Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.8 LAccepted-AOC A C 151 SONARPUR UTTAR RAJPUR SONARPUR MUNICIPALITY WEST BENGAL WB | HOOGHLY | WEST BENGAL | 712101 | ₹14.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹14.9 L+₹14,946.13 (1.01%)Rejected-AOC BOALIA PO GARIA 700084 | 24 PARAGANAS SOUTH | WEST BENGAL | 700084 | ₹14.9 L+₹14,946.13 (1.01%) | L2 | Rejected-AOC L2 |
| 3 | L3₹15.0 L+₹22,345.20 (1.51%)Rejected-Finance A C 151 SONARPUR UTTAR RAJPUR SONARPUR MUNICIPALITY WEST BENGAL WB | ₹15.0 L+₹22,345.20 (1.51%) | L3 | Rejected-Finance L3 |
Tender Value
₹14.8 L
EMD Value
₹29,596
Closing Date
9 Mar 2026, 11:00 amClosed
E.O,RAJPUR SONARPUR MUNICIPALITY
RAJPUR SONARPUR MUNICIPALITY
Construction of Concrete Road With Covered Drain and UC Bullah Pilling At Bangalpara,In Ward No-33 Under Rajpur Sonarpur Municipality. i)From HO Wohav to HO Sahid Molla ii)From HO Matom to Abdul Manan Molla via Sahid Molla iii HO Raju to HO Chott
2026_MAD_1010448_1
WBMAD/ULB/RSM/658/25-26/2nd Call
Open Tender
CIVIL WORKS
Percentage
60 days
RAJPUR SONARPUR MUNICIPALITY
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹29,596
19 May 2026
19 Feb 2026
11 Mar 2026
19 Feb 2026
9 Mar 2026
19 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
a) Depth of excavation not exceeding1500 mm.
[Page- 1, Item- 2.a] | - | M3 | 119.27 | - |
| 2 | Earth work in filling in foundation trenches or plinth with good earth. In layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on basis of measurement of finished quantity of work).
(a) With earth obtained from excavation of foundation.
[Page-1, Item-3.a ] | - | M3 | 77.54 | - |
| 3 | Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where
necessary.
(a) Depth up to 150 mm.
[Page-240, Item-3.16(Road Schedule)] | 310.5 | M2 | 14.4 | ₹4,471.2 |
| 4 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
[Page- 14, Item- 1 (3rd Corri. Pg.- 01, Dt. - 04.06.18)] | 505.8 | M2 | 361 | ₹1,82,593.8 |
| 5 | Cement concrete with graded jhama khoa (30 mm size) excluding shuttering
In ground floor and foundation.
(a) 1:3:6 proportion.
[Page- 23, Item- B.1.a ( Rate Analysis attached )] | 19.54 | M3 | 4,628.87 | ₹90,448.12 |
| 6 | Brick work with 1st class bricks in cement mortar (1:6)
(a) In foundation and plinth.
[Page- 15, Item- 8.a ( Rate Analysis attached )] | 33.05 | M3 | 5,367.81 | ₹1,77,406.12 |
| 7 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor.
[Page- 16, Item- 16 ( Rate Analysis attached )] | 186 | M2 | 728.47 | ₹1,35,495.42 |
| 8 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity).
[Page- 2, Item- 4.A] | 46.58 | M3 | 936.21 | ₹43,608.66 |
| 9 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]
(ii) With 1:4 cement mortar
(b) 15 mm thick plaster.
[Page- 189, Item- 1.ii.b ( Rate Analysis attached ) ] | 186 | M2 | 163.21 | ₹30,357.06 |
| 10 | Neat cement punning about 1.5mm thick in wall,dado,window sill,floor etc.
NOTE:Cement 0.152 cu.m per100 sq.m.
[Page- 192, Item- 15 ( Rate Analysis attached ) ] | 186 | M2 | 32.75 | ₹6,091.5 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_2481046.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .