Tender Value
Refer Docs
EMD Value
₹48,800
Closing Date
31 Aug 2026, 5:00 pm4d left
EXECUTIVE ENGINEER, TNWC
TAMILNADU WAREHOUSING CORPORATION, NO. 82, ANNA SALAI, GUINDY, CHENNAI 600 032.
Special Repairs to Godown No.5 such as painting of walls inside and outside, painting of compound wall and providing of barbed wire fencing on the existing compound wall and construction of static tank at Trichy Warehouse.
2026_TNWC_695109_1
2508/2026/C2
Open Tender
Civil Works
Lump-sum
120 days
Trichy Warehouse
As per tender document
7 documents required · 7 mandatory
₹0
₹48,800
18 Aug 2026
18 Aug 2026
1 Sept 2026
18 Aug 2026
31 Aug 2026
18 Aug 2026
18 Aug 2026 - 28 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling, clearing away and carefully stacking materials useful for re-use of Asbestos sheet roofing without roor timbers / angles, stacked properly inside the campus as directed by the Engineer - Incharge. | 2,286 | M2 | - | - |
| 2 | Dismantling, clearing away and carefully stacking materials useful for re-use of brick masonry walls, depositing the debris in the low lying areas inside the campus as directed by the Engineer - Incharge. | 9 | M3 | - | - |
| 3 | Clean removal of Cement plaster from walls and racking out joints 20mm deep, clearing away and depositing the debris in the low lying areas inside the campus as directed by the Engineer-incharge. | 1,655 | M2 | - | - |
| 4 | Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of P.C.C., depositing the debris in the low lying areas inside the campus as directed by the Engineer - Incharge. | 117 | M3 | - | - |
| 5Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms at the site, etc., complete complying with standard specification and as directed by the departmental officers. | |||||
| 6Supplying and filling in foundation, basement, etc with filing crushed stone dust in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | |||||
| 7Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers - Mixing by mechanical means | |||||
| 8 | Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.- Mixing by mechanical means | 59 | M3 | - | - |
| 9 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, Sill slabs etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner , vertical stiffener, side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid). | 52 | M2 | - | - |
| 10 | Cement Concrete 1:1.5:3 (One Cement, One and half crushed stone sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges, centering and shuttering but including Super Plasticiser, mixing charges for machine mix, laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers - machine mix | 8 | M3 | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.41 MB
TRICHY_LSDOCUMENT.pdf
Tender Documents • 0.91 MB
BOQ_835845.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].