Loading…
Loading…
| Sl No | Description | Qty | Unit | Johny KT L1 | JIYO PAUL L2 | A K ROY L3 |
|---|---|---|---|---|---|---|
| 1.00Maintenance | ||||||
| 1.00 | 15.56:Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 64.8 | sqm | 51.02 ₹3,306.1 Lowest | 56.51 ₹3,661.85 | 59.33 ₹3,844.58 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 0.12 | cum | 324.82 ₹40.28 Lowest | 359.72 ₹44.61 | 377.7 ₹46.83 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.12 | cum | 7,163.4 ₹888.26 Lowest | 7,932 ₹983.57 | 8,328.6 ₹1,032.75 |
| 1.00 | 50.6.3.2:Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x10 cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level for 10 cm thick wall in : CM 1:6 ( 1 cement : 6 coarse sand) including cost of scaffolding complete | 2.22 | cum | 7,807.02 ₹17,331.58 Lowest | 8,645 ₹19,191.9 | 9,077.25 ₹20,151.5 |
| 1.00 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 115.3 | sqm | 333.89 ₹38,497.52 Lowest | 369.76 ₹42,633.33 | 388.24 ₹44,764.07 |
| 1.01 | 13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer | 115.3 | sqm | 73 ₹8,416.9 Lowest | 80.85 ₹9,322.01 | 84.89 ₹9,787.82 |
| 1.01 | 13.44.1:Finishing walls with water proofing cement paint of required shade:New work (Two or more coats applied @ 3.84 kg/10 sqm) | 115.3 | sqm | 110 ₹12,683 Lowest | 122.44 ₹14,117.33 | 128.56 ₹14,822.97 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.34 | cum | 8,340.08 ₹2,810.61 Lowest | 9,235.97 ₹3,112.52 | 9,697.76 ₹3,268.15 |
| 1.01 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 97 | kg | 168.9 ₹16,383.3 Lowest | 187.05 ₹18,143.85 | 196.4 ₹19,050.8 |
Tender Value
₹4.3 L
EMD Value
₹10,800
Closing Date
11 Feb 2026, 6:00 pmClosed
Assistant Engineer
Office Of The Assistant Engineer LID and EW Aloor GP
Anganwadi maintenece
2026_LSGD_832566_1
ET1/AE/LID EW/ALR/2025-26/3anganwadi
Open Tender
Civil Works - Bridges
Item Rate
240 days
kallettunkara anganwadi no1 warrd 3
Please refer Tender documents.
7 documents required · 7 mandatory
₹955
Yes
₹10,800
Yes
7 May 2026
4 Feb 2026
13 Feb 2026
4 Feb 2026
11 Feb 2026
4 Feb 2026
4 Feb 2026 - 11 Feb 2026
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1399519.xls
BOQ • 0.31 MB
viewsbd.pdf
Tender Documents • 1.76 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .