Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹74.5 CrAccepted-AOC | ₹74.5 Cr Quoted ₹76.7 Cr | L1 | Accepted-AOC The bidder is found to be L1 (quoted low). It is found to be reasonable upon negotiating the rate for Award of Contract. |
| 2 | L2₹79.6 CrRejected-AOC | ₹79.6 Cr | L2 | Rejected-AOC The bidder is found to be L2 (quoted high). |
Tender Value
₹71 Cr
EMD Value
₹1.4 Cr
Closing Date
24 Aug 2023, 1:00 pmClosed
Addl Chief Engineer II, Water Resource Deoartment.
PWD Complex, Khuyathong-795001
Package - IV (SH Construction of bridge for Motorable, Pedestrian etc.)
2023_WRD_2170_1
No.ACE-II/WR/F-62/2023/20
Open Tender
Civil Works
730 days
As Per Tender Document
Please refer Tender documents.
6 documents required · 6 mandatory
₹20,000
EE,Electrical and Mechanical Division WRD.
₹1.4 Cr
Imphal.
13 May 2025
25 Apr 2023
24 Aug 2023
25 Apr 2023
24 Aug 2023
6 May 2023
25 Apr 2023 - 25 Jul 2023
17 Jul 2023
Amount
Package - IV (SH Construction of bridge for Motorable, Pedestrian etc.)
BEKEM INFRA PROJECTS PRIVATE LIMITED
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid