Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAccepted-AOC A 32 GORAI 1 VATVRUKSH CHS LTD RSC 22 BORIVALI W MUMBAI 400 091 | MUMBAI SUBURBAN | MAHARASHTRA | 400091 | ₹9.9 L | L1 | Accepted-AOC AOC |
| 2 | L2₹10.4 LRejected-Finance E 2 ISHWAR NAGAR CHS OPP DENA BANK NEAR POST OFFICE LBS ROAD BHANDUP WEST MUMBAI 400078 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400078 | ₹10.4 L | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | Usha Engineers L1 | GURUDATT ELECTRICALS L2 |
|---|---|---|---|---|---|
| 2.00 | Sub Estimate - M&R to WSS and EDS @ Mahad, Vile-Bhagad & Poladpur Industrial Area.....Filtration of transformer oil including minor repairs. - Accessories - Filtration of transformer oil conforming to IS 1886 : 2000 on site till satisfactory test results. | 2,620 | Litre | 30 ₹78,600 Lowest | 105 ₹2,75,100 |
| 3.00 | Supplying and topping up new insulating oil for transformer conforming to IS 335 :1993 of approved make with test certificate. | 840 | Litre | 160 ₹1,34,400 | 105 ₹88,200 Lowest |
| 4.00 | Supplying and Erecting breather with silica gel suitable for 160 KVA Transformer in and approved manner | 4 | Number | 6,500 ₹26,000 | 2,540 ₹10,160 Lowest |
| 5.00 | Supplying and Erecting Breather with silica gel suitable for 500 KVA Transformer in an approved manner | 2 | Number | 6,350 ₹12,700 | 3,500 ₹7,000 Lowest |
| 6.00 | Rewinding of 22/0.433 KV, 160 KVA capacity transformer including Re-insulation of HV/LV copper windings. Re-insulation of H.V/L.V. copper winding using double paper coating machine to coat the copper windings to 0.5 mm thickness. Preparation of HV and LV winding of transformer as per the existing design parameters and Labor charges for unloading of transformer, opening of top cover, removal of core and winding assembly and allied works. Low voltage testing of transformer, removal of top yoke laminations of transformer. Removal of all the windings. Cleaning of all healthy parts. Cleaning of core and inspection for hot spot damages and repairs if necessary. Re- assembly of windings on core, refitting of top yoke lamination, breezing/crimping & insulating the leads. Ovening, drying of core and winding assembly by applying proper heating to achieve desired meger values. Oil soaking of transformer core, clamping of oil soak core & coil assembly, varnishing of coil and core assembly, varnishing of copper windings and allied. Assembly of transformer for testing of all routine tests. Scrubbing of transformer tank and cleaning to remove oil surface on outer and inner tank Painting of transformer by applying one coat of red oxide paint to the rusted parts. Applying 2 coats of eddy grey color Asian paints make. Replacement of all gaskets of transformer. Transformer oil filtration of transformer oil using filter machine to achieve BDV values as per IS standards including loading, unloading & transporting etc. complete. (Including Credit charges for old copper scrap & scrap oil) | 1 | Number | 2,25,000 ₹2,25,000 | 1,20,000 ₹1,20,000 Lowest |
| 7.00 | Rewinding of 22/0.433 KV, 200 KVA capacity transformer including Re-insulation of HV/LV copper windings. Re-insulation of H.V/L.V. copper winding using double paper coating machine to coat the copper windings to 0.5 mm thickness. Preparation of HV and LV winding of transformer as per the existing design parameters and Labor charges for unloading of transformer, opening of top cover, removal of core and winding assembly and allied works. Low voltage testing of transformer, removal of top yoke laminations of transformer. Removal of all the windings. Cleaning of all healthy parts. Cleaning of core and inspection for hot spot damages and repairs if necessary. Re- assembly of windings on core, refitting of top yoke lamination, breezing/crimping & insulating the leads. Ovening, drying of core and winding assembly by applying proper heating to achieve desired meger values. Oil soaking of transformer core, clamping of oil soak core & coil assembly, varnishing of coil and core assembly, varnishing of copper windings and allied. Assembly of transformer for testing of all routine tests. Scrubbing of transformer tank and cleaning to remove oil surface on outer and inner tank Painting of transformer by applying one coat of red oxide paint to the rusted parts. Applying 2 coats of eddy grey color Asian paints make. Replacement of all gaskets of transformer. Transformer oil filtration of transformer oil using filter machine to achieve BDV values as per IS standards including loading, unloading & transporting etc. complete. (Including Credit charges for old copper scrap & scrap oil) | 1 | Number | 2,25,000 ₹2,25,000 | 1,25,000 ₹1,25,000 Lowest |
| 8.00 | Sub Estimate - M&R to WSS and EDS scheme @ Roha Industrial Area.....Filtration of transformer oil including minor repairs. - Accessories - Filtration of transformer oil conforming to IS 1886 : 2000 on site till satisfactory test results. | 2,750 | Litre | 30 ₹82,500 Lowest | 110 ₹3,02,500 |
| 9.00 | Supplying and topping up new insulating oil for transformer conforming to IS 335 :1993 of approved make with test certificate. | 840 | Litre | 190 ₹1,59,600 | 110 ₹92,400 Lowest |
| 10.00 | Supplying and erecting Breathers with silica gel for 315 KVA Transformer in an approved manner. | 6 | Number | 8,500 ₹51,000 | 2,500 ₹15,000 Lowest |
Tender Value
₹11.1 L
EMD Value
₹11,100
Closing Date
29 Apr 2026, 5:00 pmClosed
Executive Engineer E and M Mahad Div
Executive Engineer E and M Mahad Div
DG MAHAD INDUSTRIAL AREA. M and R to WSS and EDS Mahad, Poladpur and Roha Industrial Area. Filtration of transformer oil including minor repairs.
2026_MIDC_1295199_1
11,07,120.00
Open Tender
Support/Maintenance Service
Item Rate
Mahad Industrial Area...
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
₹11,100
16 Jun 2026
15 Apr 2026
4 May 2026
15 Apr 2026
29 Apr 2026
23 Apr 2026
15 Apr 2026 - 20 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Sub Estimate - M&R to WSS and EDS @ Mahad, Vile-Bhagad & Poladpur Industrial Area.....Filtration of transformer oil including minor repairs. - Accessories - Filtration of transformer oil conforming to IS 1886 : 2000 on site till satisfactory test results. | 2,620 | Litre | 67,001 | ₹17,55,42,620 |
| 3 | Supplying and topping up new insulating oil for transformer conforming to IS 335 :1993 of approved make with test certificate. | 840 | Litre | 67,001 | ₹5,62,80,840 |
| 4 | Supplying and Erecting breather with silica gel suitable for 160 KVA Transformer in and approved manner | 4 | Number | 67,001 | ₹2,68,004 |
| 5 | Supplying and Erecting Breather with silica gel suitable for 500 KVA Transformer in an approved manner | 2 | Number | 67,001 | ₹1,34,002 |
| 6 | Rewinding of 22/0.433 KV, 160 KVA capacity transformer including Re-insulation of HV/LV copper windings. Re-insulation of H.V/L.V. copper winding using double paper coating machine to coat the copper windings to 0.5 mm thickness. Preparation of HV and LV winding of transformer as per the existing design parameters and Labor charges for unloading of transformer, opening of top cover, removal of core and winding assembly and allied works. Low voltage testing of transformer, removal of top yoke laminations of transformer. Removal of all the windings. Cleaning of all healthy parts. Cleaning of core and inspection for hot spot damages and repairs if necessary. Re- assembly of windings on core, refitting of top yoke lamination, breezing/crimping & insulating the leads. Ovening, drying of core and winding assembly by applying proper heating to achieve desired meger values. Oil soaking of transformer core, clamping of oil soak core & coil assembly, varnishing of coil and core assembly, varnishing of copper windings and allied. Assembly of transformer for testing of all routine tests. Scrubbing of transformer tank and cleaning to remove oil surface on outer and inner tank Painting of transformer by applying one coat of red oxide paint to the rusted parts. Applying 2 coats of eddy grey color Asian paints make. Replacement of all gaskets of transformer. Transformer oil filtration of transformer oil using filter machine to achieve BDV values as per IS standards including loading, unloading & transporting etc. complete. (Including Credit charges for old copper scrap & scrap oil) | 1 | Number | 67,001 | ₹67,001 |
| 7 | Rewinding of 22/0.433 KV, 200 KVA capacity transformer including Re-insulation of HV/LV copper windings. Re-insulation of H.V/L.V. copper winding using double paper coating machine to coat the copper windings to 0.5 mm thickness. Preparation of HV and LV winding of transformer as per the existing design parameters and Labor charges for unloading of transformer, opening of top cover, removal of core and winding assembly and allied works. Low voltage testing of transformer, removal of top yoke laminations of transformer. Removal of all the windings. Cleaning of all healthy parts. Cleaning of core and inspection for hot spot damages and repairs if necessary. Re- assembly of windings on core, refitting of top yoke lamination, breezing/crimping & insulating the leads. Ovening, drying of core and winding assembly by applying proper heating to achieve desired meger values. Oil soaking of transformer core, clamping of oil soak core & coil assembly, varnishing of coil and core assembly, varnishing of copper windings and allied. Assembly of transformer for testing of all routine tests. Scrubbing of transformer tank and cleaning to remove oil surface on outer and inner tank Painting of transformer by applying one coat of red oxide paint to the rusted parts. Applying 2 coats of eddy grey color Asian paints make. Replacement of all gaskets of transformer. Transformer oil filtration of transformer oil using filter machine to achieve BDV values as per IS standards including loading, unloading & transporting etc. complete. (Including Credit charges for old copper scrap & scrap oil) | 1 | Number | 67,001 | ₹67,001 |
| 8 | Sub Estimate - M&R to WSS and EDS scheme @ Roha Industrial Area.....Filtration of transformer oil including minor repairs. - Accessories - Filtration of transformer oil conforming to IS 1886 : 2000 on site till satisfactory test results. | 2,750 | Litre | 67,001 | ₹18,42,52,750 |
| 9 | Supplying and topping up new insulating oil for transformer conforming to IS 335 :1993 of approved make with test certificate. | 840 | Litre | 67,001 | ₹5,62,80,840 |
| 10 | Supplying and erecting Breathers with silica gel for 315 KVA Transformer in an approved manner. | 6 | Number | 67,001 | ₹4,02,006 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.81 MB
TenderDocument.pdf
Tender Documents • 0.26 MB
ItemSpecification.pdf
Other Document • 0.02 MB
BOQ_2225432.xls
BOQ • 0.29 MB
NIT.pdf
PDF • 1.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].