Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.8 LAccepted-AOC A C 151 SONARPUR UTTAR RAJPUR SONARPUR MUNICIPALITY WEST BENGAL WB | HOOGHLY | WEST BENGAL | 712101 | ₹14.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹14.9 LRejected-AOC BOALIA PO GARIA 700084 | 24 PARAGANAS SOUTH | WEST BENGAL | 700084 | ₹14.9 L | L2 | Rejected-AOC L2 |
| 3 | L3₹15.0 LRejected-Finance A C 151 SONARPUR UTTAR RAJPUR SONARPUR MUNICIPALITY WEST BENGAL WB | ₹15.0 L | L3 | Rejected-Finance L3 |
Tender Value
₹14.8 L
EMD Value
₹29,596
Closing Date
9 Mar 2026, 11:00 amClosed
E.O,RAJPUR SONARPUR MUNICIPALITY
RAJPUR SONARPUR MUNICIPALITY
Construction of Concrete Road With Covered Drain and UC Bullah Pilling At Bangalpara,In Ward No-33 Under Rajpur Sonarpur Municipality. i)From HO Wohav to HO Sahid Molla ii)From HO Matom to Abdul Manan Molla via Sahid Molla iii HO Raju to HO Chott
2026_MAD_1010448_1
WBMAD/ULB/RSM/658/25-26/2nd Call
Open Tender
CIVIL WORKS
60 days
RAJPUR SONARPUR MUNICIPALITY
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹29,596
19 May 2026
19 Feb 2026
11 Mar 2026
19 Feb 2026
9 Mar 2026
19 Feb 2026
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. a) Depth of excavation not exceeding1500 mm. [Page- 1, Item- 2.a]
Earth work in filling in foundation trenches or plinth with good earth. In layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on basis of measurement of finished quantity of work). (a) With earth obtained from excavation of foundation. [Page-1, Item-3.a ]
Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary. (a) Depth up to 150 mm. [Page-240, Item-3.16(Road Schedule)]
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. [Page- 14, Item- 1 (3rd Corri. Pg.- 01, Dt. - 04.06.18)]
Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation. (a) 1:3:6 proportion. [Page- 23, Item- B.1.a ( Rate Analysis attached )]
Brick work with 1st class bricks in cement mortar (1:6) (a) In foundation and plinth. [Page- 15, Item- 8.a ( Rate Analysis attached )]
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. [Page- 16, Item- 16 ( Rate Analysis attached )]
Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity). [Page- 2, Item- 4.A]
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (ii) With 1:4 cement mortar (b) 15 mm thick plaster. [Page- 189, Item- 1.ii.b ( Rate Analysis attached ) ]
Neat cement punning about 1.5mm thick in wall,dado,window sill,floor etc. NOTE:Cement 0.152 cu.m per100 sq.m. [Page- 192, Item- 15 ( Rate Analysis attached ) ]
Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor. 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement). Using grey cement. i) 20mm thk. [Page- 48, Item- 6.i ( Rate Analysis attached ) ]
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (f) 25 mm to 30 mm shuttering without staging in foundation. [Page- 42, Item- 36.f]
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. a) For works in foundation, basement and upto roof of ground floor/upto 4 m. a) Tor steel/Mild Steel III. Other Manufactuter not Specified. [Page- 43, Item- 40.a.i.I, ( Rate Analysis attached ) ]
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. a) Pakur Variety. [Page- 26, Item- 10.i (Refer Annex - II)]
Supplying Eucalyptus-bullah piles at work site, including dressing and making one end pointed. (iv) 150mm diameter [Page No.- 334, Item No.- 18.18,(III), PWD,VOL-III ,2017-18]
Supplying Eucalyptus-bullah piles at work site, including dressing and making one end pointed. (i) 100 mm diameter. [Page No.- 334, Item No.- 18.18,(III), PWD,VOL-III ,2017-18]
Labour for driving Sal-bullah / Eucalyptus bullah piles by monkey in sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles. (Payment to be made on length driven into the ground diameter of the measured at 1.50 m from the thicker end) (iii) 150mm diameter Length of each ballah which driven under= 3.35 m. [Page No.- 334, Item No.- 18.17,(III), PWD,VOL-III ,2017-18
Labour for driving Sal-bullah / Eucalyptus bullah piles by monkey in sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles. (Payment to be made on length driven into the ground diameter of the measured at 1.50 m from the thicker end) (iii) 100mm diameter Length of each ballah which driven under= 3.35 m. [Page No.- 334, Item No.- 18.17,(III), PWD,VOL-III ,2017-18
Labour fiting &fixing 10 cm to 13 cm diameter Sal-Ballah/Eucalyptus bullah as ties and runners including necessary nails and nuts. [Page No.- 338, Item No.- 18.41, PWD,VOL-III ,2017-18
Coal tarring on wooden surfaces including cost of materials (a) Double coat. [Page No.- 335, Item No.- 18.27(a), PWD,VOL-III ,2017-18
Earth work in filling for foundation trenches or plinth...……..ramming etc. (iv) With carried earth arranged by the contractor within a radius exceeding 5 km. but not exceeding 10 km. including cost of carried earth. [Page No.- 2, Item No.-3,C,IV, PWD,VOL-I ,2017-18]
Suppllying empty cement bags in good condition [Page No.- 336, Item No.- 18.28, PWD,VOL-III ,2017-18]
Filling empty Cement bags with dry earth or sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but excluding cost of sand and gunny bags. [Page No.- 336, Item No.- 18.29, PWD,VOL-III ,2017-18
Labour Welfare Cess @ 1%
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_2481046.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid