| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC B 17 175 KALYANI NADIA | KALYANI | NADIA | WEST BENGAL | ₹3.0 L | L1 | Accepted-AOC Lowest Bidder Rate |
| 2 | L2₹3.1 LRejected-Finance | ₹3.1 L | L2 | Rejected-Finance L2 |
| 3 | L3₹3.1 LRejected-Finance B 5 117 KALYANI NADIA 741235 | KALYANI | NADIA | WEST BENGAL | 741235 | ₹3.1 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | KUNDU ELECTRICAL ENTERPRISE L2 | STANDARD ENGINEERING L1 | KARTICK BAL L3 |
|---|---|---|---|---|---|---|
| 1.00 | Supply and delivery at site of 20KVA, 3phase, oil
cooled type Servo Motor operated copper wound
line voltage corrector conforming to IS-9815 (Pt.-1)-
1994 suitable for un-balanced input voltage with
following specification including first filling oil as per
IS-335 where applicable.(Make : Approve make of
P.H.E. Dte.) | 1 | set | 1,84,000 ₹1.8 L | 1,83,450 ₹1.8 L | 1,83,980 ₹1.8 L |
| 1.01 | Input Voltage:- 3 phase, Main supply may or may
not be balanced with respect to Phase to Phase-
225V-500V Phase to Neutral-130V-290V | 1 | item | - | - | - |
| 1.02 | Output voltage:-3 phase balanced output voltage.
Phase to Phase- 400Vor 415V± 1%, Phase to Neutral-
230V-240V ± 1% (Provision should be made to adjust
the Variation of output voltage per phase by a
variable pot oil within ± 5% of output). | 1 | item | - | - | - |
| 1.03 | Line regulation:- Out put voltage should remain well
with ±1% of set voltage (From Minimum to
Maximum i.e. either 400V. or 415V. supply
variation). | 1 | item | - | - | - |
| 1.04 | Load regulation : Output voltage should remain
neutral well within ±1% of set voltage be ( From no
load to full load ) i.e. either 400V. or 415V | 1 | item | - | - | - |
| 1.05 | Correction speed:- Better than 35 Volt / Second | 1 | item | - | - | - |
| 1.06 | Efficiency:- Better than 95% on full load. | 1 | item | - | - | - |
| 1.07 | Cut off limit (minimum &maximum ) by limit switch
with Audio & Visual | 1 | item | - | - | - |
| 1.08 | Metering Indication:- By Selector switch provision
should be made available to measure input mains
supply and output voltage other stabilizer for load
current measurement an Ammeter with selector
switch should be available. | 1 | item | - | - | - |
| 1.09 | Lamp Indication :- For Input & Output should be
provided. ( 3 lamps per side) | 1 | item | - | - | - |
Tender Value
Refer Docs
EMD Value
₹6,263
Closing Date
20 Aug 2025, 11:00 amClosed
The Assistant Engineer, EMSD-II,PHE Dte.
Office of the Assistant Engineer.Eastern Mechanical Sub Division - II, P.H. Engineering Directorate.A2 Market, Rail Gate, Shiv Mandir, P.O.- Kalyani, Dist.- Nadia.
Supply delivery and installation of voltage corrector device with allied electrical works at Joypur Ph-I water supply scheme Block-Hanskhali, Dist.-Nadia.
2025_PHED_887873_3
WBPHED/AE/EMSD-II/NIET_10 of 2025-2026
Open Tender
MECHANICAL
30 days
Kalyani
Please refer Tender documents.
5 documents required · 5 mandatory
₹6,263
18 Jun 2026
12 Aug 2025
22 Aug 2025
12 Aug 2025
20 Aug 2025
13 Aug 2025
Amount
Supply and delivery at site of 20KVA, 3phase, oil cooled type Servo Motor operated copper wound line voltage corrector conforming to IS-9815 (Pt.-1)- 1994 suitable for un-balanced input voltage with following specification including first filling oil as per IS-335 where applicable.(Make : Approve make of P.H.E. Dte.)
Input Voltage:- 3 phase, Main supply may or may not be balanced with respect to Phase to Phase- 225V-500V Phase to Neutral-130V-290V
Output voltage:-3 phase balanced output voltage. Phase to Phase- 400Vor 415V± 1%, Phase to Neutral- 230V-240V ± 1% (Provision should be made to adjust the Variation of output voltage per phase by a variable pot oil within ± 5% of output).
Line regulation:- Out put voltage should remain well with ±1% of set voltage (From Minimum to Maximum i.e. either 400V. or 415V. supply variation).
Load regulation : Output voltage should remain neutral well within ±1% of set voltage be ( From no load to full load ) i.e. either 400V. or 415V
Correction speed:- Better than 35 Volt / Second
Efficiency:- Better than 95% on full load.
Cut off limit (minimum &maximum ) by limit switch with Audio & Visual
Lamp Indication :- For Input & Output should be provided. ( 3 lamps per side)
MCB Protection: For Input side.
Load protection : HRC Fuse on each output phase should be available
Output over shoot:- Beyond 210V to . 255V /phase in case of “ MANUAL MODE” & voltage protection :AUTO MODE” operation.
VISUAL Indication for under voltage & over voltage of output
Manual Mode:- Up & Down correction with O / P voltage over shoot protection. Beyond 210 V-255 V. per phase.
Nature of cooling:- Oil cooled system
Electric current over load protection
Circuit for delay output
Input high voltage cut-off above 500 V.
Mode of Operation:- AUTO/MANUAL with a provision to restore the normal working of the unit “STANDBY OPERATION” should be available in case of any Electronic failure in auto mode
Auto Mode:- Normal * Standby.( Manufacturing test certificate should be Provided at the time of delivery).
Supply and delivery of following materials at site:
100Amp. 4 pole on load change over switch (Make: Approve make of P.H.E. Dte.)
100 Amp. Re-wireable type TPN main switch (Make: Approve make of P.H.E. Dte.)
100 Amp. 4 way Copper busbar chamber box by 16 SWG sheet steel enclosure including porcelain Chair etc. with painting complete as per direction of the EIC. (Approved make)
25 sqmm. 4 core PVC insulated 1.1KV, AI., Ar. cable(Make: Approve make of P.H.E. Dte.).
Making brick built foundation with supplying of all required materials suitable for the above Voltage stabilizer by (4:1) cement mortar including holding down foundation bolts(If required) and plaster with neat cement finish as per direction of E.I.C.
Fitting, Fixing and connection of above supplied changeover switch, bus-bar and Main Switch as in item no 2.01 to 2.03 on the wall by supplying all necessary materials to complete the job.
Installation of the above voltage stabilizer of item no. 1 on the foundation including all connection complete as per direction of E.I.C.
Drawing and connection of cable on wall as in item no. 2.04 and all connection complete with all equipment as per requirement and as per direction.
Making joints of the cable by supplying compression type gland thimple, socket etc.as per requirement and as per direction of EIC.
Double earthing the whole installation complying with IE rule including supplying of all necessary earthing materials to complete the job as per direction of EIC.(inside P/H)
Add GST @ 18%
Add LWC @ 1%
KUNDU ELECTRICAL ENTERPRISE (BID ID -6836581)
KARTICK BAL (BID ID -6853286)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid