Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹84,288Accepted-AOC | ₹84,288 | 1 | Accepted-AOC accepted |
| Sl No | Description | Qty | Unit | MOHAMMAD IQBAL L1 |
|---|---|---|---|---|
| 1.00Building Maintenance | ||||
| 1.00 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 0.36 | cum | 2,542 ₹915.12 Lowest |
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 0.55 | cum | 2,129.84 ₹1,162.89 Lowest |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 0.06 | cum | 257.63 ₹15.46 Lowest |
| 1.00 | OD214443/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good
quality blasted rubble including packing to compactness to lines and levels cost and conveyance
of all materials labour charges etc. complete as per direction of Departmental officers at site | 0.53 | cum | 3,993.46 ₹2,132.51 Lowest |
| 1.00 | OD217834/2025-2026:DEPARTMENTAL DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good
quality blasted rubble including packing to compactness to lines and levels cost and conveyance
of all materials labour charges etc. complete as per direction of Departmental officers at site | 0.22 | cum | 2,055.62 ₹444.01 Lowest |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.23 | cum | 10,488.77 ₹2,359.97 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 13.72 | kilogram | 112.43 ₹1,543.1 Lowest |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 0.9 | sqm | 386.16 ₹347.54 Lowest |
| 1.01 | 50.6.2.1:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete | 0.71 | cum | 6,831.14 ₹4,877.43 Lowest |
Tender Value
₹84,288
EMD Value
₹2,107
Closing Date
20 Oct 2025, 5:00 pmClosed
Nayana D
Office of AE Kandalloor GP
ANNUAL PLAN 2025 26 PROJ NO 170 26 RENOVATION OF AYURVEDIC HOSPITAL KANDALLOOR GP PROJ NO 170 26 retender
2025_LSGD_808914_4
T3/2025-26 / kandallorGP
Open Tender
Civil Works - Buildings
Item Wise
180 days
Office of AE Kandalloor GP
Please refer Tender documents.
8 documents required · 8 mandatory
₹555
Yes
₹2,107
Yes
31 Jul 2026
13 Oct 2025
21 Oct 2025
13 Oct 2025
20 Oct 2025
13 Oct 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
3ayurvedichospital.rar
Other Document • 2.11 MB
BOQ_1349354.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .