Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹95 L
EMD Value
₹95,000
Closing Date
26 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Dy.Minicipal Commissioner - West Zone
REMOVING DEBRIES / SILT FROM EXISTING SEWERAGE / STORM WATER MAIN LINE BY CCTV DISILTING AT DIFFERENT T.P. ROADS AND IN DIFFERENT PLACES IN NARANPURA WARD, WEST ZONE(ARC).
367217
3/26-27 (T.N. 25)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹2,400
Municipal Commissioner, Ahmedabad
₹95,000
19 Nov 2026
19 Nov 2026
19 Nov 2026
26 Nov 2026
19 Nov 2026
120 days
Name of Work : - REMOVING DEBRIES / SILT FROM EXISTING SEWERAGE / STORM WATER
MAIN LINE BY CCTV DISILTING AT DIFFERENT T.P. ROADS AND IN DIFFERENT PLACES
IN NARANPURA WARD, WEST ZONE(ARC)
No. Item / Description Qty Rate Unit Total
Temporary / Permanent Plugging
for blocking of sewer line, branch
connections and diversion of flows
and removal of all plugs by any
means etc. comp. as directed by
Engineer In Charge of the work.
(J) 1800 mm dia to 2200mm Dia 1.00 7500.00 No.
(K) RCC Duct of any size 1.00 8000.00 No.
Provide everything else required
for diversion of flow by pumping
and / or bypassing and to maintain
the sewerage system functioning
normal and managing the flow
without any sur-charging, overflows
etc during the De-silting/
rehabilitation works of the sewer
line to the satisfaction of the
Engineer in charge of the work.
(J) 1800 mm dia to 2200mm Dia 1.00 1100.00 RMT
(K) RCC Duct of any size 1.00 1200.00 No.
Loosen, de-silt and thoroughly
clean and remove debris and
objects such as boulders, bricks
3 etc, bacteriological slimes, roots,
encrustations, grease, carbonated
deposits, etc from the sewer line
including disposal of silt / debris /
malba / objects etc, including
solidification of silt/malba/debris for
disposal to the dumping sites as
per the direction of the Engineer -
(i) ( For Above 80% silted line) 100 % 660.00 1230.00 RMT
( For 80% to 50 % Drainage silted
( For Less than 50% to 30 %
Dr.silted line) 50 % 60.00 615.00 RMT
(i) ( For Above 80% silted line) 100 % 400.00 1815.00 RMT
( For 80% to 50 % Drainage silted
( For Less than 50% to 30 %
Dr.silted line) 50 % 350.00 907.00 RMT
(i) ( For Above 80% silted line) 100 % 500.00 2460.00 RMT
( For 80% to 50 % Drainage silted
( For Less than 50% to 30 %
Dr.silted line) 50 % 250.00 1230.00 RMT
(i) ( For Above 80% silted line) 100 % 6.00 3280.00 RMT
( For 80% to 50 % Drainage silted
( For Less than 50% to 30 %
Dr.silted line) 50 % 3.00 1640.00 RMT
(i) ( For Above 80% silted line) 100 % 430.00 3700.00 RMT
( For 80% to 50 % Drainage silted
( For Less than 50% to 30 %
Dr.silted line) 50 % 100.00 1850.00 RMT
(i) ( For Above 80% silted line) 100 % 10.00 4450.00 RMT
( For 80% to 50 % Drainage silted
( For Less than 50% to 30 %
Dr.silted line) 50 % 10.00 2225.00 RMT
(G) 1200 mm dia
(i) ( For Above 80% silted line) 100 % 10.00 5040.00 RMT
( For 80% to 50 % Drainage silted
( For Less than 50% to 30 %
Dr.silted line) 50 % 10.00 2520.00 RMT
(H) 1400 mm dia
(i) ( For Above 80% silted line) 100 % 3.00 5880.00 RMT
( For 80% to 50 % Drainage silted
( For Less than 50% to 30 %
Dr.silted line) 50 % 1.00 2940.00 RMT
(I) 1600 mm dia
(i) ( For Above 80% silted line) 100 % 1.00 6720.00 RMT
( For 80% to 50 % Drainage silted
(iii) ( For Less than 50% to 30 % 1.00 3360.00 RMT
Dr.silted line) 50 %
(J) 1800 mm dia to 2200mm Dia
(i) ( For Above 80% silted line) 100 % 1.00 7560.00 RMT
( For 80% to 50 % Drainage silted
( For Less than 50% to 30 %
Dr.silted line) 50 % 1.00 3780.00 RMT
(K) RCC Duct of any size
(i) ( For Above 80% silted line) 100 % 1.00 8000.00 RMT
( For 80% to 50 % Drainage silted
( For Less than 50% to 30 %
Dr.silted line) 50 % 1.00 4000.00 RMT
Post-desilting colour CCTV/
Photographic survey including pan
and Zoom inspection of laterals
4 and defects and submission of
video tapes or CD inclusive of
colour photographs to the Engineer
in total 2 Sets.
(D) 800mm dia 15.00 250.00 RMT
(J) 1800 mm dia to 2200mm Dia 3.00 250.00 RMT
(K) RCC Duct of any size 3.00 250.00 RMT
Cutting of bituminous road of DBM
5 and Asphalt concrete of any 5.00 75.00 SMT
Brick work using common burnt
clay building bricks having crushing
strength not less than
35kg./Sq.Cm. in foundation and
plinth in Cement Mortar 1:5.(1-
Cement:5-finesand) (B)
Conventional (upto 10 ton)including
racking out joints, curing
scaffolding etc complete as
directed by any height.
Finding & Raising buried manhole
underneath road using Brick
massonery with Brick Strenghth
7 35kg / quare cm and cement 2.00 2500.00 No.
morter 1:4 and CC work up to new
road level as per instruction of
engineer in charge
Providing and fixing F.R.C. Extra
Heavy Duty (EHD-35) Manhole
Covers & Frames Cover : 728mm
8 ø & 100 mm thick circular 5.00 1540.00 No.
cover,35.00 MT load design,
100x2mm MS flat allround, 16mm
ø plain round bar for lifting the
cover & should be fitted with plastic
cups. Frame : 560 mm ø clear
opening, outer size- 888x888x175
mm. On the upper periphery of
frame 25 x 3 mm wide MS flat
should be well embed in concrete
to protect the edges of frame. FRC
E.H.D.-35 manhole cover & frame
incl. carting to the work site
Providing TMT Bar FE
reinforcement for R.C.C.work
including bending, binding and
placing inposition complete up to
9 floor two level (upto 10 ton) 10.00 44.40 Kg.
including cost of steel and binding
wire for reservoirs / structures only
including lift up to 6 meter height or
depth below G.L.for all diameter.
Survey to determine sewer
alignment, levels, M/H positions,
proximity of structures,
10 measurement of exact length 370.00 7.50 Rmt
between manholes and providing
two sets of autocad drawing as per
instruction of Engg. incharge.
Provinding Dummy or Plug the
running sewer by using M.S. Plate
,safety measures,Labour,mud
pump,D.G. set & Transportation of
11 the same machinery also inclues
removing of dummy when required
and placed labour & supervisor
remain present till the work comp.
etc. as directed.
600 mm dia. To 1200 mm dia. 5.00 60000 No.
above 1200 mm dia. 8.00 90000 No.
(in words also)
SealandSignatureoftheBidder
TenderFeeRs.2400.00
EarnestMoneyRs.95,000.00
Contractor’sName&Address:
MEMORANDUMOFWORKINBRIEF
REMOVING DEBRIES / SILT FROM EXISTING SEWERAGE /
1. Nameof STORM WATER MAIN LINE BY CCTV DISILTING AT
DIFFERENT T.P. ROADS AND IN DIFFERENT PLACES IN
NARANPURA WARD, WEST ZONE(ARC)
Rs.95,00,000.00(exclusiveofGST).GSTwillbepaidextraby
2. Tender AMC/Authorityatprevailingratetothecontractor.
1% oftheTender Costintheform(Rs.95,000.00)
3. Earnest (D.D./PayOrder/LocalMicrCheck/B.G.)
4 Tender DemandDraftofRs.-2400.00
6. Time- Only 12 Months from start of the work excluding monsoon.
7. Validity 120Days
8. Eligibilit Register “D” class in PWD in Govt. R&B/CPWD/AMC or equivalent
y registration with any other state Govt. or institutions.
9. Submissionoft Dt-26.11.2026upto18:00PM
(ii)Mod a) In Sealed cover in duplicate copies by Registered Post
eofSen A.D,orbyCourier.orhanddelivery
ding b) Tendersentbyordinarypostwillberejectedoutright.
(iii)Descripti a) Nameofwork,TenderNoticeNo.&TenderNo.
onessentialt b) DateofreceivingtenderbyCorporations.
(iv)Modeof ThePricebidshallbesubmittedonlineonly.tshallnotbesubm
quotingrate ittedPhysically.
10. DateofO Dt-27.11.2026upto15:00 PM
Placeof Submission of EMD. Tender fee and other Documents during officehours: On
11. Subissi Dt.27.11.2026 upto12:00hrsto Assistant Manager , 2nd Floor,
A.M.Office, Stadium Sub Zonal Office, Nr. Panchshil Water Tank, Naranpura
ender Railway Crossing Ahmedabad
(1) Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2)Rs.2500 per
day (for tenders amounting above 10 Lakhs
12. Penalty andupto30Lakhs),(3)Rs.5000perday(foralltendersamounting
DuetoD above30Lakhs)butnotmorethen10%ofbill
13. DefectLi Asper ‘B-1FormClose
Whenever a work is allotted by Engineering staff, whether minor ormajor of part
Timeper thereof of any amount, the contractor shall be
14. mittedto boundtostarttheworkswithin48hoursofintimationofwork.Communicationdonetelep
startpart honicallyviaSMS,ViaWhatsappand
sofwork throughletter /E-mailshallbeconsidered legal and bindingforthe
same. Failure of comply to start the works in 48 hours of intimationas above
by contractor the contractor shall be levied penalty of (1)Rs.1000/-perday
(fortendersamountingupto10Lakhs),(2)Rs.2500 per day (for tenders
amounting above 10 Lakhs and
upto30Lakhs),(3)Rs.5000perday(foralltendersamountingabove
30Lakhs).Threetimesfailuresbycontractorshallmakecontractorresponsibletobe
blacklistedunlessandotherwisejustifiedproperly
inwriting/bindingwithin15daysoflastnoticeof
The staff of the contractor shall wear safety jackets,hoes, helmets
etc. while on duty and any violation will attractfineofRs. 5,000/-foreach
15. Safety Failuretoerectsafetysignageortryingtocarryoutheworkswithoutpro
perprecautions/safetymeasuresasequiredwillattractafineofRs.5,000/-
foreachincident.
16. Defect &Liability The contractor shall be responsible to make good and remedy at his own
Period expense any defect which may develop or may be noticed before the period
mentioned hereunder from the certified date of completion, The within
days of receipt of the notice. In the case of failure on the part of the
contractor, the Engineer-in-charge may rectify or remove or re-execute the
work at the risk & cost of the contractor. The Engineer-in-charge shall be
entitled to appropriate the whole or any part of the amount of security
deposit towards the expenses, if any, Incurred by him in rectification, removal
or re-execution. The Defects Liability period shall be as under(a) for all works
costing upto Rs. 50,000 ( amount put to tender), the period shall be 3 months
from the certified date of completion.
(b) for all works costing more than Rs. 50,000 and upto Rs. 1 crore (amount
put tender), the period shall be 6 months from the certified date of
completion or one monsoon, whichever is later.
(c) for major projects costing more than Rs. 1 crore, the period shall be
months from the certified date of completion which should include one
(d) For building works, the period specified in (a), (b) or (c) above OR elapse
of monsoon period following the certified date of completion, whichever is
later. For the purpose of deciding the monsoon period, the 30th September
may be treated as the last date.
17. Time permitted Whenever a work is allotted by Engineering staff, whether minor or major of
to start parts of part thereof of any amount, the contractor shall be bound to start the works
work within 48 hours of intimation of work. Communication done telephonically via
SMS, Via Whatsapp and through letter / E-mail shall be considered legal and
binding for the same. Failure of comply to start the works in 48 hours of
intimation as above by contractor the contractor shall be levied penalty of (1)
Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2) Rs.2500 per day
(for tenders amounting above 10 Lakhs and upto 30 Lakhs), (3) Rs.5000 per
day (for all tenders amounting above 30 Lakhs). Three times failures by
contractor shall make contractor responsible to be black listed unless and
otherwise justified properly in writing / binding within 15 days of last notice of
18. Compensation 10% of Remaining work (As per Circular)
19. Addendum/Corri Addendum/Corrigendum If any Shall be Published 48 Hrs. Price To the Final
gendum Submission Time And Date. The Same Shall From a part Of Tender AndThe
Same As to be Attached Along WithThe Tender Document.
20. EPF Act As per Acoount Department circular no-37 Date:09/08/2018
21. GST GST will be paid extra by AMC/Authority at prevailing rate to the Contractor.
Contractor'sSigAdd.C.E.(West Zone)
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
ુ ામ :-Desilting of drainage line work At Acher Gamtal Road, Parimal Hospital Road, Visat to
Rathi Apartment Road, Visat to Tapovan Circle Road, Jawahar Chowk Circle to Sarvottam Nagar
Road, Ramnagar Road and the surrounding areas by CCTV camera method in Sabarmati ward
તા.૦૭.૧૦.૨૦૨૩નાસરક લ ગેનાLiquidated Damage For Delay
Penalty per one
Sr no Category Category Problem SLA Period Problem per day
Engineering Drainage
1 No Drainage Machinehole Cover 24 Hours Rs.1000/-
Engineering Drainage 96 Hours
Frequent Breakdown & Blockage Of
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
Financedept. circular No-03 Dt.28-04-2023
(A) Guarantee issued by following banks will be accepted as SD/EMD on permanent basis.
All nationalizedBanks
(B) Guarantee issued by following banks will be accepted as SD/EMD for the period up to March -31,
The Validity cut-off date in the GR is with respect to the date of issue of bank Guarantee irrespective of the
date of termination of Bank Guarantee.
(I)Commercial Banks :-
1. A U Small Finance Bank
3. City Union Bank
4. DBS Bank India Limited
6. Equitas Small Finance Bank
7. Federal Bank
10. IndusInd Bank
11. Kotak Mahindra Bank
13. Standard Chartered Bank
14. Tamilnadu Mercantile Bank
15. Ujjivan Small Finance Bank
(II)Co-operative and Rural Banks OfGujarat :-
1. The Ahmedabad Mercantile Co-Operative Bank Ltd
2. The KalupurCommerical Co-operative Bank Ltd
3. Nutan nagrik Sahakari Bank Ltd
4. Rajkot nagrik Sahakari Bank Ltd
5. Saraswat Co-Operative Bank
6. Saurashtra Gramin Bank
7. The Gujarat State Co-Operative Bank
8. The Mehsana Urban Co-operative Bank Ltd
9. The Surat District Co-Operative Bank
10. The Surat Peoples Co-Operative Bank
Seal and Signature of the Bidder Add. City Engineer
TERMS & CONDITIONS
( A) INSTRUCTIONS TO BIDDERS (ITB)
( B ) GENERAL TERMS & CONDITIONS
( C) FINACIAL TERMS & CONDITIONS
( D ) SAFETY/TECHNICAL SPECIFICATION/MAIN CONDITION
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( A) INSTRUCTIONS TO BIDDERS (ITB)
1. Procedure for Submission of Tender
a). The Bidder should quote the price bid in tender form before schedule time Tender Document, tender
fee & EMD (Draft /DD) and all other enclosures as asked in tender.
b).The bidder shall submit the following Tender documents physically in hard copy in two separate
envelope (marked as “original” and other marked as “Duplicate”) in schedule time by RPAD/
Speed Post/ Hand Delivery in duplicate.The Bid envelopes shall be marked as follows:-
Tender Document
Registration certificate of class
c).The envelope shall be addressed to the Employer at the following address:
Asst. Manager (Admin)
2nd Floor,Dr.Ramanbhai Patel Bhavan,
Usmanpura, Ahmedabad Municipal Corporation,
W.Z. Office, Ahmedabad-380013
d).Bear the following identification:
“TO BE OPENED ONLY IN PRESENCE OF THE EVALUATION COMMITTEE”
e). Indicate the name and address of the bidder.
If the outer envelope is not sealed and marked as above, the Employer will assume no responsibility
for the misplacement or premature opening of the bid.
f).All information has to be typed or hand written legibly. All pages of the Bid have to be initialed by the
g) All The Bid Document Essentially Needs to be Properly binded/steppled
2. Assessment of Submission
2.1 The Employer will open the technical bid ofphysically submitted document of all the bids received
for the package (except those received late) containing the sealed Tender volume and other
enclosures then announce the names of bidders in the presence of bidders or their representatives
who choose to attend on the date and time mentioned in the NIT In the event of specified date of
bid opening being declared as a holiday for the Employer, the Tender will be opened at the
appointed time and location on the next working day.
2.2 In Physical submission, Bidders detailed and tender fee, E.M.D. shall be opened first. The Employer
at the opening will announce bidder’s names, , the presence/or absence of EMD, the amount and
validity of EMD furnished with each bid, is valid registration and such other details, as the Employer
may consider appropriate.
2.3 The Employer will determine whether the bid is accompanied by the required EMD.
2.4 If the EMD furnished does not conform to the amount and validity period as specified in the
Invitation for Bid and has not been furnished in the form, the bid shall be rejected by the Employer
as non-responsive and the Tender volume will be returned to the bidder.
2.5 Subject to confirmation of the EMD by the issuing bank, the Tender volume accompanied with
valid EMD will be taken up for further evaluation. In case, the Bank does not confirm the EMD, the
bid shall be rejected as non-responsive and no further evaluation carried out.
2.6 The tender volume will further be examined to determine whether the bid has been properly
signed, meets the eligibility and qualification criteria, has the required available bid capacity, is
accompanied by the requisite certificates, undertaking and other relevant information specified in
the bid documents and is substantially responsive to the requirement of the bidding documents
and provides any clarification for ascertaining the correctness of the information/details.
2.7 If the Tender volume is not substantially responsive, it will be rejected by the Employer and will not
subsequently be made responsive by correction or modification or withdrawal of the
nonconforming deviation or reservation.
3. Evaluation and Comparison of Tender volume
The Employer will evaluate and compare only those Tender volumes which are determined to be
substantially responsive in accordance with Clause 2and qualified for award of Contract in
accordance with Clause 5(General Terms and Condition).
4. Procedure for Tender Opening
Received copies of tender in physical form with in schedule time, will be open on schedule date and
time. In the event of specified date of bid opening being declared bidders who qualify the criteria
then bidder bid will be considered for opening of price bid.
5.1 The Employer will award the Contract to the bidder whose bid has been determined to be
substantially responsive to the bidding documents and who has offered the loSouthEvaluated Bid
Price, provided that such bidder has been determined to be (i) eligible in accordance with the
provisions of Clause 3(General Terms and Condition); and (ii) qualified in accordance with the
provisions of Clause 5(General Terms and Condition).
6. Notification of Award
6.1 Prior to expiration of the period of bid validity prescribed by the Employer, the Employer will notify
the successful bidder by cable/fax and confirmed by registered letter that his bid has been
accepted. This letter shall name the sum which the Employer will pay the Contractor in
consideration of the execution, completion and maintenance of the Works by the Contractor as
prescribed by the Contract.
6.2 The notification of award will constitute the formation of the Contract.
7.A successful Bidder has to deposit security deposit / Bank Guarantee as per Circular after receiving
letter of Indent. Time limit of work will commence from the date of issue of work order.
8. Clarification of Bids
8.1 To assist in the examination, evaluation and comparison of bids, the Employer may, at his
discretion, ask any bidder for authentication the correctness of the information/details furnished by
him in his bid. Such request by the Employer and the response by bidder shall be in writing or by
8.2 Subject to above clause, no bidders shall contact the Employer on any matter relating to his bid
from the time of bid opening to the time contract is awarded.
8.3 Any effort by the bidder to influence the Employer in the Employer’s bid evaluation, bid
comparison or contract award decisions may result in the rejection of his bid.
9.1 Information relating to the examination, clarification, evaluation and comparison of bids and
recommendations for the award of a contract shall not be disclosed to bidders or any other persons
not officially concerned with such process until the award to the successful bidder has been
announced. Any effort by a bidder to influence the Employer's processing of bids or award
decisions may result in the rejection of his bid.
10.1 The bidder is advised to visit and examine the Site of Works and its surroundings and obtain for
itself on its own responsibility all information that may be necessary for preparing the bid and
entering into a contract for construction of the Works. The costs of visiting the Site shall be at the
bidder’s own expense.
10.2 The bidder and any of its personnel or agents will be granted permission by the Employer to enter
its premises and lands for the purpose of such inspection, but only upon the express condition
that the bidder, its personnel and agents, will release and indemnify the Employer and its
personnel and agents from and against all liability in respect thereof and will be responsible for
death or personal injury, loss of or damage to property and any other loss, damage, costs and
expenses incurred as a result of the inspection.
11.0 Cheklist for submition of Technical Bid.
11.2 valid Registration Copy.
11.3Valid E.M.D
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( B ) GENERAL TERMS & CONDITIONS
1. Scope of Bid
1.1 The Ahmedabad Municipal Corporation hereinafter called "the Employer" invites Tender document
for the construction of works (as defined in these documents, hereinafter referred to as "the Works")
detailed in the table given in the IFB.
1.2 The Works consist of: “as Above"
Source of Funds
1.1 The expenditure on these Works will be met by AHMEDABAD MUNICIPAL CORPORATION.
2.Eligibilitycriteriafor Bidders
Thisinvitation for bidsis open tobidders whomeetthe followingrequirements:
2.1 A bidder shall have similar type experience of the work in any Govt., Semi-
Govt. orULBs of any such organization with the latest de-silting equipment
and undertaken as per Supreme Court/ High Court Guidelines / Direction of
2.2 Bidder shouldhave registered his classin Ahmedabad Municipal Corporation
within six months after allocation of the work.
2.3 Bidder shall have completed 5 km Works (ending on the date of opening of
this bid)in Ahemedaba Municipal Corporation or in any Government
organization or any such body with satisfactory certification of client.
2.4 Bidder shall have experience of de-silting of sewer diameter 300 to
mm or above in India in last 7 years minimum in Ahemedaba Municipal
Corporation or in anyGovernment organization or any such body with
satisfactory certification of client.
2.5 Jointventureis notallowed forthe work.
2.6 Bidders shall provide such evidence of their continued eligibility that is
satisfactory to the Employer, as the Employer shall reasonably request.
2.7 Bidders must own 2 number high capacity vacuum machine and 4 number
silt carryingpay loader for each package tender. Bidders name should be
there in RTO registration copy(RC Book) in the case of ownership of the
2.8 Joint venture agreement for machinery shall be considered in any occasion.
Bidder shall submit joint ventureagreement for extra machineryto be
provided in the case ofproviding the machinery by joint venture agreement.
Right of use these machinery by this mutual agreement between the
agencies should bestated on stamp paper of 100 Rs. only.Bidder shall note
that, Right of use these machinery onrent shall not be considered at any
2.9 Bidder shall submit commitments on stamp paper of 100 Rs. for
provision of machinery required (as stated in clause no. 3.7 and
2.10 Bidder must own 1 number minimum four wheelercolour CCTV system
(with sewage flow)withcamerahavingopticalzoomwith panandtilt
360degreein allthreeaxis,which shall be controlled from outside of the
2.11 Bidder shall have to submit completion certificate of effective and efficient
workmanship from the organizations cited above.
2.12 At the Employer's request, the bidder having offered the lowest evaluated
financial bidmay be required to provide evidence of the origin of materials,
equipment and services to the satisfaction of the Employer at the time of
evaluation of the technical bid.
2.13 Bidders must provide certificates of training of their staff, which are on
their payroll at the time of evaluation of the technical bid.
2.14 Bidder must submit Methodology for the work in respect of Honourable
Gujarat High court as well as Supreme Court order of cases related to death
of labour working de-silting of the sewer line.
2.15 Bidder shall have to submit affidavit stating that work shall be carried out
by mechanized vacuum technology ( by super sucker machine) ,alllabour
shall not enter in manhole or pipeline and Contractor shall be solely
responsible incase of any accident will occur.
2.16 The contractor shall have posses such type of O & M operation experience
with Govt./Semi Govt. sectors preferably. Bidder must have prior
experience of carrying out Operation & Maintenance of minimum 5-years
with any Civic Body.
2.17 Contractor must be registered with labour laws Act. They shall have to Act
and obey as per govt. rules and regulations.
3. Eligible Material, Equipment and Services
3.1 At the Employer's request, the bidder having offered the loSouthevaluated financial bid may be
required to provide evidence of the origin of materials, equipment, and services to the satisfaction of
3.2 For purposes of Sub Clause 4.1, "origin" means the place where the materials are mined, grown,
produced or manufactured; similarly for equipments and from where the services are provided.
4. Qualification of the Bidder
To be qualified for award of Contract, bidders shall:
a) Submit a written power of attorney authorizing the signatory of the bid to commit thebidder; and
AH M ED A BA D M U N IC I PAL CO R PO RA T I O N
E NG I NE ER IN G D E P A RTM E N T
Name of Work :-" REMOVING DEBRIES / SILT FROM EXISTING SEWERAGE /
STORM WATER MAIN LINE BY CCTV DISILTING AT DIFFERENT T.P. ROADS AND IN
DIFFERENT PLACES IN NARANPURA WARD, WEST ZONE(ARC).
Th e d et a i ls o f r e in f o r c e m ent o f R.C .C . w o r k sh al l b e as p er d es ig n a n d in s t r u c t io n s o f C it y
Th e con t r acto r s h all h a ve t o m a i n t a in a c co u n t o f st ee l , c e m e n t a n d oth e r m a te r i a ls t h at
m a y b e b r ou gh t b y h i m o n si t e . Th is ac co u n t s h al l b e r egu l a r l y m ai n t a i n e d an d k ep t op en
Mix i n g o f co n cr et e s h a ll b e d o n e b y con c r et e m i xe r m ach i n e. A rr an ge m e nts o f b i n d in g
vi b r at o r f o r R. C .C . w o r ks if r eq u i r ed s h a ll h a ve to b e m ad e b y t h e c o n tr a cto r .
Th e c o n t r a cto r sh a l l b e r e m a i n r es po n s ib l e f o r Wo r k m en ’ s c o mp e n s at i o n if a n y w h en s u ch
c as e o c cu r s. T h e c on t r a ct o r sh a l l ar r a n g e f o r m e d a m p e r s an d in n ig h t an d he s h all b e
res p o ns ib l e f o r a n y d am a g e o f l if e a n d l i m b o r p ro p er t y i f an y h ap p en , d u r in g th e e xe cu t io n
co n t r ac tor at t h is r i s k a n d c o st .
Fo r mi x in g mo r t ar ei th er f or m a s o nr y o r f o r p l ast er o r f o r a n y o t h e r p u r p os e c o n tr ac to r
In o n cas e h e s h a ll b e a l l o w ed to mi x t he m o r t a r ei t h e r o n f l o o r o r an y f i n i she d s u rf a c es.
sh a ll p ay th e w a t er ch ar ges as p er w a t er m et er .
If an y e x t r a it e m c r op s u p d u r i n g t h e p r o g re s s o f w o r k t h e s a m e sh a l l b e c a rr ied o u t b y t h e
co n t r ac tor a nd he sh a l l b e p ai d at t h e r at e f ix e d b y C . E. / Ad d l. C i t y En gi n e er as p er th e r at e
an al ys is b as ed o n cu r r e n t m ar ket r at es .
If in t h e i nt er est o f t h e C o r p o r a ti o n i t i s n e ces s ar y t o ch an g e ei th e r an y s it e o r t h e d es i gn
th e r a te q u o t ed b y hi m an d n o c l a i m f o r e x t r a f o r su b s e qu en t c h an ges m a y b e en t e r t a in ed .
Th e c u b i c a l c o n t en ts o f t h e c e men t b a g sh al l b e t a k e n as 1 - 2 0 cf t. Pe r b ag a n d t h e
co n t r ac tor s s h a l l h a ve t o p r e p a re t h e m e asu r es b o x es a cc o rd i n g t o t h is m e asu r e .
co n t r ac tor an d w h ich wi ll b e p a i d a t t h e ti m e o f f i n al b i l l.
C on t r ac t or w il l b e f ul l y res p on s i ble f o r c om p l i a nc e of t he v ar i ous pre vi si on und er c on t r a ct
Th e t en d er f o r t h e w o r k s h a ll r e m ain op en f o r a pe r i o d ( 1 20 ) d a ys f ro m t h e d a t e o f o p en in g
th e Mu n i c ip al C o rp o r at i on , th e Mu n i cip al C o r po r at io n sh a l l w it h o u t p r ej u d i c e to a n y r igh t
or r e m e d y b e a t l i b er t y to f o rf ei t in f u l l t h e s aid e a r n es t m o n e y a b s ol u t el y .
As p er C i r cu l ar N o. MC R 2 1 7 6 ( 9 6 ) 2 4 1 8 ( i i) G H H d at ed 3 1 - 0 3 - 7 7 is s ued b y G o ve rn m en t o f
Gu j ar at c o n tr a ct ors ar e r e qu es t e d t o p r o du c e t h ei r q u a r r y m a ter i a ls f o r c o n s tr u c t i o n w o r k
app l i c a bl e as p er A MC R u les .
Co n tr acto r h as t o m a ke hi s o w n a r r a n g e m en t f o r p ro c ur e m en t o f s t ee l a n d c e me n t .
iii ) In cas e o f t e nd er d o w n l o ad e d f r o m w eb si t e , t e nd er f e e & E M D s h o u l d be su bm i tt ed
iv) Co n d it i on o f f o r m B 1 St a nd ar d Sp ec if i ca t io n of m at er i a l & co d e o f p r a ct ic e w ill b e
app l i c ab le .F o r m B1 & B 2 c an b e is a va i lab l e in web s it e. C on d it io n o f F o r m B -1 F or
D ef ec t l iab i li ty C lau s e is n ot app li c ab l e Fo r t hi s Wo r k .
for B u i l di n g W or k s book a v a i l a bl e from Gujar at Book Stores (Pvt.) Ltd. Sector-
21,Gandhinagar,D E T A IL E D G E N E R A L T E C H N I C A L S P E C I F I C A T IO N S can b e av ai l a b l e f r o m
Co n t r a ct o r ’s S i gn a t ur e Ad d . C it y En g in eer
General information
All individual firms must complete the information in this form. Nationality information shall be
provided for all owner(s) or applicant(s) that are partnership or individually owned firms.
1 Name of firm:
2 Head office address With Contact no.:
3 Local office address (if any) With Contact no.:
4 Telephone/ Contact With name :
5 E-mail address:
6 Place of incorporation/registration:
7 Year of incorporation/registration:
Additional information regardinglitigation, debarment, arbitration, etc.
AuthorisedSigneture Bidder
5.3 Disqualification
Even though the Bidders may meet the above criteria, they are subject to be disqualified for any of the
following reasons:
a) Misleading or false representation in the forms, statements and attachments submitted and included
b) Record of poor performance such as abandoning the work, rescinding of contract for which the
reasons are attributable to the non-performance of the contractor, consistent history of litigation
awarded against the applicant or financial failure due to bankruptcy.
c) Has been identified by the Employer as poor performer in implementation of ongoing AMC works.
d) The bidder fill (tender) in percentage rate above or below and total amount (both in figures and
d) The bidder fill (tender) in percentage rate above or below and total amount (both in figures and
words) only in E-Tender (Online) Not to fill in hard copy of Tender documents
5.4 Debarment/Black listing
Notwithstanding the above, the Employer may debar or blacklist any of the bidder(s) for their
misleading or false representations in the forms statements etc. for the period to be decided by the
6. One Bid per Bidder
6.1 Each bidder shall submit only one bid per contract package either by himself or as a partner in a
joint venture. A bidder who submits or participates in more than one bid for a contract package will be
7. Bidding Documents
The bidder is expected to examine carefully the contents of all the above bid documents. Failures to
comply with the requirements of bid documents will be at the bidder's own risk. Pursuant to Clause
bids which are not substantially responsive to the requirements of the bidding documents will be
8. Language of Bid
The bid, and all correspondence and documents related to the bid exchanged between the bidder and
the Employer shall be written in the English language. Supporting documents and printed literature
furnished by the bidder may be in another language provided they are accompanied by an accurate
translation of the relevant passages in the English language, in which case, for purposes of
interpretation of the bid, the English translation shall prevail.
9.1. Unless stated otherwise in the bidding documents, the Contract shall be for the whole works as
described in bidding documents, based on the percentage rate amount in the Bill of Quantities
submitted online by the bidder.
9.2. The bidder shall fill (tender) in percentage rate above or below and total amount (both in figures
9.2. The bidder shall fill (tender) in percentage rate above or below and total amount (both in figures
and words) for overall items of the Works provided in the Bill of Quantities
10. Bid Validity
10.1 Bids shall remain valid as per Instruction to Bidders (ITB) after that deadline date for bid
submission specified in Clause. The Employer as non-responsive shall reject a bid valid for a
shorter period.
10.2 In exceptional circumstances, prior to expiry of the original bid validity period, the Employer may
request the bidders to extend the period of validity for a specified additional period. The request
and the responses thereto shall be made in writing or by fax. A bidder may refuse the request
without forfeiting his bidder agreeing to the request will not be required or permitted to modify
his bid but will be required to extend the validity of his Bid Security for the period of the
extension, and in compliance with Clause 2 ( Financial Terms & Conditions) in all respects.
11. Format and Signing of Bid
11.1 The bidder shall prepare two copies of the documents comprising the bid as described in
Instructions to Bidders.
11.2 The bid shall be typed or written in indelible ink and shall be signed by a person or persons duly
authorized to sign on behalf of the bidder.
11.3 The bid shall contain no alterations, omissions or additions, except those to comply with
instructions issued by the Employer, or as necessary to correct errors made by the bidder, in
which case the person or persons signing the bid shall initial all such corrections.
11.4 All witnesses and sureties shall be persons of status and probity and their full names,
Occupations and addresses shall be printed below their signatures.
12. Deadline for Submission of Bids
Bids must be received by the Employer at the address specified above not later than the time and date
specified in the NIT.
Any bid received by the Employer after the deadline for submission of bids will be returned unopened
14. Signing of Agreement
At the same time that the Employer notifies the successful bidder that his bid has been accepted, the
Employer will direct him to submit the Performance Security and attend the Employer's office on a date
determined by the Employer for signing the Form of Agreement.
15. The selection process will lay high emphasis on the ability and competency of contractors to do high
quality work within the given time schedule.
16. The onus of providing, all necessary company / project related information, in appropriate manner
and medium, so as to demonstrate the competency of the bidder and to allow proper evaluation, will
rest entirely on the Bidder.
17. All clause shall be operative from the date of issue of work order and up to the expiry of original and
extended time limit.
18. Legal Condition:-
Corrupt or Fraudulent Practices
The Employer will reject a proposal for award if he determines that the Bidder recommended for
award has engaged in corrupt or fraudulent practices in competing for the contract in question. The
Employer will declare the firm ineligible, either indefinitely or for a stated period of time, to be
awarded a contract by AHMEDABAD MUNICIPAL CORPORATION if it at any time determines that
the firm has engaged in corrupt or fraudulent practices in competing for the contract, or during
“corrupt practice” means behavior on the part of officials in the public or private sectors by
which they improperly and unlawfully enrich themselves and/or those close to them, or induce
others to do so, by misusing the position in which they are placed, and it includes the offering,
giving, receiving, or soliciting of anything of value to influence the action of any such official in
the procurement process or in contract execution; and
“fraudulent practice” means a misrepresentation of facts in order to influence a Procurement
process or the execution of a contract to the detriment of the Borrower, and includes collusive
practice among bidders (prior to or after bid submission) designed to establish bid prices at
artificial non-competitive levels and to deprive the Borrower of the benefits of free and open
Municipal Commissioner reserves the rights to reduce/increase the scope of work and contract
without assigning any reason thereof.
If Ahmedabad Municipal Corporation is convinced that the Bidder has resorted to material
misrepresentation or provided fraudulent information / statement, the said Bidder will be liable for
disqualification / rejection at any stage.
Proof for fulfillment of eligibility criteria should be submitted along with Tender volume. If the
Tender volume is submitted without valid documents and without proof of eligibility criteria it will
Those who do not meet with the eligibility criteria need not submit the Tender document.
Tenders, which do not fulfill all or any of condition or are submitted incomplete in any respect or
are conditional tenders, will be rejected.
Contractor shall be responsible to obey all Labour Laws, Environmental and Safety Laws.(the
existing laws as well as framed from time to time). Any penalties laid due to violation of such laws
shall be directly deducted from the contractor's outstanding.
19. Administrative Conditions:-
Safety and Signage
Contractor has to arrange for the complete safety of the persons working for project, users of the
road i.e. public and vehicles also. All the arrangements of traffic drums, metal / fiber cones, traffic
blinkers, traffic signs as per design, safety tapes etc. to be arranged at site. Necessary florescent
marking on traffic signs to be provided so that it should be visible at night. During night working
hours safety in charge personnel shall be provided with florescent jackets. This shall be Provided at
no extra cost by the bidder under attaché with specified in the tender documents under payable
Liaison with local authority for electrical connections for the AMC
The contractor is responsible for liaison with local authority for change in supply connection or new
connection on behalf of AMC. It includes filling the necessary application to power Supply
Company, follow up and getting the supply, filling the necessary test reports to the power supply
company. All official fees including security deposits and other expenses shall be of initially paid by
the contractor. AMC may support to get the temporary connection and may at its diseretien get
the same converted to permanent connection at the same of AMC if desired do,and contractor
shall as no extra cost support the same. In this case AMC my be as the remaining cost subject to
20 :- CONTINGENT FEE:
The Contractor warrants that he has not employed any person to solicit or secure the contract
upon any agreement for a commission, percentage, brokerage or contingent fee. Breach of this
warranty shall give the Municipal Commissioner the right to cancel the contract or to take any
other measure as the Municipal Commissioner may deem fit. The warranty does not apply to
commissions payable by the contractor to establish commercial or selling agent for the purpose
of securing business.
No officer, employer of the Municipal Corporation be admitted to any share or part of this
contract or to any benefit that may rise there from.
21:-OVERPAYMENT AND UNDERPAYMENT:
Whenever any claim fourths payment of a sum to the Municipal Corporation arises out of or
under this Contract against the contractor the same may be deducted by the Municipal
Corporation from any sum then due or which at any time thereafter may become due to the
contractor under this contract and failing that under any other contract with the Municipal
Corporation or from any sum due to the contractor with the Municipal Corporation (which may be
available with Municipal Corporation), or from his retention money, or he shall pay the claim on
demand. The Municipal Corporation reserves the right to carry out post payment audit and
technical examination of the final bill including all supporting vouchers, abstracts, etc.
The Municipal Corporation further reserves the right to enforce recovery of any over payment
when detected not withstanding the fact that the amount of the final bill may be included by the
If as a result of such audit and technical examination any over payment is discovered in respect of
any work done by the Contractor or alleged to have been done by him under the contract, it shall
be recovered by the Municipal Corporation from the contractor by way of all the means
prescribed above or if any under payment is discovered by the Municipal Corporation, any
amount due to the contractor under this contract or under payment may be adjusted against any
amount then due or which may at any time thereafter become due before payment is made to
the contractor from him to the Municipal Corporation on any other contract account whatsoever.
If, at any time, there should be evidence of any lien or claim for which owner might have become
liable and which is chargeable to the contractor, the owner shall have the right to retain out of
any payment then due or thereafter to become due an amount sufficient to completely
indemnify the owner against such lien or claim or if such lien or claim be valid the owner may be
or become due and payable to the contractor. If any lien or claims remaining, unsettled after all
payments are made, the contractor shall refund or pay to the owner all money that the latter may
be compelled to pay in discharging such lien or claim including all cost and reasonable expenses.
Contractor shall not sub-let the work without permission of the authority.
Joint venture and subcontracting shall not be allowed under this tender
Addendum or corrigendum conveying any change or correction in respect of the work shall form the
part of the contract documents. The full consideration shall be given to such addendum or corrigendum
before submission of tender duly filled in by the contractor. Therefore, the contractors shall have to
kindly refer the tender for such addendum or corrigendum published by AMC through its website
www.amc.nprocure.com&www.nprocure.com 48 hours prior to the deadline of submission of the
tender. Tenderers shall verify the number of addendum issued and enclose the same with the tender
documents , failing which the tenders shall be liable for rejection and no any complaint in respect to
this shall be entertained under any circumstances.
Seal and Signature of the Bidder Addl.City Engineer
Date: (West Zone)
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( C ) FINACIAL CONDITION
1. Cost and Currencies of Bidding
The bidder shall bear all costs associated with the preparation and submission of his bid and the
Employer will in no case be responsible or liable for those costs.
Currencies of Bid and Payment
The rates and the prices shall be quoted by the bidder entirely in Indian Rupees
All payments including advances, if any, shall be made in Indian Rupees.
2.Earnest Money Deposit :-
2.1 Bank guarantees (and other instruments having fixed validity) issued as surety for the bid shall be
valid for 28 days beyond the validity of the bid.
2.2 The EMD of the unsuccessful bidders, except for L1,L2 and L3 bidders, will be returned as promptly
as Early as possible as but not later than 28 days after the expiration of the period of bid validity.
2.3 The EMD of the successful bidder, along with second and third loSouthtenders, will be returned
when the bidder has furnished the required performance security and signedthe agreement.
2.4 Earnest Money Deposit may be forfeited
a) if the bidder withdraws his bid during the period of bid validity;
b) in the case of a successful bidder, if the bidder fails within the specified time limit to
i) Furnish the required Performance Security or
ii) Sign the Agreement.
3.(A) SecurityDeposit :-
Within 15 (fifteen) Working days of the date of receipt of the Letter of Intent (LOI) the successful
bidder shall deliver to the Employer, a Initial Security Deposit Shall be submitted as per C.E.
Circular.in the form of a Bank Guarantee/ DD/Locle MICR cheque for an amount equivalent to 5%
(five percent) of the Contract Price .
Failure of the same shall make the contractor liable for any penalty as decided by AMC. At
present a policy is framed by Audit department of AMC to charge 4% interest for the balance
period and discontinuity period.
The Security Deposit to be provided by the successful bidder in the form of a bank guarantee as
per format shall be issued as per Memorendum of work.
(E) Retention :-
a). Retention @ 2% of the value of work done will be deducted from each RA bill. It will be released
along with release of payment of Final Bill.
4. Approved Bank: - As per Annexer -I
5. No advance for machinery or materials will be given.
6. Mobilization advance will not be given.
7. Quantities in B.O.Q. may vary up to any extent and contractor shall not claim any extra rate for the
8. Penalty: -10 percent of the balance work on Date of Completion Date or extended time limit. &
As per AMC Rule
9.Tax, Duties on Materials
All charge on account of Octroi ,excise duties, terminal tax, sales tax. Service tax, VAT (exculding
GST) etc. on material procurement or any other component for the works from any source shall be
borne by the contractors.
Special Clause:
As per construction works welfare cess Act – 1996 non-refundable one percent of tender amount shall
be deducted against works welfare cess.
Seal and Signature of the Bidder Addl.City Engineer
Date: (West Zone)
General terms & conditions
1. Tenderer should be registered in PWD/ in Govt. R&B /CPWD / AMC or equivalent registration with any
other state Govt. or institutions. Copy of registration should be attached with tender document.
Tenderer who was not registred in AMC must be get registred in panel of approved AMC contractor.
2. A booklet of FORM B-1 of Gujarat State Roads & Building Department / Water Resources Department
with the correction slips made up to 15-08-1999 may be referred. (only English version) Clause No. -2
liquidated damages for delay shall be overrule by A.M.C.’s M.C.circular no.- 9 dt. 18/05/2012.
3. In the specification “as directed" / "approved" shall be taken to mean "as directed / "approved" by the
Engineering in charge.
4. Wherever a reference to any Indian standard appears in the specifications, it shall be taken to mean as
reference to the latest edition of the same of force on the date of agreement.
5. In "Mode of measurement" in the specifications wherever a dispute arises in the absence of specific
mention for a particulars point / aspect, the same in the relevant Indian Standards shall be referred to.
6. All measurement and computations, unless otherwise specified shall be carried out nearest to
the following limits :-
i) Length, width and depth, Height 0.01 Meter
ii) Areas 0.01 Sq.mts.
iii) Cubic contents 0.01 Cu. mts.
In recording dimensions of work, the sequence of length, width and height (Depth) or thickness shall be
7. Definite particulars covered in the items of work, though not mentioned or elucidate in its
specifications shall be deemed to be included therein.
8. Approval of the samples of various materials given by the Engineer in charge or AMC's Consultant shall
not absolve the contractor from the responsibility of replacing defective materials brought on site or
materials used in the work found defective at a later date. The contractor shall have no claim to any
payment or compensation whatsoever on account of any such materials being rejected by the Engineer
9. The contractor’s rate for the item of work shall be for the work completed in all respect.
10. All materials including those of electrical shall be got approved by the Engineer in charge/ Architect
before using them in the work.
11. Materials as and when rejected by the Engineer in charge or AMC's Consultant shall be removed from
the site of work within 24 hours.
12. All work shall be carried out in a manner as per standard engineering practice.
13. All tools, templates, machinery and equipment for correct execution of the work as well as for checking
lines, levels, alignment of the works & all precautionary measures during execution shall have to be
kept in sufficient numbers and in good working condition at the site of the work. All excavated trench
shall be kept covered with barricade and caution tap.
14. Special modes of the construction not adopted in general Engineering practice, if proposed to be
adopted by the contractor shall be considered only if the contractor provided satisfactory evidence that
such special mode of construction and completion of work to the required strength and quality.
Acceptance of the same by the Engineer in charge shall not however, absolve the contractor from the
responsibility of any adverse effect and concordance of adopting the same in the course of exaction or
completion of the work.
15. The contractor shall be responsible for observing the rules and regulation imposed under the "Minor
Mineral Act", and such other laws and rules prescribed by the Government from time to time.
16. All necessary safety measures and precautions (incl. those laid down in the various relevant Indian
Standard) shall be taken to engrave the safety of men, materials and machinery on the work and also of
the work itself.
17. Quantity measured in the tender is approximate. It may increase or decrease looking to the quantum of
actual work for which no any claim shall be entertained by A.M.C.
18. Contractor shall have to execute extra item if required or as per need of AMC.
19. The work in general shall be carried out as per standard specifications of the relevant items to be
executed & as per the instruction of Engineer in charge & as per the guidance of AMC's Consultant for
20. The general terms & conditions of the contract shall be applicable & shall be binding on the contractor.
The contract agreement shall have to be executed between AMC & the agency to which work is
awarded for execution.
21. For Tender amounting below 10 lakh LOI shall be issues within 3 days after received of sanctioned
tender and resolution.Within 10 days contractor has to submit SD and after reciveing SD Work order
shall be issue to contractor and the time limit shall be start from the date of issue of the written work
order to the contractor.
For Tender amounting above 10 lakh LOI shall be issues within 3 days after received of sanctioned
tender and resolution .Within 15 days contractor has to submit SD and after reciveing SD work order
shall be issue to contractor and the time limit shall be start from the date of issue of the written work
order to the contractor.
Security Deposit of 5% of sanctioned tender amount shall be deposited by pay order / demand
draft / cheque or Bank Guarntee of nationalized bank/scheduled bank only. Contractor shall have to
sign contract paper with AMC.The contractor shall be fined 4% of interest per year for delay in
submission of S.D and shall be deducted from contractor’s bill.
22. In case of any ambiguity in specifications mentioned in this tender, the interpretation given by M.C. Or
His DesignetedOfficerwill be final and binding to the Contractor.
23. The contractor shall take no advantage of any apparent error or omission in drawing or specification
and the Engineer -in-charge shall make such corrections and interpretations as necessary to fulfill the
intent of the plants and specifications.
24. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity arises.
25. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the Municipal Corporation. will
be payable by the contractor.
26. No any kind of price rise / price escalation / price variation for cement, steel or labour shall be paid.
27. Contractor is requested to see the site physically before tendering. He is also requested to quote the
rates keeping in view of all the points mentioned in relevant pages of tender documents.
28. Water Supply: The contractor shall arrange at his own cost, a suitable supply of piped water for the
construction of the works and provide a satisfactory supply of potable water for drinking, washing,
sanitation and cleaning down. The contractor will be responsible for all the costs where applicable of
connection, meter installation, water consumed, water required for testing purposes, disconnection
and the laying, maintenances and ultimate removal of any distribution system around the site.
29. Electricity:Electric supply will be made available at the site by the Contractor and the contractor must
make his own arrangements with the Corporation and Electricity Supply Authorities and with other
contractors to connect and to take a supply from such services, paying all costs in connection
The Contractor shall be entitled to use supply Electricity as may be available on the site for purpose of
the work and shall pay such charges as is fixed by the appropriate supply Authorities.
In case there is any delay in supply of power site of any interruption or fault in the power during the
work. No compensation shall be paid for idle labor staff, machineries and for use of diesel operating
sets etc. as the case may be.
30. Tenders shall submit all the valid/certified documents in support of their initial/eligibility criteria
mentioned above along with the bid. They shall have also to submit the income tax clearance certificate
and solvency certificate.
31. No advance such as secured advance machinery advance, mobilization advance or materials advance
32. The contractor shall get the electrical works executed through the authorized Government approved
licensed electrical person or firm in appropriate category in accordance to contractual provisions.
33. The electrical works shall be carried out strictly in accordance with the directives issued by Engineer in
34. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the tender items varies or the scope of work changes & thereby total
amount of work increases/ decreases.
(ii) If the work gets delayed/ postponed for some administrative/ technical decision what so ever.
35. In case of any dispute, decision of Municipal Commissioner shall be final and binding on the
36. Tenders which do not fulfill all or any of conditions or are submitted incomplete in any respect will be
rejected. Municipal Commissioner reserves the right to increase/decrease the scope of work. No any
claim to that effect shall be entertained. The Municipal Commissioner also reserves the right to reject
any or all the tenders without assigning any reason thereof.
37. The contractors are requested to quote their rates considering above tender conditions.
38. The contractor shall have to execute the contract agreement after received work order.
Even though in special case, If work is not started because of monsoon or any other special
reason (like site is not available and due to unavoidable circumstances arise), after evaluation of
situation the actual date of starting of work will be consider after approval of Dy.M.C. (Southzone)
39. The Contractor shall not claim for increase or decrease in the quantity of the BOQ item or the scope of
40. The R.A bill / final bill payment shall be made as per the latest A.M.C policy / circular for the work done
by the contractor.
41. Conditional tenders will not be accepted.
Signature of contractor with seal Additional City Engineer (West Zone)
Date Ahmadabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
ENGGNIERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 12 monthsafter the order to start the works. Progress of work should
be in proportion to time limit. The details of reinforcement of R.C.C. work shall be as per design and
instructions of Add. City Engineer and his order will be considered final.
The contractor shall have to maintain account of steel, cement and other materials that may
be brought by him on site. This account shall be regularly maintained and kept open for inspection by
Municipal Staff. Watering of all the items shall be as per instructions otherwise no payment shall be
made to contractors. Mixing of concrete shall be done by concrete mixer machine. Arrangements of
binding vibrator for R.C.C. works if required shall have to be made by the contractor.
The contractor shall be remain responsible for Workmen’s compensation if any accident. The
contractor shall arrange for barricading at night and arrangement of Pagi at night to direct the traffic.
He shall be responsible for any damage to public. If any incident happen, during the execution of work.
In case of dispute for unseen or overlooked items the decision of the Dy. City Engineer shall be final.
The contractor shall have to give site clean of all rubbish during the work and at the time of completion
of work and hand over the site with final finishing of the work as directed. All the rejected materials
shall be removed from site within 24 hours by contractor at this risk and cost. Debris shall have to cart
daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose contractor
shall have to prepare through of bigger size and mix the mortar in the required proportion. In
oncase he shall be allowed to mix the mortar either on floor or any finished surfaces. The
contractor shall have to make his own arrangement for water required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the contractor
and he shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest SOR or if item
is not available in SOR than based on current market rates. In case of extra item decision of Add. City
Engg. shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the
propose work the contractor shall carry out the same at his quoted rates without charges any extra
and the contractor will have to carry out the works and he will be paid at the rate quoted by him. No
claim for extra rate for subsequent changes in site and design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors shall
have to prepare the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will be
fully responsible for compliance of the various provisions under contract Act. 1970 and the Rules
framed the to under.
The tender for the work shall remain open for a period (180) days from the date of opening of the
tenders for this work and that the tenderer shall not be allowed to withdraw on modify the offer on his
own during the period. If any tenderer withdraw or makes any modifications or addition in the terms
and conditions of his tender not acceptable to the Municipal Corporation the Municipal Corporation
shall without prejudice to any right or remedy be at liberty to forfeit in full the said earnest money and
black list the contractor.
If work is not started within specified time limit the penalty as per rule & tender condition delay of
start shall be recovered separately from the immediate bills payable to the contractor. Contractor has
to make his own arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully:-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in form of
iv) Condition of Form - B1 Standard Specification of material & code of practice will be applicable.
Form B1 can be is available in website. Specification shall be as per ' R& B Dept. - Govt. of
Gujarat booklets of Building Works & and Road Works Specifications published by Gujarat
Book Depot, Sector-21. Gandhinagar.
v) All the works Should be done as per specifications specified in Table. Item shall be executed
AS PER SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS GIVEN BY ENGG-
IN CHARGE. All the Specifications should be considered as R & B S.O.R & All Electrical Item
works should be done as specified in table. The works should be done as per Instruction of
Engineer In Charge. All the Specifications related to electrical works should be considered as
Per R & B Electrical S.O.R. The Make and Work Metholody of All of the above items specified
in above tender Will be the Final Decision of Engineer In Charge OrAdditonal City Engineer.
vi) Important Note:-
As well as Considered Item Specifications as Per Item Given, not by serial number, the specifications of
items which are not mentioned in BOQ Item, Specifications should be considered as per AMC
Sor Current Approved Rates for Civil and Electrical Works, as per Available on Site of
Ahmedabadcity.gov.in All the Specifications should be Considered as per Schedules Rates of R
& B Division of both civil and Electrical Works. Hence it an ARC Tender All the Quantity Would
Vary as per Instruction of Engineer in Charge. No Rate would be given Extra for Increase or
Decrease in the Quantity of The BOQ Scheduled Items.
CONTRACTOR'SSIGNATURE ADD.CITYENGINEER
& STAMP (West Zone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 25 Part-1.pdf
Tender No. 25 Part-2.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .