Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.0 LAdmitted-Finance | -17.85% | ₹12.0 L | L1 | Admitted-Finance |
| 2 | L2₹12.1 LAdmitted-Finance | -16.97% | ₹12.1 L | L2 | Admitted-Finance |
| 3 | L3₹12.2 LAdmitted-Finance | -16.91% | ₹12.2 L | L3 | Admitted-Finance |
| 4 | L4₹12.2 LAdmitted-Finance | -16.65% | ₹12.2 L | L4 | Admitted-Finance |
| 5 | L5₹12.3 LAdmitted-Finance | -16.01% | ₹12.3 L | L5 | Admitted-Finance |
Tender Value
₹14.6 L
EMD Value
₹29,260
Closing Date
28 Jun 2026, 6:00 pmClosed
EE PWD DIV. NAINWA
EE PWD DIV. NAINWA
A/R to Korma Km. 2/500 (SR to CD work 2026-27)
2026_CEPWD_568892_4
EE PWD DIV. NAINWA NITNO-07/2026-27
Open Tender
Civil Works
60 days
BUNDI
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
500 EE PWD DIV. NAINWA
₹29,260
Yes
29 Jun 2026
18 Jun 2026
29 Jun 2026
18 Jun 2026
28 Jun 2026
18 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation for structures as per drawing and MoRTH specifications Clause 304.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary soil Upto 3 m depth | - | P.Cum | - | - |
| 2 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104 P.C.C grade M 10 Nominal mix 1:3:6 | - | P.Cum | - | - |
| 3 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104 R.C.C grade M 20 | - | P.Cum | - | - |
| 4 | Supplying, fitting, and placing HYSD bar reinforcement (Primary Steel) in Foundation, Substructure and superstructure at any level complete as per drawing and MoRTH specifications Clauses 1009,1600 and 2302 | 1 | P.Tonner | - | - |
| 5 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 | - | P.Cum | - | - |
| 6 | Carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete. Earth, Sand, Lime, Morrum manure or sludge For 1 Km. | - | P.Cum | - | - |
| 7 | Add GST (18%) on Total Costruction Cost | - | Total | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.05 MB
Tendernotice_2.pdf
PDF • 1.40 MB
Tendernotice_3.pdf
PDF • 11.56 MB
Tendernotice_4.pdf
PDF • 0.22 MB
BOQ_1012277.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid