date of opening of technical bids. In case of finalization of the tender is likely to be
File No: DGVCLDPPL/OTH/e-file/4456/2026/7107/CFC TECHNICAL
Approved By: Executive Engineer,Technical,DGVCLDPPL
Letter No: DGVCLDPPL/0228/11/2026 Approved Date: 19-11-2026 10:27
delayed, the tenderer’s will be asked to extend the same without change in the prices or any terms and conditions of the offer. If any change is made,
original or during the extended validity period, the offer will be liable for outright rejection without entering into further correspondence in this regard and
no reference will also be made.
13. PRICE EVALUATION:
No price preference shall be given on any account. All tenders will be evaluated on firm price basis. Company may go for the price L-2 depending upon
the exigency. If Company feels that there is lack of serious competition or any other reasons, Company may negotiates with the L-1 party. Company’s
decision shall be final and binding to all the parties.
11. QUANTITIES:-
The quantities mentioned in the schedule attached herewith are tentative and to be procurred / executed by the successful contractor at the same rates
accepted by the DGVCL in various A/T and all the terms and conditions of the order. However payment shall be made only for the actual quantities
utilized / executed to complete the work.
12. PACKING AND FORWARDING CHARGES :
The prices shall be inclusive of packing & forwarding charges. The stores should be strongly and adequately packed to ensure safe arrival at destination.
13. PAYMENT TERMS:
Payment shall be made by the concerned Division Office on completion of the job and production of work completion certificate of the Division / Sub –
Division Office in charge, after following the procedures of D.G.V.C.L. R. A. Bill will be passed as per Company’s Rules and Regulation.
14. REPEAT/ADDITIONAL ORDERS:
The Company reserves the right to place repeat orders / additional orders on the successful tenderer up to 50% of the original quantity of the A/T at the
same prices terms and conditions stipulated in the original order mutually agreed upon.
15. COMPLETION PERIOD:-
The Tenderer should agree activity wise time bound programme for completion of supply and erection work in all respect as per terms and
conditions of tender specifications.
The Tenderer shall confirm that on placement of order, the work will be commenced, executed and competed as per schedule given by DGVCL
Corporate Office/ Circle Office only.
16. POST TENDER CORRESPONDENCE / ENQUIRIES:
Any correspondence or enquiry subsequent to opening of Technical and Commercial bids is not desirable, if the same is indulged into, it will be
considered for disqualifying the tender. The Tenderer will be required to abstain from pursuing / canvassing the matter, directly or indirectly with any
Officers of the Company; otherwise the same would also amount to disqualification of the tender.
17. Tenderer must submit offers / bids along with requisite descriptive literature etc. in Duplicate (separate sets) clearly indicating as Original and
Duplicate duly signed and stamped by them. Tenderer will be at full liberty to provide information and data’s about his products.
18. The purchaser (i.e. Company) shall have the right to make any changes, additions / deletions or modifications in any terms / conditions of the
tender and / or specifications as may be deemed necessary by the Corporation at its sole discretion at any time before the due date of opening of the
19. Tenderer should furnish a list of orders for similar works executed by them indicating the name of the party and their order reference to which they
have worked to be furnished. Failure to do this will result on suppliers tender being rejected without any reference. In case of bought out items, they
should furnish the back up guarantee from their principals.
20. Company does not accept the printed conditions of any Tenderer. It will be ignored without any reference; hence tenderers should withdraw such
printed conditions if they have any.
21. The materials should be offered strictly confirming to ISS / BIS / Tender specifications given in the tender. If the tenderer desires to quote with any
technical deviations, they should specifically quote the deviation & the ISS or BIS Nos. in the body of the tender itself under the respective Annexure of
this tender document. If technical deviations furnished by the Tenderer are not agreeable to the Company, the offers may be ignored. However it will be
solely at Company’s discretion to consider the technical deviations OR not for considering the Tender. No correspondence with the Tenderer after
opening of the bid will be entertained in this matter.
22. Revision of prices or any commercial terms affecting the price after opening of technical bids shall not be considered and will be ignored.
23. Please give suitable declarations as under: I / We declare that we are Authorized Distributor OR Dealer for all the tendered items.
24. Tenderer should specifically mention in the offers and should indicate in Block letters the name of the Partners / Proprietor / Directors who is / are
the signing authority.
If the goods, stores and equipments found defective due to bad design or workmanship, the same should be replaced by you free of charge if
reported within 24 months of their installation at site. You will be responsible for the proper performance of the equipments / materials for the respective
guarantee period.
Signature of Contractor
SAFETY RULES APPLICABLE TO WORK CONTRACTS
1 The contractor shall invariably obtain LINE CLEAR PERMIT through concern in-charge Engineer through supervising department’s engineer and
shall observe all rules and Regulations. The contractor shall provide to his labourer all the equipments / accessories necessary for safe execution of
File No: DGVCLDPPL/OTH/e-file/4456/2026/7107/CFC TECHNICAL
Approved By: Executive Engineer,Technical,DGVCLDPPL
Letter No: DGVCLDPPL/0228/11/2026 Approved Date: 19-11-2026 10:27
2 Only trained and experienced persons should be employed for working. Particularly in places where the working environment is hazardous, it is a
3 The contractor shall employ such Supervisor(s) who have good understanding and experience of the job entrusted to him. The supervisor must
be familiar with the associated risks and he will remain present to guide the workers regarding safe execution of work.
4 Contractor shall use 24 volts lamps for lighting purpose, which are having grill around it (insulated handle in case of hand lamp) wherever
5 Safe working environment to workers will be provided and maintained by contractor e.g.
In confined spaces provision of fresh air during welding / cutting operations,
In coal Handling Area, Contractor must provide respirator and Breathing equipments to their workers. Wherever require, Helmet, Safety shoes, Goggles
etc must also be provided.
6 Tools and Tackles used by the contractor should be in safe working conditions. The test certificate issued by competent person should be kept on
hand shall be produced wherever required by DGVCL authorities or any other authorities such as Factory Inspector, Electrical Inspector etc.
7 No person shall be ordered to carry or lift independently heavy weight more than the limit as shown below.
MALE: 55 Kg. (maximum)
FEMALE: 30 Kg. (Maximum)
8 All Electrical equipments on which repair work is to be carried out must be fully isolated and earthen prior to execution of job.
Use insulated gloves of adequate safe voltage rating.
Use safety belt and lifeline in case where work is at elevated place.
Use of appropriate helmet is must while working.
Use double insulated tools of appropriate voltage rating. All above equipments must be checked periodically for its ratings. Use only proper connectors
and socket. Loose wires and connections are strictly prohibited. All portable electrical tools should be suitably earthen.
All amendments coming in force in Factories Act, State Factory Rules must be strictly followed from the date of enforcement.
Signature of Contractor EXECUTIVE ENGINEER (O&M)
DGVCL, Piplod Division.
SPECIAL TERMS AND CONDITIONS:
1. The work is to be executed in the area of DGVCL in all respect as per the instructions of Engineer-in-charge by arranging all required materials tools,
tackles equipment including labours, transportation etc. DGVCL will not pay anything extra on this account.
2. The DGVCL reserves the rights of retrenching and dismissing any person employed for the work if there is complaint against his misbehavior,
misconduct or disloyalty towards job.
3. Terms and conditions regarding industrial laws and other related matters shall be complied by the contractor in all respect.
4. No part of the contract nor any share of interest there in shall in any manner of degree be transferred/assigned or subject by the contractor directly or
indirectly to any person/firm or Corporation whatsoever.
5. The contractor shall ensure that all persons are provided with the safety tools, shoes, etc. as may be required from safety point of view and all his
persons shall follow the instructions issued by the DGVCL from time to time related with the safety and security to carry out the work.
6. DGVCL shall not be liable for any damages or compensation for any injury or for any accident occurred to any person engaged by the contractor. The
contractor shall keep the DGVCL indemnified thereof.
7. The contractor shall be liable for making good all damages/losses arising out of workmanship, breakages, pilferage, etc. to the DGVCL.
8. Contract period:
1) The contract period will be 12 Month from the date of issue of the Order. However if required, the period of order may be extended further as per DOP
of competent authority.
2) If during the contract period, execution of work is not found satisfactory in any respect,
job will be got executed through other agency at the risk and cost of the contractor. DGVCL reserves the right to terminate your order without assigning
9. The rates agreed herein shall remain firm till the expiry of contract. The contractor shall not be entitled to any increase or revision (Statutory or
otherwise) or any other right or claim. What so over by way of representation, explanation statement or any undertaking or promise given or alleged to
have given by any employee of the company or due to contractor’s own ignorance on account of any difficulties or hardships faced by him. The rates as
such are all inclusive of all.
10. The rates should be quoted in percentage in enclosed schedule only, both in words and in figures, as specified therein. In case of any discrepancy
between the rates/amount quoted in words & figure, the rates/amount most favorable to the DGVCL shall be considered.
11. Conditional tender will not be accepted and likely to be rejected.
12. The DGVCL do not bind them selves to accept lowest or any tender.
13. The DGVCL reserves all rights to accept or reject any or all tenders without assigning any reason. The terms and conditions stated above are carefully
read by me/us and are acceptable to me/us.
14. The quantity given in Schedule ‘B’ is approximate. There will be increase or decrease in the quantities. Please note that within the estimated cost
quantities of item may very as per the requirement of the Board. In such event, payment will be made on the basis of actual quantities executed.
Successful bidder shall submit daily report for work executed by them giving details of Name of s/s, Name of feeder, type of kit used ,date of providing kit,
sub order no. etc. to concern sub-division & submit weekly report to Ex.Engr.(O&M) Piplod Division.
File No: DGVCLDPPL/OTH/e-file/4456/2026/7107/CFC TECHNICAL
Approved By: Executive Engineer,Technical,DGVCLDPPL
Letter No: DGVCLDPPL/0228/11/2026 Approved Date: 19-11-2026 10:27
Signature of Contractor
EXECUTIVE ENGINEER (O&M)
DGVCL, Piplod Division.
Signature Not Verified
Signed by:HEMANT
THAKORPRASAD PRAJAPATI File No: DGVCLDPPL/OTH/e-file/4456/2026/7107/CFC TECHNICAL
Executive Engineer
Date:2026.11.19 Approved By: Executive Engineer,Technical,DGVCLDPPL
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender for work of Maintenance of Transformers Center Piplod.pdf
TC maintenance new sor Shedual-B.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .