Tender Value
₹7.1 L
EMD Value
₹17,700
Closing Date
26 Jun 2026, 11:00 amClosed
EXECUTIVE ENGINEER PMU THODUPUZHA KSEB
EXECUTIVE ENGINEER PMU THODUPUZHA KSEB
HT reconductoring and rerouting using coveredconductor at Angamvetty in Manakkad feeder under ES No1 Thodupuzha
2026_KSEB_855943_1
PMU/ TDPA/E tender/18/Re tender/2026-27/ dated 06.05.2026
Open Tender
Electrical Works
Percentage
90 days
THODUPUZHA
AS PER TENDER
5 documents required · 5 mandatory
₹1,770
₹17,700
2 Jul 2026
15 Jun 2026
27 Jun 2026
15 Jun 2026
26 Jun 2026
15 Jun 2026
15 Jun 2026 - 18 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). | 5 | No | 4,143.14 | ₹20,715.7 |
| 2 | Additionalrateforprovidingonediscset,PGclampetc.complete,onany type of HT pole for making cut point. | 114 | No | 158.91 | ₹18,115.74 |
| 3 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). | 7 | No | 906.41 | ₹6,344.87 |
| 4 | Fitting and erecting one HT Double Pole Structure using A type pole in position including fitting 2 No. channel cross arm, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). | 1 | No | 10,473.36 | ₹10,473.36 |
| 5 | FittingoneAdditional2.4m/3mChannelcrossarm(100x50x6mm),in existing 11kV DP including conveyance of materials. | 7 | No | 564.55 | ₹3,951.85 |
| 6 | Transferring LT single phase 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. | 50 | No | 879.23 | ₹43,961.5 |
| 7 | Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. | 8 | No | 1,778.32 | ₹14,226.56 |
| 8 | Dismantling(withoutdamage)oneLTPSC/RCCpoleafterdisconnecting stays, strut etc. attached thereon and stacking the same. | 43 | No | 1,923.64 | ₹82,716.52 |
| 9 | Dismantling(withoutdamage)LTstayincludingdiggingpitinallclasses of soil and backfilling. | 5 | No | 469.41 | ₹2,347.05 |
| 10 | Conveyance of one km 11kV line materials from section store/stackingplace to the work site (excluding poles). | 2 | km | 1,737.55 | ₹3,475.1 |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.26 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
SpecialCondition.pdf
Additional Documents • 0.73 MB
Generaltermsconditions.pdf
Other Document • 0.99 MB
GCC.pdf
Tender Documents • 1.04 MB
BOQ_1446682.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .