Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹1.7 L+₹1,378.98 (0.82%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SURENDRAN.M L1 | Anujith. M L2 |
|---|---|---|---|---|---|
| 1.00Anganawadi no 123 | |||||
| 1.00 | OD135572/2025-2026:DISMANTLING DR-Dismantling , clearing away and carefully stacking material useful for reuse for any thickness of wall in DR Masonry include disposal of debris within a distance of 150m. | 7.65 | cum | 695.02 ₹5,315.51 Lowest | 695.8 ₹5,321.48 |
| 1.00 | OD135573/2025-2026:Demolishing Laterite/brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 6.02 | cum | 1,956.3 ₹11,771.06 Lowest | 1,956.3 ₹11,771.06 Lowest |
| 1.00 | OD135574/2025-2026:DR with Departmental. Stone -
DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental
rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 4.59 | cum | 1,570.07 ₹7,205.05 Lowest | 1,576.07 ₹7,232.59 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 6.9 | cum | 330.41 ₹2,279.5 Lowest | 330.41 ₹2,279.5 Lowest |
| 1.00 | OD135582/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good
quality blasted rubble including packing to compactness to lines and levels cost and conveyance
of all materials labour charges etc. complete as per direction of Departmental officers at site | 12.21 | cum | 3,660.07 ₹44,689.45 Lowest | 3,668.07 ₹44,787.13 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.09 | cum | 9,600.13 ₹10,512.14 Lowest | 9,634.13 ₹10,549.37 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 60.23 | kilogram | 103.26 ₹6,218.83 Lowest | 103.26 ₹6,218.83 Lowest |
| 1.01 | 50.6.7.2:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc. | 5.15 | cum | 8,200.77 ₹42,225.76 Lowest | 8,299.77 ₹42,735.52 |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 70.08 | sqm | 330.63 ₹23,170.55 Lowest | 339.63 ₹23,801.27 |
Tender Value
₹1.7 L
EMD Value
₹4,232
Closing Date
27 Oct 2025, 6:00 pmClosed
Assistant Engineer
O/o The Assistant Engineer LSGD section Moonniyur GP
369 Maintenance works of compound wall to anganwadi 123 in Moonniyur GP
2025_LSGD_811718_14
AE/LSGD/Mnr/08/2025-26
Open Tender
Civil Works - Roads
Item Rate
300 days
Moonniyur
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
₹4,232
27 Jun 2026
20 Oct 2025
29 Oct 2025
20 Oct 2025
27 Oct 2025
20 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1357129.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1357129.xls
BOQ • 0.30 MB
compa.pdf
Tender Documents • 0.26 MB
compsbd.pdf
Tender Documents • 0.96 MB
comfot.pdf
Other Document • 0.25 MB
compfee.pdf
Other Document • 0.33 MB
compaffi.pdf
Other Document • 0.24 MB
Epayment.pdf
Additional Documents • 0.23 MB
IPact.pdf
Additional Documents • 0.23 MB
compastract.pdf
Additional Documents • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .